Zoning Approval | 3/5/2015 | 3/5/2015 | 3/5/2015 | | DONE |
Andrea Tuning
|
|
|
|
Letter of compliance/Occupancy | | | 2/23/2015 | | DONE |
|
|
|
|
Second Notice | | 2/12/2015 | 2/9/2015 | | DONE |
|
|
|
This permit finaled on the web by Paul Saucerman
|
First Notice | 1/16/2015 | 1/16/2015 | 2/2/2015 | | DONE |
Candy A. Nichols
|
|
|
mailed 2/2/15
|
BLD-Final | 1/15/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Jim Sly
|
|
|
Building Final Inspection - Shane is the superintendent ###-#### Phone #: ###-#### Inspection requested via web by Paul Saucerman
|
DOC - Permit Finaled | 1/16/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 1/15/2015 | 1/16/2015 | 1/16/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 1/16/2015 | 1/16/2015 | 1/16/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Framing/Rough-in | 12/2/2014 | 12/3/2014 | 12/3/2014 | P | PART |
Jim Sly
|
|
|
Shear wall framing inspection / call Dan Lyda at the site if you have any questions ###-#### Phone #: ###-#### Inspection requested via web by Paul Saucerman Exterior shear nailing only OK.
|
BLD-Wall Bracing | 11/21/2014 | 11/25/2014 | 11/25/2014 | P | PART |
Jim Sly
|
|
|
Dan Phone #: ###-#### Roof nailing only......OK.
|
BLD-Other | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PASS |
Jim Sly
|
|
|
Rebar - Don Phone #: ###-#### Wall OK.
|
BLD-Footing | 10/27/2014 | 10/28/2014 | 10/28/2014 | A | PASS |
Jim Sly
|
|
|
late am // Dan ###-#### Verified 21' #3 rebar U fer in footing.
|
BLD-Footing | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | CANC |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
BLD-Footing | 10/23/2014 | 10/27/2014 | 10/27/2014 | A | NR |
Mike Jordan
|
|
|
Dan Phone #: ###-####. Will reschedule for the pm.
|
OVERRIDE | | | 10/17/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/17/2014 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2014 | | DONE |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 9/25/2014 | | 10/1/2014 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 9/5/2014 | | 10/1/2014 | | PASS |
John Menard
|
|
|
1st Review Completed 9/15/2014
|
Routing - PLAN CHECK | 9/25/2014 | | 9/27/2014 | | PASS |
John Menard
|
|
|
|
Routing PW Solid Waste | 9/25/2014 | | 9/26/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Route to Impact Fee Review | 9/19/2014 | 9/22/2014 | 9/23/2014 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 9/19/2014 | | DONE |
John Menard
|
|
|
|
Routing PW Drainage | 9/8/2014 | | 9/19/2014 | | PASS |
Brian Murphy
|
|
|
bld pad was part of masterplan see kelly k. letter
|
Routing PW Street Lights | 9/8/2014 | | 9/19/2014 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing Off Site - STRUCTURAL | 9/5/2014 | | 9/18/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/5/2014 | | 9/15/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 9/5/2014 | | 9/12/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Sewer Design | 9/8/2014 | | 9/10/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 9/5/2014 | | 9/9/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-09-14
|
Routing - Addressing | 9/5/2014 | | 9/9/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Solid Waste | 9/8/2014 | | 9/9/2014 | | FAIL |
Peter J. McCullough
|
|
|
|
Routing - PUBLIC WORKS | 9/5/2014 | | 9/8/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 9/8/2014 | | 9/8/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 9/5/2014 | | 9/8/2014 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING Land Div | 9/5/2014 | | 9/5/2014 | | PASS |
Dave Abo
|
|
|
|
Intake Approval | | | 9/5/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 9/5/2014 | | 9/5/2014 | | DONE |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 9/5/2014 | | 9/5/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection and Approval Required Prior to earth disturbance. Contact PDS front desk to reschedual
|
Intake Approval | | | 9/3/2014 | | FAIL |
|
|
|
Please provide the following Items.
Provide a site drainage report
Provide an O&M manual.
Upload the Verification of legal lot and parcel separately from the submittal checklist.
|
Application received | | | 9/2/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 2 2014 9:03AM
|