Print Statement | | | 1/6/2017 | | DONE |
|
|
|
|
Second Notice | | 11/25/2016 | 12/14/2016 | | DONE |
|
|
|
Mailed 12-15
|
First Notice | | 10/28/2016 | 11/15/2016 | | DONE |
|
|
|
Mailed 11-16-16
|
BLD-Final | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
Permanent Occupancy | | | 10/18/2016 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | PART |
Dave Hannah
|
|
|
Inspection requested via web by Jim Carriveau ok for temp occ c/n posted
|
Temporary Occupancy | 10/4/2016 | 1/2/2017 | 10/4/2016 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 9/28/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Jim Page
|
|
|
Final for fire life safety cannot be completed until fire sprinkler and fire alarm permits are finaled, both FIR permits still have some work to be completed. Emergency lighting has been tested, fire extinguishers are in place with current inspection tags and door closers have been tested. After the FIR permits are finaled then life fire safety can be finaled.
|
Zoning Approval | 9/19/2016 | 9/19/2016 | 9/19/2016 | | DONE |
David Moser
|
|
|
|
FIRE-Sprinkler Rough-in | 9/13/2016 | 9/14/2016 | 9/14/2016 | A | DONE |
Jim Page
|
|
|
Request was for a life fire safety conference, fire conference complete.
|
BLD-Ceiling Grid Inspection | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Jim Storey
|
|
|
first floor Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Conference | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | PASS |
Jim Storey
|
|
|
Hi Jim, 4th floor ceiling grid, 2 hard lids 1st floor, after 10 if you can Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Conference | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | CANC |
Jim Storey
|
|
|
Hi Jim, looking at hard lid first floor and a couple hand rail questions Phone #: ###-#### Inspection requested via web by Jim Carriveau 1 st floor a3 ceilling ok
|
BLD-Ceiling Grid Inspection | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Jim Storey
|
|
|
2nd ; 3rd floor ceiling grid Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Conference | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Jim Storey
|
|
|
1st floor bathroom cover, i have a meeting from 9:30 to 10:30 for a heads up Phone #: ###-#### Inspection requested via web by Jim Carriveau4th ok 1st ok
|
BLD-Wall cover | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Jim Storey
|
|
|
bathroom ceilings 2 ;3, north stair tower cover, 1st floor cover Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Wall cover | 4/14/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Jim Storey
|
|
|
3rd flr exterior insulation cover Phone #: ###-#### Inspection requested via web by Jim Carriveau ok to cover all
|
BLD-Wall cover | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Jim Storey
|
|
|
edge of slab assembly 3rd ; 4th floors Inspection requested via web by Jim Carriveau engery code for exterior on 2nd ok to cover.
|
BLD-Wall cover | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PASS |
Jim Storey
|
|
|
edge of slab assembly for cover, 2nd floor Phone #: ###-#### Inspection requested via web by Jim Carriveau2nd ok 3rd southwest and east ok
|
BLD-Framing/Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | PART |
Jim Storey
|
|
|
Jim my insulator is gun shy with mineral wool install, he would like us to take a look to ensure proper install. I guess he had troubles at city center Inspection requested via web by Jim Carriveau ok to proceed
|
BLD-Framing/Rough-in | 3/21/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Jim Storey
|
|
|
exterior sofitt framing for cover Inspection requested via web by Jim Carriveau stair encloser ok/ soffits ok to cover
|
BLD-Wall cover | 3/17/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Jim Carriveau fire chalking at shafts ok
|
BLD-Wall cover | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Storey
|
|
|
Jim, any chance you can catch me right after lunch Inspection requested via web by Jim Carriveau 2nd and third core non rated walls ok to cover.
|
BLD-Wall cover | 2/2/2016 | 2/2/2016 | 2/2/2016 | A | PART |
Jim Storey
|
|
|
Jim, i have a meeting on site from 10 to 10:30 this morning so either side of that would be great if you can Phone #: ###-#### Inspection requested via web by Jim Carriveaushaft core board ok thru out building/ fire stopping pending
|
BLD-Energy code compliance | 1/18/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jim Carriveau sw mech. rm 1st and 2nd ok to cover.
|
BLD-Framing/Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### top of shatfs ok to proceed/ ele boxes back to back two locations/ ele splice box 1 hr ele rm/fireriser rm remove or prorect.
|
BLD-Framing/Rough-in | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### col grout ok exteriot wall framing ok to cover exterior.
|
BLD-Framing/Rough-in | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### grout under col ok to cover.
