Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-02684
StatusIssued
Name ARTISAN CONSTRUCTION & REMODEL INC
Site Address 1513 N 8TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit is for the new construction of a 63 sq. ft. restroom at the ground level to include a new sink, tub and toilet, also this permit includes the removal of non-load bearing walls at the second level to open up the floor plan removing one bedroom to make a single large master bedroom in the second floor, work to include a new larger closet and adding a new window in the restroom shower area, all work to be per the approved plans and current local codes. An electrical, plumbing and mechanical permit is required. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20157/16/20157/16/2015PNR
DetailsTony Young
Call ahead // Cyrus Phone #: ###-####,, need electrical passed
BLD-Final7/14/20157/15/20157/15/2015ANR
DetailsTony Young
Call ahead // Cyrus Phone #: ###-####,, still waiting on electrical to final
BLD-Final7/13/20157/14/20157/14/2015APEND
DetailsTony Young
Call ahead // Cyrus Phone #: ###-####
BLD-Final7/13/20157/13/20157/13/2015PPEND
DetailsTony Young
Call ahead // Cyrus Phone #: ###-####
BLD-Final7/10/20157/13/20157/13/2015APEND
DetailsTony Young
Call ahead // Cyrus Phone #: ###-####,, need elec final
BLD-Final7/10/20157/10/20157/10/2015PPART
DetailsTony Young
Call ahead // Cyrus Phone #: ###-####,, ok pending electrical final
BLD-Conference3/2/20153/2/20153/2/2015PPEND
DetailsTony Young
Cyrus// please call before Phone #: ###-####,, asked the conractor to go see plan review,, no plans on site
BLD-Final2/19/20152/19/20152/19/2015PNR
DetailsTony Young
Cyrus Phone #: ###-####,, need trades
BLD-Framing/Rough-in10/28/201410/29/201410/29/2014APASS
DetailsDave Hannah
Cyrus Phone #: ###-####
BLD-Conference10/6/201410/6/201410/6/2014PPASS
DetailsTony Young
Cyrus Phone #: ###-####.. roof ?s
BLD-Conference9/17/20149/18/20149/18/2014ADONE
DetailsDave Hannah
Cyrus Phone #: ###-####
Application received 9/9/20149/9/2014 DONE
Routing Walk-In (BLD)9/9/20149/9/20149/9/2014APASS
DetailsJavier Guzman
1st review completed  9/9/2014 DONE
DetailsJavier Guzman
Inspection Record Card- Bld  9/9/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  9/9/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/9/2014 DONE
Permit Ready to Issue  9/9/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  9/9/2014 DONE
DetailsTisha Gallop