Print Statement | | | 9/18/2015 | | DONE |
|
|
|
|
Print Statement | | | 6/18/2015 | | DONE |
|
|
|
|
First Notice | | 5/14/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
Permanent Occupancy | | | 5/4/2015 | | DONE |
|
|
|
|
BLD-Final | 4/29/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Ok for temp occ. Needs to complete the wall infill for far east unit that they are vacating.
|
FIRE-Final Inspection | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | PART |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Final | 3/17/2015 | 3/18/2015 | 3/18/2015 | P | NR |
Mike Jordan
|
|
|
John Phone #: ###-####. Need a partial final from elec.
|
FIRE-Final Inspection | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PART |
Troy Cobbley
|
|
|
East most phase of project life safety is passed. New emergency light installed as well as ceiling tile and fire extinguisher. Waiting on single action hardware for exterior exit doors
|
FIRE-Final Inspection | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | FAIL |
Troy Cobbley
|
|
|
Replace ceiling tile, provide fire extinguisher, provide emergency lighting
|
BLD-Framing/Rough-in | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior steel stud framed walls at phase 3 tech rm #120.
|
CHANGE STATUS TO (ISS) | | | 2/25/2015 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 2/11/2015 | 2/11/2015 | 2/11/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 2/11/2015 | | 2/11/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/11/2015 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE
No new paperwork needed, new Cert of value was uploaded with plan mod
|
Plan Modification Accepted | | | 2/9/2015 | | DONE |
Christina Prado
|
|
|
Dawna Jenkins with Larson Architects requested a plan mod workflow be started
|
BLD-Framing/Rough-in | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. ok to occupy phase 2. Need resubmital for addotional walls built and relocation of coffee bar.
|
FIRE-Final Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | PART |
Troy Cobbley
|
|
|
Life safety passed for the area between column lines 1 and 3. I noted the west most front exit door hardware has not been addressed and a new full height wall is being built that may obstruct sprinkler heads in the warehouse area.
|
FIRE-Conference | 1/20/2015 | 1/21/2015 | 1/21/2015 | A | DONE |
Troy Cobbley
|
|
|
Went over life safety requirements for the final phase of the project.
|
BLD-Framing/Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior steel stud framed walls ok. All framing issues were resolved. phase 2 work.
|
BLD-Framing/Rough-in | 1/7/2015 | 1/7/2015 | 1/7/2015 | P | FAIL |
Mike Jordan
|
|
|
John Phone #: ###-####. Remove all screws from fromtop tracks to grid. Install braces to structure above at 8ft. oc per approved plans. Electrical rough in inspection? Correction notice posted.
|
BLD-Final | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Ok to occupy phase 1.
|
FIRE-Final Inspection | 12/10/2014 | 12/10/2014 | 12/10/2014 | P | PART |
Troy Cobbley
|
|
|
Life safety for phase 1 is passed.
|
BLD-Conference | 12/4/2014 | 12/5/2014 | 12/5/2014 | P | DONE |
Mike Jordan
|
|
|
call 15 before// John Phone #: ###-####
|
FIRE-Final Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | FAIL |
Troy Cobbley
|
|
|
See approved plan sheet for list of items needed before occupancy of phase one and items needed before final sign off of permit. Items include installation of exit signs and emergency lighting, verification of racking permit, removal of dead bolts and verfication of annual sprinkler system inspection
|
FIRE-Alarm Testing | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in
|
Issue PAID IN FULL permit | | | 10/8/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 10/8/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (AJS) | 9/12/2014 | 9/12/2014 | 9/26/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
9/25 Boise office equipment
|
Routing - PLAN CHECK | 9/12/2014 | | 9/26/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
9/25Boise office equipment
|
1st review completed | | | 9/26/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2014 | | DONE |
|
|
|
|
Routing - FIRE | 9/12/2014 | 9/12/2014 | 9/22/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-22-14
|
Routing - Addressing | 9/12/2014 | | 9/15/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/12/2014 | | 9/15/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 9/12/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 9/9/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 9 2014 11:44AM
|