Print Statement | | | 3/2/2016 | | DONE |
|
|
|
|
Third Notice | | 1/19/2016 | 2/11/2016 | | DONE |
|
|
|
sent with letter
|
Third Notice | | 12/15/2015 | 1/14/2016 | | DONE |
|
|
|
|
Third Notice | | 11/14/2015 | 12/10/2015 | | DONE |
|
|
|
|
Second Notice | | 10/22/2015 | 11/9/2015 | | DONE |
|
|
|
Mailed 11-10-15
|
First Notice | 9/23/2015 | 9/23/2015 | 10/12/2015 | | DONE |
Mike Jordan
|
|
|
Mailed 10-13-15
|
BLD-Final | 9/22/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the two project related fire sprinkler permits are finaled
|
BLD-Final | 9/17/2015 | 9/18/2015 | 9/18/2015 | P | CANC |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
PubWorks Occupancy Approval | 7/20/2015 | 7/20/2015 | 7/20/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PEND |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Wants to open courtyard area. Needs zoning, electrical, mech, and public works to ok this area prior to use. Noted that all construction within the courtyard area is completed.
|
Zoning Approval | 7/15/2015 | 7/15/2015 | 7/15/2015 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | DONE |
Troy Cobbley
|
|
|
Tom and I went over the location for the "Emergency Stop" sign for the gas valve to the outdoor fire pit. I'm ok for the fire pit area to be used.
|
BLD-Conference | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | CANC |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
FIRE-Conference | 6/25/2015 | 6/26/2015 | 6/29/2015 | A | DONE |
Jim Page
|
|
|
Questioned regarding the location of a fire extinguisher for the outside fire pit, surveyed and verified an acceptable location.
|
BLD-Foundation | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Mike Jordan
|
|
|
Tom-rebar Phone #: ###-####. Column footings for new signs westside of building C.
|
BLD-Footing | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | CANC |
Mike Jordan
|
|
|
rebar Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2015 | 4/30/2015 | 4/30/2015 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Steel stud framing for new headers where existing arches where removed.
|
BLD-Footing | 4/30/2015 | 4/30/2015 | 4/30/2015 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Footing for new columns for new signs, east side of building B.
|
Issue PAID IN FULL permit | | | 4/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/10/2015 | | |
|
|
|
|
Extend Review Timeline | | | 4/10/2015 | | DONE |
|
|
|
180 days granted by JCB. See attached document.
|
Permit Ready to Issue | | | 4/10/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Expiration Notice | 4/9/2015 | 4/30/2015 | 4/9/2015 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 4/9/2015 | | DONE |
|
|
|
Left message for Cherl about emailing Jason B for an extention and letting her know it was one of those plans that were in review for more than 6 months
|
Meeting | | | 3/26/2015 | | DONE |
Rita DeYoung
|
|
|
Per Carl need new cert of value due to reduction in scope of work. Architect is working with gc to get documents ready to submit to City.
|
Routing - PLAN CHECK | 3/19/2015 | | 3/19/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 9/9/2014 | | 3/19/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - FIRE | 3/6/2015 | 3/6/2015 | 3/13/2015 | | PASS |
Scott Arellano
|
|
|
No comments attached to plans.
|
Routing PW Drainage | 3/6/2015 | | 3/9/2015 | | PASS |
Jason C. Taylor
|
|
|
Project approved. Jason Taylor
|
Routing - PUBLIC WORKS | 3/6/2015 | | 3/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 3/5/2015 | | 3/5/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH15-00048
|
Routing PW Drainage | 12/10/2014 | | 12/11/2014 | | FAIL |
Jason C. Taylor
|
|
|
***3rd Review *** Need geotechnical report as required by Boise City Stormwater Manual. Jason Taylor ###-####.
|
Routing Off Site - STRUCTURAL | 11/19/2014 | | 12/3/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 12/2/2014 | | 12/3/2014 | | FAIL |
Jason C. Taylor
|
|
|
Need geotechnical report as required by Boise City Stormwater Manual. Jason Taylor ###-####.
|
Routing - PLAN CHECK | 11/19/2014 | | 12/3/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 11/19/2014 | | 11/21/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 11/19/2014 | 11/19/2014 | 11/20/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 11-20-14
|
Routing - PUBLIC WORKS | 11/19/2014 | | 11/19/2014 | | PASS |
Beverly Mountain
|
|
|
|
1st review completed | | | 10/2/2014 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/9/2014 | | 10/2/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/9/2014 | | 10/2/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 9/9/2014 | 9/9/2014 | 9/18/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-18-14
|
Routing PW Sewer Rating | 9/18/2014 | | 9/18/2014 | | PASS |
Beverly Mountain
|
|
|
Splash pad approved by Drainage to go to seepage bed. bam
|
Routing - PUBLIC WORKS | 9/9/2014 | | 9/18/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 9/9/2014 | | 9/12/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Drainage | 9/11/2014 | | 9/11/2014 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Routing - Erosion and Sediment | 9/9/2014 | | 9/10/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection Required Prior to any Saw Cutting or Earth Disturbance
|
Routing - PLANNING Land Div | 9/9/2014 | | 9/10/2014 | | PASS |
Dave Abo
|
|
|
Parcel H of ROS 4341
|
Intake Approval | | | 9/8/2014 | | PASS |
John Menard
|
|
|
Plan intake review approved
|
Application received | | | 9/4/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2014 11:21AM
|
Pending Assignment by JCM | 9/9/2014 | | | | |
John Menard
|
|
|
|