BLD-Final | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,, ok to move items in,, need to make hand rail meet code
|
BLD-Final | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | PEND |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Final | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,, all ok except the upper exterior guard/hand rail
|
FIRE-Final Inspection | 5/27/2015 | 5/28/2015 | 5/28/2015 | P | CANC |
Troy Cobbley
|
|
|
No life safety sign off required. I left message on contacts voice mail
|
PubWorks Occupancy Approval | 5/28/2015 | 5/28/2015 | 5/28/2015 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading, retaining walls, and revegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 3/5/2015 | 3/6/2015 | 3/6/2015 | P | PART |
Tony Young
|
|
|
change day per Eric Phone #: ###-####,, c/n posted on front stairs to meet code by final,, ok to cover interior
|
BLD-Energy code compliance | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Conference | 3/5/2015 | 3/5/2015 | 3/5/2015 | P | FAIL |
Tony Young
|
|
|
Stair consult - Eric Phone #: ###-####,, exterior stairs not per code at this point
|
BLD-Framing/Rough-in | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Tony Young
|
|
|
Eric Phone #: ###-#### please call 1/2 hr prior,, ok to insulate
|
BLD-Framing/Rough-in | 3/2/2015 | 3/3/2015 | 3/3/2015 | A | PEND |
Tony Young
|
|
|
Eric Phone #: ###-#### please call 1/2 hr prior
|
BLD-Framing/Rough-in | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | PART |
Tony Young
|
|
|
Eric Phone #: ###-#### please call 1/2 hr prior,, ok to start insulation,, verify elec pass,, redo some shear by front door,, nail girders off,,, strap plates,, add nails in hangers,, add hangers as needed
|
Plan Modification Accepted | | | 2/11/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/11/2015 | | 2/11/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PART |
Tony Young
|
|
|
Shear // Eric Phone #: ###-####,, ok to build double wall on exterior,, need engineer to ok other shear as built or provide fixes due to changes with hold downs and openings
|
BLD-Foundation | 11/21/2014 | 11/21/2014 | 11/21/2014 | A | PART |
Jim Sly
|
|
|
Pat-WALL Phone #: ###-#### Walls at Stairway and 10' South retaining wall.
|
BLD-Foundation | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | PEND |
Jim Sly
|
|
|
Pat Phone #: ###-#### Told Contractor they cannot pour per cold weather concrete provisions.
|
BLD-Footing | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | PART |
Jim Sly
|
|
|
Pat Phone #: ###-#### 80 percent complete WIP appears OK.
|
PubWorks Subgrade Approval | 11/10/2014 | 11/10/2014 | 11/10/2014 | | DONE |
Jason C. Taylor
|
|
|
*FOOTINGS & PADS ONLY*A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 10/28/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/28/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/28/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/28/2014 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/30/2014 | 9/30/2014 | 10/27/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Pending Hillside, 10/16 TH L2 hillside ePlan**
|
Routing PW Grading-Hillside | 10/27/2014 | | 10/27/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2014 | | DONE |
|
|
|
|
Telephone call | | | 10/27/2014 | | DONE |
|
|
|
called Mark Wagner and left vm need GC, RP and verification of value on application.
|
Routing - PLAN CHECK | 10/17/2014 | | 10/24/2014 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/17/2014 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/30/2014 | | 10/17/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan review
|
Routing - FIRE | 9/30/2014 | 9/30/2014 | 10/1/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department Vehicle access. Additionally, this structure is required to comply with the 30 foot Defensible Space provisions of the Boise Municipal Code 7-01-69 section 4920.
|
Routing PW Grading-Hillside | 9/30/2014 | | 9/30/2014 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan. JCT ###-####
|
Routing - MECHANICAL | 9/30/2014 | | 9/30/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/30/2014 | | 9/30/2014 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 9/30/2014 | | 9/30/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/30/2014 | | 9/30/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/30/2014 | | 9/30/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection and Approval Required Prior to Earth Disturbance
|
Plans ACCEPTED BY PLAN TECH | | | 9/30/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/30/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/30/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/23/2014 | | FAIL |
Candy A. Nichols
|
|
|
need ACCA, res-check, attic access, and drawing uploaded individually not in packet
|
Application received | | | 8/29/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2014 10:02AM
|