Permit Information
Permit NumberBLD14-02735
StatusFinaled
Name INSULATED CONRETE FORMS OF IDAHO
Site Address 2430 E WARM SPRINGS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 607 sq. ft., one story single family dwelling with 1 bedrooms, 1.5 bathrooms, approximately 330 sq. ft. of covered patio/porch, 573 sq. ft. attached storage rooms and a 673 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. Note: the trellis and pool in the open patio area and the restroom in the storage area are not part of the scope of work; a permit will be required for such work. This structure is also required to provide a 30 foot defensible space from undeveloped land in accordance with BMC 7-01-69 section 4920. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
Call Jason Taylor at 384-3946 prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/17/20165/18/20165/18/2016PPASS
DetailsDave Hannah
Rob Phone #: ###-####
DOC - Permit Finaled5/18/20165/18/20165/18/2016PPASS
DetailsDave Hannah
PubWorks Occupancy Approval5/18/20165/18/20165/18/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.

BLD-Final5/11/20165/13/20165/13/2016PNR
DetailsDave Hannah
Rob Phone #: ###-####needs hillside final
BLD-Final5/2/20165/3/20165/3/2016APART
DetailsDave Hannah
Robert Phone #: ###-####ok to move in
BLD-Framing/Rough-in4/6/20164/6/20164/6/2016PPASS
DetailsDave Hannah
Robert Phone #: ###-####
BLD-Conference4/1/20164/1/20164/1/2016PDONE
DetailsPhil Shearer
Rob// please call before Phone #: ###-####
BLD-Conference3/18/20163/18/20163/18/2016PDONE
DetailsDave Hannah
Please call ahead for access - Rob Phone #: ###-####
BLD-Conference3/8/20163/9/20163/10/2016ADONE
DetailsDave Hannah
Rob Phone #: ###-####
BLD-Energy code compliance3/8/20163/8/20163/9/2016PNR
DetailsDave Hannah
BLD-Framing/Rough-in3/4/20163/8/20163/8/2016PNR
DetailsDave Hannah
Rob Phone #: ###-####
BLD-Foundation1/7/20161/11/20161/11/2016PPASS
DetailsJim Storey
Rob Phone #: ###-####
BLD-Footing12/7/201512/8/201512/8/2015PPASS
DetailsDave Hannah
Rob Phone #: ###-####
PubWorks Subgrade Approval12/7/201512/7/201512/7/2015 DONE
DetailsJason C. Taylor
**Footings Only***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing12/1/201512/4/201512/4/2015ANR
DetailsDave Hannah
Change day per Rob Phone #: ###-#### needs geo tech /hillside sign off
Issue PAID IN FULL permit  11/20/2015 DONE
(F) Reprint permit  11/20/2015 DONE
OVERRIDE  11/17/2015  
Inspection Record Card- Bld  11/17/2015 DONE
Telephone call  11/17/2015 DONE
called Mark to let him know permit is ready for pick up and fees due
Case Summary (BLD)  11/17/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/17/2015 DONE
Permit Ready to Issue  11/17/2015 DONE
**MET** as per homeowner he is not the GC so we need the GC and RP
Plan assigned to (JG)9/22/2014 11/17/2015 PASS
DetailsJavier Guzman
1st review completed, Pending Hillside, 09/30 T L2 Hillside*** exp 3/5/16
Routing PW Grading-Hillside11/12/2015 11/16/2015 PASS
DetailsJason C. Taylor
Revisions approved. JCT
Plan resubmittals received  11/12/2015 DONE
received 2 copies of sheet C1- put on Javier's desk
Routing PW Grading-Hillside11/9/2015 11/10/2015 FAIL
DetailsJason C. Taylor
Need 3rd set of grading sheets prior to approval.
Plan resubmittals received  11/5/2015 DONE
Two copies of Geotechnical Rcommendations packet. Two copies of sheet C1 Drainage and C1 Grading and Drainage. Taken to Javier. If needed Call Rob Stout ###-####
Routing - PLAN CHECK10/26/2015 10/26/2015 PASS
DetailsJavier Guzman
Plan Reviewer's activity  10/21/2015 DONE
DetailsJavier Guzman
Spoke with Robert Stout about project and emailed/phoned stating to him items needed for project, told him i will redline the items we spoke about removing the trellis from project, columns now heavey timber and eave/soffit 5/8" gyp with Hardie board.
Routing - MECHANICAL10/20/2015 10/21/2015 PASS
DetailsTroy James
Plan resubmittals received  10/19/2015 DONE
received one copy of sheet C1, G1.0, A1.0, A2.0, A2.1, A2.2, A3.0, A3.1, A4.0, A5.0, E1.0- put on Javier's desk with plans
Routing - PLAN CHECK10/2/2015 10/5/2015 FAIL
DetailsJavier Guzman
see review report
Plan Reviewer's activity  10/5/2015 DONE
DetailsJavier Guzman
House changed from a three story to a single story
Routing - FIRE10/1/20159/28/201510/2/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - MECHANICAL9/29/2015 9/30/2015 FAIL
DetailsTroy James
Need to submit a new ACCA report for the revised plans
Plan resubmittals received  9/29/2015 DONE
received Rescheck
Routing PW Grading-Hillside9/28/2015 9/28/2015 FAIL
DetailsJason C. Taylor
Need 3 revised grading plans submitted for review. Jason Taylor ###-####
Extend Review Timeline  9/25/2015 DONE
DetailsJason Blais
Second and final extension granted for a permit application under review.