|
BLD-Framing/Rough-in | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### first floor exterior north ok
|
BLD-Conference | 9/28/2015 | 9/28/2015 | 9/28/2015 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### reviewed fire assemblies curtin wall shaft and stair enclosers
|
BLD-Footing | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Jim Storey
|
|
|
Jim-pour time Phone #: ###-#### placed with si pending reports
|
CHANGE STATUS TO (ISS) | | | 5/27/2015 | | DONE |
|
|
|
|
BLD-Footing | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PASS |
Jim Storey
|
|
|
pour time 9:30AM; Jim Phone #: ###-#### si w/mti
|
OVERRIDE | | | 4/3/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 4/3/2015 | | DONE |
Christina Prado
|
|
|
Plan mod ready
Need fees paid and status changed to ISS
|
Plan assigned to (AJS) | 3/10/2015 | 3/10/2015 | 3/30/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
BSU
|
Routing - PLAN CHECK | 3/30/2015 | | 3/30/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan modification
|
Routing Off Site - STRUCTURAL | 3/30/2015 | | 3/30/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2015 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/10/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/27/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/27/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/27/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 2/25/2015 | | |
|
|
|
|
Telephone call | | | 2/25/2015 | | DONE |
|
|
|
emailed Margie Kennedy and told her permit is ready for pick up and remaing fees due
|
Permit Ready to Issue | | | 2/25/2015 | | DONE |
|
|
|
Requirements met- FEES DUE
|
Expiration Notice | 2/23/2015 | 3/16/2015 | 2/23/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 12/8/2014 | | 12/20/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 12/8/2014 | | 12/20/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2014 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 9/19/2014 | | 12/20/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed New Building BSU Alumni and Friends Center
|
Routing PW Drainage | 11/19/2014 | | 12/5/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 11/19/2014 | | 12/3/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing Off Site - STRUCTURAL | 11/19/2014 | | 11/26/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
Route to Impact Fee Review | 10/24/2014 | 10/27/2014 | 11/18/2014 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 10/24/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 9/19/2014 | | 10/24/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
code review not complete spoke with Alexis at LCA. They would like to upload the revisions on the other failed reviews. They know the code review will continue but this will allow the project to advance as it was not separated into a structural submittal and a TI submital.
|
Routing - Addressing | 10/23/2014 | | 10/23/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PLANNING Land Div | 10/23/2014 | | 10/23/2014 | | PASS |
Dave Abo
|
|
|
Parcel is consolidated into one parcel under ROS 9932.
|
Routing PW Solid Waste | 9/19/2014 | | 10/7/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 9/19/2014 | | 10/7/2014 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 9/19/2014 | | 10/3/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please provide written responses, additional calculations and revised drawings where required.
|
Routing PW Drainage | 9/19/2014 | | 9/30/2014 | | FAIL |
Brian Murphy
|
|
|
NEEDS GROUND WATER LETTER AND C33 SAND FOR PAVERS
|
Routing - FIRE | 9/19/2014 | | 9/30/2014 | | PASS |
Craig D. Hanson
|
|
|
Approved with redlines See Fire Plan Review 09-30-14
|
Routing PW Sewer Design | 9/19/2014 | | 9/25/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Submit new sewer main alignment separately to public works for review. Include plan & profile, current standard notes, etc.
Remove abanoned pipe below building footprint or fill with a high slump concrete.
Avoid direct tapping large diamter sewer lines. Connect to existing manhole 91A with a cleanout/direction change @ the property line. Service must be perpendicular to the main line within Public R/W.
Contact Public Works 48 hours prior to tapping manhole to obtain a tap permit and schedule a sewer inspection.
Label Manhole - 91A
|
Routing - PLANNING | 9/19/2014 | | 9/23/2014 | | PASS |
David Moser
|
|
|
|
Routing - PLUMBING | 9/22/2014 | | 9/22/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Sewer Rating | 9/19/2014 | | 9/19/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Street Lights | 9/19/2014 | | 9/19/2014 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing - PLANNING Land Div | 9/19/2014 | | 9/19/2014 | | FAIL |
Dave Abo
|
|
|
Must remove property lines where new structure is proposed.
Different property owners, Boise State Alumni and Boise State University. Also southern portion owned by State Board of Education.
|
Routing - Addressing | 9/19/2014 | | 9/19/2014 | | FAIL |
Emily Dixon
|
|
|
The proposed building would be on multiple parcels with different owners.
|
Routing - PUBLIC WORKS | 9/19/2014 | | 9/19/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 9/19/2014 | | 9/19/2014 | | PASS |
Evan Jenkins
|
|
|
RP must be designated prior to issuence of permit.
Site Prep Inspection and Approval Required Prior to Earth Disturbance.
|
Intake Approval | | | 9/18/2014 | | PASS |
Tim L. Woodard
|
|
|
Intake approved with separate application for "Cart Storage" building. TLW
|
Application received | | | 9/15/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 15 2014 8:35AM
|
Pending Assignment by JCM | 9/19/2014 | | | | |
John Menard
|
|
|
|
Routing PW Geothermal | 10/24/2014 | | | | PASS |
Jon R. Gunnerson
|
|
|
Boise City to provide geothermal taps and pipe to right-of-way. Coordinate with City Public Works Department @ ###-####
signed off in e plan
|