Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD14-02856
StatusFinaled
Name PROFESSIONAL WOODWORKS
Site Address 1340 S ORCHARD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(SNAKE RIVER POOL & SPA - FACADE ADDITION) For the removal and addition of a facade on the West wall of the structure to include new framing and a EIFS finish system per the approved plans and the attached engineering. This is a fully sprinklered building with an alarm system. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  12/23/2015 DONE
BLD-Final12/30/201412/30/201412/30/2014PPASS
DetailsPhil Shearer
Frank Phone #: ###-####-please call prior to meet
BLD-Final12/29/201412/30/201412/30/2014ACANC
DetailsPhil Shearer
Frank Phone #: ###-####-please call prior to meet
FIRE-Final Inspection12/29/201412/29/201412/29/2014PPASS
DetailsTroy Cobbley
Life safety passed. Sprinkler protection not required for the new storefront (CMU separation with no penatration)
BLD-Final12/4/201412/4/201412/4/2014PNR
DetailsPhil Shearer
call an hour before//Frank Phone #: ###-####
BLD-Wall Bracing11/4/201411/4/201411/4/2014PPASS
DetailsPhil Shearer
Frank Phone #: ###-####
BLD-Framing/Rough-in11/3/201411/3/201411/3/2014PPASS
DetailsPhil Shearer
Frank Phone #: ###-####
Route to Impact Fee Review9/24/20149/29/201410/24/2014 PASS
DetailsCindy M. Gould
No new sq ft, no impact fees
Issue PAID IN FULL permit  10/22/2014 DONE
(F) Reprint permit  10/22/2014 DONE
OVERRIDE  10/20/2014  
Routing - PLAN CHECK10/10/2014 10/20/2014 PASS
DetailsCarl D Madsen
Plan assigned to (CDM)9/24/2014 10/20/2014 PASS
DetailsCarl D Madsen
Plan resubmittals received  10/20/2014  
Revised structural calculations provided.
Case Summary (BLD)  10/20/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/20/2014 DONE
Inspection Record Card- Bld  10/20/2014 DONE
DetailsTisha Gallop
Telephone call  10/20/2014 DONE
DetailsChristina Prado
Called Bryan to advise permit is ready pending GC and RP and gave fees due
Permit Ready to Issue  10/20/2014 DONE
DetailsChristina Prado
Routing - FIRE10/9/20149/24/201410/10/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 10-10-14
Routing - PLANNING10/10/2014 10/10/2014 PASS
DetailsAndrea Tuning
Routing - Design Review  10/10/2014 PASS
DetailsAndrea Tuning
DRH14-00328
Routing - PLAN CHECK9/25/2014 10/9/2014 FAIL
DetailsCarl D Madsen
The existing structural exterior wall is required to be evaluated for the additional loads imposed by the new parapet and facade.
1st review completed  10/9/2014 DONE
Routing - Addressing9/24/2014 9/25/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS9/25/2014 9/25/2014 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment9/25/2014 9/25/2014 PASS
DetailsEvan Jenkins
Routing - PLANNING Land Div9/24/2014 9/24/2014 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  9/24/2014 DONE
DetailsChristina Prado
Intake Approval  9/24/2014 PASS
DetailsJohn Menard
Recd Pcfee & Taken To Pln CK  9/24/2014 DONE
DetailsChristina Prado
Application received 9/24/2014   
Pending Assignment by JCM9/24/2014    
DetailsJohn Menard