Plan resubmittals received  9/24/2015 DONE
Received (3) sets of full plans; (C1, G1, A1, A2, A2.1, A2.2, A3, A4, A5, E1, S1) & Strucural Calculations
Plan Reviewer's activity  9/16/2015 DONE
DetailsJavier Guzman
Sent via email and post office a 180 day letter of experation to applicant 9/16/2015
Routing Walk-In (BLD)5/6/20155/6/20155/6/2015PPASS
DetailsPerry Paine
Urban Farm Questions printed our original plan corrections for Mark then had him talk to Javier
Routing - PLAN CHECK5/4/2015 5/6/2015 FAIL
DetailsJavier Guzman
resubmittals did not address any of the previous corrections
Routing - FIRE5/4/20155/4/20155/5/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Plan resubmittals received  5/1/2015 DONE
resubmittals received 2 sets of each sheet-A-102,site, site A-100, setback-took to JG
Extend Review Timeline  3/11/2015 DONE
DetailsJason Blais
Plan Reviewer's activity  3/4/2015 DONE
DetailsJavier Guzman
180 Day Expiration Letter sent 3-4-2015
Routing - FIRE10/22/201410/22/201410/22/2014 FAIL
DetailsScott Arellano
The nearest available fire hydrant is located 543 lineal feet east of the proposed structure driveway as measure along Warm Springs road with an additional 110 lineal feet from the driveway to the furthest exterior portion of the proposed structure. The total distance of hose lay to the furthest exterior portion of the structure will be 653 lineal feet. See Fire Review comments for options.
Plan resubmittals received  10/21/2014 DONE
DetailsTisha Gallop
received letter addressed to Scott Arellano and two copies of site plans (5pgs) on 11x17; taken to Javier.
Routing - FIRE10/7/201410/7/201410/8/2014 FAIL
DetailsScott Arellano
Fire plan review report emailed to applicant at ecowest@msn.com

Resubmittal items have not been addressed.
Routing - PUBLIC WORKS10/7/2014 10/7/2014 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside10/1/2014 10/7/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
1st review completed  10/1/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK  10/1/2014 FAIL
DetailsJavier Guzman
emailed review report to applicant
Plan resubmittals received  9/29/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked A-103, A-104, A-201, A-202, A-301, A-401, A-601 & A-100;Plans stamped and taken to Javier for review
Routing - MECHANICAL9/25/2014 9/25/2014 PASS
DetailsTroy James
Routing - Erosion and Sediment9/24/2014 9/25/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection Required Prior to Earth Disturbance
Routing - MECHANICAL  9/24/2014 FAIL
DetailsTroy James
emailed correction to osprey
Routing - FIRE9/23/2014 9/23/2014 FAIL
DetailsScott Arellano
Emailed applicant Fire Code plan review report.
Routing - PUBLIC WORKS9/22/2014 9/23/2014 PASS
DetailsJennifer Bruner
Sewer previously permitted with fees paid
Plan resubmittals received  9/22/2014 DONE
DetailsChristina Prado
Received three revised sets of plans marked SITE, C1.0 & S1.0; Plans ok to route through as corrections required to take out of Cat II Planning approval have been met
CHANGE STATUS TO (REV)  9/22/2014 DONE
DetailsChristina Prado
Resubmittals corrected need for Catagory II review by Planning. Retaining walls reduced in size
Intake Approval  9/22/2014 PASS
DetailsChristina Prado
Routing PW Grading-Hillside  9/16/2014 FAIL
DetailsJason C. Taylor
This project will require a CAT II hillside application prior to routing the building permit. Re-routed back to front counter. Jason Taylor ###-####.
Routing - FRONT DESK9/16/2014 9/16/2014 PASS
DetailsChristina Prado
Permit changed to PENDING status as CAT II is required prior to routing
CHANGE STATUS TO (PND)  9/16/2014 DONE
DetailsChristina Prado
Per Jason Taylor - Catagory 2 hillside application must be submitted and approved prior to routing of plans
Routing - Addressing9/12/2014 9/16/2014 PASS
DetailsJason C. Taylor
Route to Impact Fee Review9/12/20149/17/20149/15/2014 PASS
DetailsCindy M. Gould
Plans ACCEPTED BY PLAN TECH  9/12/2014 DONE
DetailsChristina Prado
Intake Approval  9/12/2014 FAIL
DetailsChristina Prado
After hillside review it was determined a Catagory 2 hillside app is required prior to routing
Recd Pcfee & Taken To Pln CK  9/12/2014 DONE
DetailsChristina Prado
Application received 9/12/2014   
Routing - PLANNING5/4/2015   FAIL
DetailsSue Cummings
Not enough information to complete a Planning review. Floor plan and site plan need to match. Still needs Catagory II Hillside as per Jason Taylor.
Routing - PLANNING10/7/2014   FAIL
DetailsSue Cummings
Site plan doesn't match architectual plan
Routing - PLAN CHECK9/28/2015    
DetailsJavier Guzman
Routing - PLANNING9/28/2015   PASS
DetailsSue Cummings
This is now a single story home in a different location on the site.
Routing - PLAN CHECK10/21/2015   FAIL
DetailsJavier Guzman
• need the footing/foundation calculations from the engineer
• need a shear plan signed and stamped by the engineer with all his lateral notes on plans or revised floor plan with the engineers stamp and engineers lateral notes on plans
• I will need a second set of the engineered stamped plans that you brought in the other day
• need to Pass hillside grading review with Jason Taylor his # is ###-####