Permit NumberBLD14-02875
StatusFinaled
Name CANYON CREST HOMES
Site Address 4240 N ARROW VILLA WAY
Project NameAnderson/Davis
Customer Number 
ePlanReviewYes
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 3164 sq. ft., two story (first story 2726 sq. ft., second story 438 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 332 sq. ft. of covered patio/porch and a 742 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval4/22/20154/22/20154/22/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final2/24/20152/25/20152/25/2015APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Wipper,, per plans
DOC - Permit Finaled2/25/20152/25/20152/25/2015PPASS
DetailsTony Young
c of o issued
PubWorks Occupancy Approval2/25/20152/25/20152/25/2015 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Wall Bracing12/11/201412/12/201412/15/2014PPASS
DetailsTony Young
please call prior to inspection. Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Wall Bracing12/11/201412/11/201412/11/2014PFAIL
DetailsPhil Shearer
interior drywall shear nailing. Late PM if possible Phone #: ###-#### Inspection requested via web by David Wipper. Incorrect nailing on three shear panels.
BLD-Wall cover12/11/201412/11/201412/11/2014PPASS
DetailsPhil Shearer
WUI drywall at exterior soffits. Late PM if possible Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Wall Bracing12/9/201412/9/201412/9/2014PNR
DetailsPhil Shearer
Phone #: 8507182 >> Inspection requested via mobile web by dave wipper
BLD-Energy code compliance12/4/201412/5/201412/5/2014APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Framing/Rough-in12/2/201412/3/201412/3/2014APASS
DetailsTony Young
Phone #: 8507182 >> Inspection requested via mobile web by dave wipper
BLD-Wall Bracing11/18/201411/19/201411/19/2014APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Foundation10/22/201410/23/201410/23/2014APASS
DetailsTony Young
Shawn-pour time 2:00 Phone #: ###-####
BLD-Footing10/21/201410/22/201410/23/2014PPASS
DetailsTony Young
Shawn-pour time 2:00 Phone #: ###-####
Routing PW Grading-Hillside10/22/2014 10/22/2014 PASS
DetailsJim Wyllie
Received letter from Strata conditionally approving footing subgrade if loose material is removed from footing trenches. Okay to schedule footing inspection. Verify removal of loose material from footing trenches prior to allowing concrete pour. (Jim Wyllie @ ###-####)
OVERRIDE  10/16/2014  
Issue PAID IN FULL permit  10/16/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  10/16/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  10/16/2014 DONE
DetailsChristina Prado
Plan assigned to (JG)9/29/20149/29/201410/15/2014 PASS
DetailsJavier Guzman
1st review completed, 10/15 W L2 Hillside ePlan**
Routing - PLAN CHECK10/13/2014 10/15/2014 PASS
DetailsJavier Guzman
Routing PW Grading-Hillside10/15/2014 10/15/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
PLANS/APPL TAKEN TO FRONT DESK  10/15/2014 DONE
1st review completed  10/13/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK9/29/2014 10/13/2014 FAIL
DetailsJavier Guzman
ePlan
Routing - FIRE9/29/20149/29/201410/1/2014 PASS
DetailsScott Arellano
This structure has been evaluated for Fire department vehicle access. Addionally, the exterior of this structure is required to comply with the 30 foot Defensible Space provisions of the Boise Municipal Code 7-01-69 section 4920.
Routing PW Grading-Hillside9/29/2014 9/30/2014 FAIL
DetailsJason C. Taylor
See changemark notes in ePlan. JCT
Routing - Erosion and Sediment9/29/2014 9/30/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection & Approval Required Prior to Earth Disturbance
Routing - PLANNING9/29/2014 9/30/2014 PASS
DetailsSue Cummings
Routing - MECHANICAL9/29/2014 9/30/2014 PASS
DetailsTroy James
Routing - PUBLIC WORKS9/29/2014 9/30/2014 PASS
DetailsJennifer Bruner
Routing - Addressing9/29/2014 9/29/2014 PASS
DetailsEmily Dixon
Intake Approval  9/29/2014 FAIL
DetailsChristina Prado
Need structural calcs
Recd Pcfee & Taken To Pln CK  9/29/2014 DONE
DetailsCandy A. Nichols
Intake Approval  9/29/2014 PASS
DetailsCandy A. Nichols
Application received  9/25/2014 DONE
Application submitted via PDS Online on Sep 25 2014 9:59AM