Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-02574
StatusIssued
Name TODD RUSS L
Site Address 742 E STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(Plan Modification to size of the shed addition, new size of the shed to be 12’x20’ (240 sq. ft.)) Permit is for the addition to a 242 sq. ft. (11’x22’) attached shed addition to the side of the garage, work to include a monolithic footing, 2x wall construction, 2x10 rafters and a metal roof, all work to be per the approved plans, current local codes and plan review report. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/1/20166/1/20166/3/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection6/2/20166/2/20166/3/2016 PEND
DetailsDave Hannah
BLD-Framing/Rough-in1/15/20161/19/20161/19/2016APASS
DetailsDave Hannah
would like call ahead; Ben Phone #: ###-####
BLD-Foundation11/20/201511/23/201511/23/2015APASS
DetailsDave Hannah
Russ Phone #: ###-####
OVERRIDE  11/20/2015  
Plan assigned to (JG)11/20/201511/20/201511/20/2015 PASS
DetailsJavier Guzman
Routing - PLAN CHECK11/20/2015 11/20/2015 PASS
DetailsJavier Guzman
Plan Modification
Inspection Record Card- Bld  11/20/2015 DONE
DetailsJavier Guzman
Inspection Record Card- Bld  11/20/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/20/2015 DONE
Permit Ready to Issue  11/20/2015 DONE
No Fees per Javier
(F) Reprint permit  11/20/2015 DONE
CHANGE STATUS TO (ISS)  11/20/2015 DONE
BLD-Footing6/3/20156/4/20156/4/2015APASS
DetailsDave Hannah
plans on the deck; Russ Phone #: ###-####
Issue PAID IN FULL permit  6/3/2015 DONE
OVERRIDE  6/2/2015  
Routing Walk-In (Zoning)6/2/20156/2/20156/2/2015APASS
DetailsMatthew A Halitsky
Routing Walk-In (BLD)5/29/20155/29/20156/2/2015PPASS
DetailsJavier Guzman
Telephone call  6/2/2015 DONE
notified homeowner of the fees due and permit is ready for pick-up
Inspection Record Card- Bld  6/2/2015 DONE
DetailsJavier Guzman
Case Summary (BLD)  6/2/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/2/2015 DONE
Permit Ready to Issue  6/2/2015 DONE
all requirments met
Routing Walk-In (Zoning)8/29/20148/29/20148/29/2014PFAIL
DetailsColleen T Carroll
Will need a C of A
1st review completed  8/29/2014 DONE
DetailsJavier Guzman
Application received 8/29/2014