Permit NumberBLD14-02817
StatusFinaled
Name FULTON STREET LLC
Site Address 705 W FULTON ST
Project NameGrind Modern Burger
Customer Number 
ePlanReviewYes
Description
(GRIND) The scope of this permit is for minor alteration to an existing restaurant and brewing tenant as shown on approved plans. See copy of letter for upgrade agreement. Scope of work to include new layout of interior seating, removing portion of exterior wall existing under existing roofing system. The will add 568 sq ft to the existing 4,807 dining room for a total of 5,375 sq ft for the dining room. The new exterior wall shall meet energy code requirements .A new air curtain will be installed in place of a vestibule at the main entry door, see alternate from Building Official. New roll up door and new exit door will be installed as per approved plans. See BLD05-01107 for existing floor plan addressing the exiting from spaces not associated with this tenant space in this building. Interior finish material shall meet the requirements of chapter 8, IBC. As part of this permit the restaurant will have the fire sprinkler system extended into this tenant space to make the building fully fire sprinklered, see letter from Fire Marshal and Building Official. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/27/2015 DONE
First Notice 6/13/20158/10/2015 DONE
Mailed 8/11
Telephone call  7/14/2015 DONE
Left a message for Justin to see if he had an address for Theodore Kielley so that we can send a first notice
Telephone call  7/9/2015 DONE
Called Rick at ###-####. Also looked at the permit in ePlan and called the number that was in there for CDI Contractor at ###-#### to get an address so that a notice could be sent to them. Dusty, who was put down for the contact on the final inspection, didn't know what project or company I was talking about.
Agreement of Future work10/6/20143/31/20156/5/2015 DONE
DetailsJason Blais
Upgrade Agreement attached to this case. Work is to be completed by 3/31/15.

6/5/15 Work is completed. Sprinklers installed under FIR15-00068. Air curtain also installed under this building permit.
Permanent Occupancy  6/3/2015 DONE
BLD-Final5/29/20156/1/20156/1/2015PPASS
DetailsDave Hannah
Dusty Phone #: ###-####
BLD-Final5/28/20155/29/20155/29/2015PDEFR
DetailsJim Storey
Dusty Phone #: ###-#### to monday pending mis permit insp. by mech.
FIRE-Final Inspection5/28/20155/29/20155/29/2015APASS
DetailsJim Page
Life safety passed, Suite Letter needs to be changed to Suite 102 number prior to final building inspection.
Telephone call  5/28/2015 DONE
called to remind Rick that his C 0f O expires on 5/31/15-LMM
Telephone call  5/26/2015 DONE
called Rick to see if he was ready for his perm occ inspection-left message on his phone
Temporary Occupancy4/22/20157/21/20154/22/2015 DONE
DetailsCandy A. Nichols
Telephone call  4/20/2015 DONE
called Rick to see if they were ready for perm CO-he said they're still waiting for parts and will send an email to J.B. requesting another extension
FIRE-Conference3/20/20153/20/20153/31/2015PDONE
DetailsForrest France
Project related fire sprinkler permit work finaled. Need to repair door closure at the brewery room west side. Informed tenant to provide a permanent power source to attic fans above the kitchen coolers- extension cords not allowed.
Temporary Occupancy3/20/20156/18/20153/20/2015 DONE
DetailsCandy A. Nichols
BLD-Aging Inspection2/2/20152/2/20152/3/2015 PEND
DetailsDave Hannah
Temporary Occupancy12/22/20143/22/201512/22/2014 DONE
DetailsKristal Soland
BLD-Aging Inspection12/1/201412/1/201412/9/2014 PEND
DetailsDave Hannah
Plan Reviewer's activity  12/8/2014 DONE
DetailsAdele J Schaffeld-Griffin
email sent ot Romeo Gervais, Tim Frost, Tom Gainor, Scott Arellano, Jason Blais

FYI


I just got off the phone with Rick form Modern Grind. They met with Phoenix Fire last Wednesday 12/3 to go over some final documents and he stated they ran into some delays getting signatures from the owner.

He said he will let me know by the end of the day when Phoenix plans to submit.



BLD-Final10/1/201410/2/201410/2/2014PPART
DetailsDave Hannah
Rick Phone #: ###-#### ok for temp occ
FIRE-Final Inspection10/1/201410/2/201410/2/2014APART
DetailsForrest France
Approved for temporary occupancy per conditions of the upgrade agreement on file. Need to post max occupancy signage at 99 near the main entry/exit per plan key note, repair one EM light at the east wall dining area.
Temporary Occupancy10/2/201412/31/201410/2/2014 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (AJS)9/22/20149/22/201410/1/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed GRIND
Routing - PLAN CHECK9/30/2014 10/1/2014 PASS
DetailsAdele J Schaffeld-Griffin
waiting on notarized letter
PLANS/APPL TAKEN TO FRONT DESK  10/1/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/1/2014 DONE
Permit Ready to Issue  10/1/2014 DONE
DetailsCandy A. Nichols
Issue PAID IN FULL permit  10/1/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  10/1/2014 DONE
DetailsCandy A. Nichols
Routing - FIRE9/30/20149/30/20149/30/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 09-30-14
Routing - PLUMBING9/30/2014 9/30/2014 PASS
DetailsBill VanDegrift
vent the existing grease trap per code.
Routing PW Environmental9/30/2014 9/30/2014 PASS
DetailsRick Christenson
Verified Grease Trap.
Routing - FIRE9/22/20149/22/20149/29/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 09-29-14
Routing Off Site - C.D.H9/22/2014 9/29/2014 PASS
DetailsAdele J Schaffeld-Griffin
approved by Frank, Note-3 compartmetn sink must be indirectly drained to floor sink.
1st review completed  9/29/2014 FAIL
Plan resubmittals received  9/29/2014 DONE
DetailsCandy A. Nichols
received notary signed letter-took to Adele
Routing - PLAN CHECK9/22/2014 9/29/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - MECHANICAL9/22/2014 9/26/2014 PASS
DetailsTroy James
no mechanical to review
Routing - Design Review9/22/2014 9/25/2014 PASS
DetailsSarah Schafer
The plans comly wtih the approved zoning certificate.
Routing PW Environmental9/23/2014 9/25/2014 FAIL
DetailsRick Christenson
Inadequate Grease Abatement. 1500 Gallon Exterior Grease Interceptor Required.
Routing PW Sewer Rating9/23/2014 9/23/2014 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS9/22/2014 9/23/2014 PASS
DetailsBeverly Mountain
Intake Approval  9/22/2014 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing9/22/2014 9/22/2014 PASS
DetailsEmily Dixon
Application received  9/19/2014 DONE
Application submitted via PDS Online on Sep 19 2014 3:11PM