PubWorks Occupancy Approval | 4/22/2015 | 4/22/2015 | 4/22/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper,, per plans
|
DOC - Permit Finaled | 2/25/2015 | 2/25/2015 | 2/25/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 2/25/2015 | 2/25/2015 | 2/25/2015 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Wall Bracing | 12/11/2014 | 12/12/2014 | 12/15/2014 | P | PASS |
Tony Young
|
|
|
please call prior to inspection. Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Wall Bracing | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | FAIL |
Phil Shearer
|
|
|
interior drywall shear nailing. Late PM if possible Phone #: ###-#### Inspection requested via web by David Wipper. Incorrect nailing on three shear panels.
|
BLD-Wall cover | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Phil Shearer
|
|
|
WUI drywall at exterior soffits. Late PM if possible Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Wall Bracing | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | NR |
Phil Shearer
|
|
|
Phone #: 8507182 >> Inspection requested via mobile web by dave wipper
|
BLD-Energy code compliance | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Framing/Rough-in | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Tony Young
|
|
|
Phone #: 8507182 >> Inspection requested via mobile web by dave wipper
|
BLD-Wall Bracing | 11/18/2014 | 11/19/2014 | 11/19/2014 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Foundation | 10/22/2014 | 10/23/2014 | 10/23/2014 | A | PASS |
Tony Young
|
|
|
Shawn-pour time 2:00 Phone #: ###-####
|
BLD-Footing | 10/21/2014 | 10/22/2014 | 10/23/2014 | P | PASS |
Tony Young
|
|
|
Shawn-pour time 2:00 Phone #: ###-####
|
Routing PW Grading-Hillside | 10/22/2014 | | 10/22/2014 | | PASS |
Jim Wyllie
|
|
|
Received letter from Strata conditionally approving footing subgrade if loose material is removed from footing trenches. Okay to schedule footing inspection. Verify removal of loose material from footing trenches prior to allowing concrete pour. (Jim Wyllie @ ###-####)
|
OVERRIDE | | | 10/16/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/16/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/16/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JG) | 9/29/2014 | 9/29/2014 | 10/15/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 10/15 W L2 Hillside ePlan**
|
Routing - PLAN CHECK | 10/13/2014 | | 10/15/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 10/15/2014 | | 10/15/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2014 | | DONE |
|
|
|
|
1st review completed | | | 10/13/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/29/2014 | | 10/13/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 9/29/2014 | 9/29/2014 | 10/1/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire department vehicle access. Addionally, the exterior of this structure is required to comply with the 30 foot Defensible Space provisions of the Boise Municipal Code 7-01-69 section 4920.
|
Routing PW Grading-Hillside | 9/29/2014 | | 9/30/2014 | | FAIL |
Jason C. Taylor
|
|
|
See changemark notes in ePlan. JCT
|
Routing - Erosion and Sediment | 9/29/2014 | | 9/30/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection & Approval Required Prior to Earth Disturbance
|
Routing - PLANNING | 9/29/2014 | | 9/30/2014 | | PASS |
Sue Cummings
|
|
|
|
Routing - MECHANICAL | 9/29/2014 | | 9/30/2014 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 9/29/2014 | | 9/30/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/29/2014 | | 9/29/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 9/29/2014 | | FAIL |
Christina Prado
|
|
|
Need structural calcs
|
Recd Pcfee & Taken To Pln CK | | | 9/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 9/29/2014 | | PASS |
Candy A. Nichols
|
|
|
|
Application received | | | 9/25/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 25 2014 9:59AM
|