BLD-Final | 9/24/2014 | 9/25/2014 | 9/25/2014 | A | PASS |
Dave Hannah
|
|
|
Shawn Phone #: ###-####
|
DOC - Permit Finaled | 9/25/2014 | 9/25/2014 | 9/25/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 9/8/2014 | 9/9/2014 | 9/10/2014 | P | PASS |
Jim Sly
|
|
|
Erik or ###-#### Phone #: ###-####
|
PubWorks Subgrade Approval | 9/10/2014 | 9/10/2014 | 9/10/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (PW Hillside) | 9/5/2014 | 9/5/2014 | 9/5/2014 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (BLD) | 9/5/2014 | 9/5/2014 | 9/5/2014 | A | CANC |
|
|
|
|
Routing Walk-In (Zoning) | 9/5/2014 | 9/5/2014 | 9/5/2014 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/5/2014 | 9/5/2014 | 9/5/2014 | A | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/5/2014 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 9/5/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 9/5/2014 | | | |
|
|
|
|