Permit Information
Permit NumberBLD14-02653
StatusFinaled
Name HCD INC
Site Address 11789 W EXECUTIVE DR
Project NameDFS Demising Wall
Customer NumberXREF BLD14-02948
ePlanReviewYes
Description
(Diversified Fluid Solutions) F tenant improvements to an existing 52,850 sq. ft. building to create a new 37,555 sq. ft. space by constructing a new full height tenant demizing wall with work to include the construcion of the new tenant demzing wall. This is a fully sprinklered building for area increase; any alteration to the sprinkler system will require a separate permit. This permit is for B and S1 occupancies only The architect has indicated that an additional T.I willl be submitted in the next 60 to 90 days for the warehouse are (33,595 sq. ft.) to be converted to an F1 occupancy. No racking over 8' in height is allowed under this permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/22/20152/2/2015 DONE
DetailsCandy A. Nichols
mailed 2-2-15
Permanent Occupancy  1/12/2015 DONE
DetailsCandy A. Nichols
BLD-Final1/8/20151/9/20151/9/2015APASS
DetailsMike Jordan
Please call 45 min before arriving Phone #: ###-#### Inspection requested via web by Dennis Harmon
BLD-Final1/7/20151/8/20151/8/2015PNR
DetailsMike Jordan
Mike
Please call me Dennis Harmon to go over final concerns Phone #: ###-#### Inspection requested via web by Dennis Harmon. Needs electrical final.
BLD-Conference1/7/20151/8/20151/8/2015ADONE
DetailsMike Jordan
I would like to talk to Mike concerning the plumbing permit attached to this permit. Phone #: ###-#### Inspection requested via web by Dennis Harmon. Had plumbing permit attached to the correct building permit.
BLD-Wall Bracing10/23/201410/24/20141/7/2015PCANC
DetailsMike Jordan
David Phone #: ###-#### Inspection cancelled from web by: Dennis Harmon
BLD-Final12/8/201412/9/201412/9/2014ANR
DetailsMike Jordan
Dennis Phone #: ###-####
FIRE-Final Inspection12/8/201412/8/201412/8/2014PPASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in10/22/201410/23/201410/23/2014PDONE
DetailsMike Jordan
david - call 30 mins prior Phone #: ###-####
BLD-Framing/Rough-in10/13/201410/14/201410/14/2014APART
DetailsMike Jordan
Please call 1 hour before. I have a question on the fire separation wall.
Will 2-3.5 in. walls work in place of a 6in. wall? This is a partial framing inspection due to fire sprinklers that need to be moved and the wall concerns. Phone #: ###-#### Inspection requested via web by Dennis Harmon. ok to one side 2hr. demissing wall.
Issue PAID IN FULL permit  10/8/2014 DONE
DetailsChristina Prado
Print Occupancy Form  10/8/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  10/7/2014 DONE
Telephone call  10/7/2014 DONE
emailed fees to Dennis Harmon
Routing - PLAN CHECK9/18/2014 10/6/2014 PASS
DetailsCarl D Madsen
Plans approved with conditions. Future tenant improvement to be submitted in the next 60 to 90 days for the DFS warehouse area for conversion to a manufacturing area. The warehouse area is not to be used for manufacturing under this permit. 10-6-14 CDM.
1st review completed  10/6/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/6/2014 DONE
Routing - FIRE10/3/201410/3/201410/3/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 10-03-14
Routing - Addressing10/2/2014 10/2/2014 PASS
DetailsEmily Dixon
Routing - FIRE9/18/20149/18/20149/24/2014 FAIL
Details
See Fire Plan Review 09-24-14
Intake Approval  9/15/2014 PASS
Intake Approval  9/9/2014 FAIL
Please provide or indicate the following items on the plans.
1. Please provide a second application for the the remaining space including square footages and occupant loads.
2. Indicate the square footages and occupant loads for both spaces.
3. Revise the certificate of value to indicate any work being done in all areas including mechanical, electrical, plumbing and fire.
4.Provide a door and door hardware schedule.
5. indicate exit signs and emergency lighting.
6. indicate portable fire extinguishers.
7. Indicate accessibility upgrade work. (20% of the project value.
8. Indicate the existing restrooms and fixtures as each space is required to the minimum required fixtures.
9. Provide elevations and details for any point of service counters.
10. provide a list of commodities and method of storage.(contact Craig Hanson ###-####)
11. Indicate all required exit doors for both tenant spaces.
Application received  9/5/2014 DONE
Application submitted via PDS Online on Sep 5 2014 2:53PM