BLD-Footing | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 9/24/2014 | 9/24/2014 | 9/24/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Dave Hannah
|
|
|
Richard-as late am as possible Phone #: ###-####
|
BLD-Footing | 9/10/2014 | 9/11/2014 | 9/11/2014 | P | PART |
Dave Hannah
|
|
|
Rich- pour time 2pm Phone #: ###-#### ok to pour first 30 ft of ftg
|
PubWorks Subgrade Approval | 9/10/2014 | 9/10/2014 | 9/10/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (PW Hillside) | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 9/9/2014 | | |
|
|
|
|
1st review completed | | | 9/9/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/9/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 9/9/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing Walk-In (BLD) | 9/9/2014 | | 9/9/2014 | P | DONE |
Christina Prado
|
|
|
|
Application received | | 9/9/2014 | | | |
|
|
|
|