Permit Information
Permit NumberBLD14-02689
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 330 N ANCESTOR PL Unit: 100
Project NameBoise Office Equipment
Customer Number 
ePlanReviewYes
Description
(BOISE OFFICE EQUIPMENT)2-11-15 PLAN MODIFICATION- add 2 interior partition walls to create coffe bar area in space previously shown as sales cubea area. --Remodel to existing spaces,6,881 sq ft office and 5,429 warehouse into existing adjoining tenant space for a new overall tenant space of 28,358 sq ft-16,052 sq ft office space and 12,306 sq warehouse space. The adjoin space is the old CSD space that lies between their two current spaces. Scope of work to include minor demolition per approved plans, new ADA door hardware and new ADA drinking fountain new nonbearing walls per approved plans and wall schedule on plans. There is a small training room existing on the 2nd floor, there is no proposed change in use, this is not an assembly area. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/18/2015 DONE
Print Statement  6/18/2015 DONE
First Notice 5/14/20156/10/2015 DONE
Mailed out 6-10-15
Permanent Occupancy  5/4/2015 DONE
BLD-Final4/29/20155/1/20155/1/2015PPASS
DetailsMike Jordan
John Phone #: ###-####. Ok for perm occ.
BLD-Final4/13/20154/14/20154/14/2015APART
DetailsMike Jordan
John Phone #: ###-####. Ok for temp occ. Needs to complete the wall infill for far east unit that they are vacating.
FIRE-Final Inspection4/13/20154/13/20154/13/2015PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in3/19/20153/20/20153/20/2015APART
DetailsJim Storey
John Phone #: ###-####
BLD-Final3/17/20153/18/20153/18/2015PNR
DetailsMike Jordan
John Phone #: ###-####. Need a partial final from elec.
FIRE-Final Inspection3/17/20153/18/20153/18/2015APART
DetailsTroy Cobbley
East most phase of project life safety is passed. New emergency light installed as well as ceiling tile and fire extinguisher. Waiting on single action hardware for exterior exit doors
FIRE-Final Inspection3/16/20153/16/20153/16/2015PFAIL
DetailsTroy Cobbley
Replace ceiling tile, provide fire extinguisher, provide emergency lighting
BLD-Framing/Rough-in2/25/20152/26/20152/26/2015APASS
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud framed walls at phase 3 tech rm #120.
CHANGE STATUS TO (ISS)  2/25/2015 DONE
Plan assigned to (AJS)2/11/20152/11/20152/11/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK2/11/2015 2/11/2015 PASS
DetailsAdele J Schaffeld-Griffin
plan modification
PLANS/APPL TAKEN TO FRONT DESK  2/11/2015 DONE
Permit Ready to Issue  2/11/2015 DONE
DetailsChristina Prado
DO NOT RE-ISSUE
No new paperwork needed, new Cert of value was uploaded with plan mod
Plan Modification Accepted  2/9/2015 DONE
DetailsChristina Prado
Dawna Jenkins with Larson Architects requested a plan mod workflow be started
BLD-Framing/Rough-in2/5/20152/6/20152/6/2015APART
DetailsMike Jordan
John Phone #: ###-####. ok to occupy phase 2. Need resubmital for addotional walls built and relocation of coffee bar.
FIRE-Final Inspection2/4/20152/4/20152/4/2015PPART
DetailsTroy Cobbley
Life safety passed for the area between column lines 1 and 3. I noted the west most front exit door hardware has not been addressed and a new full height wall is being built that may obstruct sprinkler heads in the warehouse area.
FIRE-Conference1/20/20151/21/20151/21/2015ADONE
DetailsTroy Cobbley
Went over life safety requirements for the final phase of the project.
BLD-Framing/Rough-in1/14/20151/15/20151/15/2015APASS
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud framed walls ok. All framing issues were resolved. phase 2 work.
BLD-Framing/Rough-in1/7/20151/7/20151/7/2015PFAIL
DetailsMike Jordan
John Phone #: ###-####. Remove all screws from fromtop tracks to grid. Install braces to structure above at 8ft. oc per approved plans. Electrical rough in inspection? Correction notice posted.
BLD-Final12/10/201412/11/201412/11/2014APART
DetailsMike Jordan
John Phone #: ###-####. Ok to occupy phase 1.
FIRE-Final Inspection12/10/201412/10/201412/10/2014PPART
DetailsTroy Cobbley
Life safety for phase 1 is passed.
BLD-Conference12/4/201412/5/201412/5/2014PDONE
DetailsMike Jordan
call 15 before// John Phone #: ###-####
FIRE-Final Inspection12/4/201412/4/201412/4/2014PFAIL
DetailsTroy Cobbley
See approved plan sheet for list of items needed before occupancy of phase one and items needed before final sign off of permit. Items include installation of exit signs and emergency lighting, verification of racking permit, removal of dead bolts and verfication of annual sprinkler system inspection
FIRE-Alarm Testing12/4/201412/4/201412/4/2014PCANC
DetailsTroy Cobbley
Wrong inspection type called in
Issue PAID IN FULL permit  10/8/2014 DONE
DetailsChristina Prado
Print Occupancy Form  10/8/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  9/29/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (AJS)9/12/20149/12/20149/26/2014 PASS
DetailsAdele J Schaffeld-Griffin
9/25 Boise office equipment
Routing - PLAN CHECK9/12/2014 9/26/2014 PASS
DetailsAdele J Schaffeld-Griffin
9/25Boise office equipment
1st review completed  9/26/2014 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  9/26/2014 DONE
Routing - FIRE9/12/20149/12/20149/22/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 09-22-14
Routing - Addressing9/12/2014 9/15/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/12/2014 9/15/2014 PASS
DetailsBeverly Mountain
Intake Approval  9/12/2014 PASS
DetailsAdele J Schaffeld-Griffin
Application received  9/9/2014 DONE
Application submitted via PDS Online on Sep 9 2014 11:44AM