Permit Information
Permit NumberBLD14-02671
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 509 W MCGREGOR DR
Project NameCorporate Office Installation
Customer Number 
ePlanReviewYes
Description
(Corporate Office Installation)Office build-out on north side of building, will occupy remainder of building as it exists. COI moved into a portion of this structure under BLD11-00882. The shell and core were built under BLD07-02855. COI intended on eventually moving into the remainder of the structure and this is the permit to do so. This portion of office and a portion of warehouse have not been occupied since the building was constructed in 2007. Scope of work to included 1st time build out of office space as shown on approved plans. Lighting for warehouse and office area, mechanical including new RTU in new office location. A new ADA restroom will be installed under this permit. A separate racking permit is required for any racking installed over 8 feet in height. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. This is a non-separated use design.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/12/20151/19/2015 DONE
This permit finaled on the web by Brian McCoy
First Notice 12/29/20141/2/2015 DONE
DetailsChristina Prado
BLD-Final12/19/201412/19/201412/19/2014APASS
DetailsJim Storey
Please call 30 minutes prior to inspection for access code. Thanks Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy final ok card not on site
Permanent Occupancy  12/19/2014 DONE
FIRE-Final Inspection12/9/201412/9/201412/9/2014PPASS
DetailsForrest France
Fire life safety okayed pending approved style hardware is installed at the marked exits east side of building- to be done prior to structural final.
BLD-Final12/8/201412/9/201412/9/2014PFAIL
DetailsJim Storey
Please call 30 minutes prior to inspection for access code. Thanks Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy need door hardware/exit path/address#
BLD-Ceiling Grid Inspection11/11/201411/12/201411/12/2014APASS
DetailsJim Storey
Please call prior to inspection for access code Thank You Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy
BLD-Framing/Rough-in10/16/201410/16/201410/16/2014PPASS
DetailsJim Storey
Please call Kelly prior to inspection for door code. Thanks Phone #: ###-#### Inspection requested via web by Brian McCoy
Plan assigned to (AJS)9/18/20149/18/201410/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed 10/1Corporate office
Routing - PLAN CHECK10/2/2014 10/7/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  10/7/2014 DONE
Permit Ready to Issue  10/7/2014 DONE
DetailsCandy A. Nichols
Issue PAID IN FULL permit  10/7/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  10/7/2014 DONE
DetailsCandy A. Nichols
1st review completed  9/30/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK9/18/2014 9/30/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE9/18/20149/18/20149/22/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 09-22-14
Routing PW Sewer Rating9/18/2014 9/18/2014 PASS
DetailsJennifer Bruner
revised fees due to architect's explanation 9-22 jkb
Intake Approval  9/18/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLANNING9/18/2014 9/18/2014 PASS
DetailsSue Cummings
Interior work only
Routing - Addressing9/18/2014 9/18/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/18/2014 9/18/2014 PASS
DetailsBeverly Mountain
Application received  9/8/2014 DONE
Application submitted via PDS Online on Sep 8 2014 11:52AM