BLD-Final | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | PASS |
Tony Young
|
|
|
Larren Phone #: ###-####
|
DOC - Permit Finaled | 6/17/2015 | 6/17/2015 | 6/17/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 6/16/2015 | 6/16/2015 | 6/16/2015 | P | PASS |
Tony Young
|
|
|
Larren Phone #: ###-####,, ok pending trades
|
PubWorks Occupancy Approval | 6/16/2015 | 6/16/2015 | 6/16/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
Routing PW Grading-Hillside | 5/5/2015 | | 5/5/2015 | | PASS |
Jason C. Taylor
|
|
|
Recieved as-built drawings with additional walls in front of house. walls are less that 4' in height and separated by 5' of horizontal distance. Engineering will be required for approval of walls. Jason Taylor ###-####.
|
BLD-Wall cover | 2/27/2015 | 3/2/2015 | 3/2/2015 | A | PASS |
Tony Young
|
|
|
Laren Phone #: ###-####,, fire blocking
|
BLD-Energy code compliance | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | PEND |
Tony Young
|
|
|
Laren Phone #: ###-####
|
BLD-Energy code compliance | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PART |
Tony Young
|
|
|
Laren Phone #: ###-####,, need to fire block double wall between kitchen and living room,, ok to sheet rock other areas
|
BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PART |
Tony Young
|
|
|
Laren Phone #: ###-####,, ok to insulate,, need full sign off on fireplace prior to cover
|
BLD-Other | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PASS |
Tony Young
|
|
|
Larren-fire sofifits Phone #: ###-####
|
BLD-Other | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PART |
Tony Young
|
|
|
Larren-fire sofifits Phone #: ###-####,, work in progress,, ok
|
BLD-Wall Bracing | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Tony Young
|
|
|
Lauren; Phone #: ###-####,, exterior ok
|
BLD-Foundation | 11/26/2014 | 11/26/2014 | 12/1/2014 | P | PASS |
Tony Young
|
|
|
call before //Laren Phone #: ###-####,, piers
|
PubWorks Subgrade Approval | 11/26/2014 | 11/26/2014 | 11/26/2014 | | DONE |
Jason C. Taylor
|
|
|
* Columns/Pier Pads***A letter from the applicant’s geotechnical engineer indicating that the column pads subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 11/24/2014 | 11/24/2014 | 11/24/2014 | P | NR |
Tony Young
|
|
|
Larren-concrete pier Phone #: ###-####,, need soils
|
BLD-Foundation | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PART |
Tony Young
|
|
|
Donny Phone #: ###-####,, remainder of walls ok,,, still need rear pier ftgs
|
BLD-Foundation | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | CANC |
Phil Shearer
|
|
|
Donny Phone #: ###-####
|
BLD-Foundation | 11/4/2014 | 11/6/2014 | 11/6/2014 | A | PART |
Jim Sly
|
|
|
Donnie Phone #: ###-#### House walls only......OK.
|
BLD-Footing | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Tony Young
|
|
|
Donnie Phone #: ###-####
|
PubWorks Subgrade Approval | 11/4/2014 | 11/4/2014 | 11/4/2014 | | DONE |
Jason C. Taylor
|
|
|
*FOOTING ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/4/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 11/3/2014 | | |
|
|
|
|
Plan assigned to (JG) | 9/26/2014 | 9/29/2014 | 11/3/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 10/14 T L2 Hillside*
|
Routing - PLAN CHECK | 10/10/2014 | | 11/3/2014 | | PASS |
Javier Guzman
|
|
|
|
Telephone call | | | 11/3/2014 | | DONE |
|
|
|
called David Wali and left vm permit is ready and fee due.
|
Case Summary (BLD) | | | 11/3/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/3/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2014 | | DONE |
|
|
|
|
Routing - PLANNING | 10/30/2014 | | 10/30/2014 | | PASS |
Sue Cummings
|
|
|
Lot line was not accuately depicted on the site plan See redlines
|
Plan resubmittals received | | | 10/29/2014 | | DONE |
|
|
|
received two copies full new set of plan sheets; taken to Javier
|
Routing - PUBLIC WORKS | 10/13/2014 | | 10/13/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 10/10/2014 | | 10/10/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 10/3/2014 | | 10/10/2014 | | FAIL |
Javier Guzman
|
|
|
emailed applicant review report
|
1st review completed | | | 10/10/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 10/9/2014 | | 10/9/2014 | | FAIL |
Jason C. Taylor
|
|
|
Geotechical reports are not included in application packet. Called applicant and left message to have him drop off 3 copies of geo report. Jason Talyor ###-####.
|
Routing - FIRE | 10/2/2014 | | 10/3/2014 | | PASS |
Scott Arellano
|
|
|
Fire sprinkler are required.
|
Routing - Erosion and Sediment | 10/1/2014 | | 10/2/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection & Approval Required Prior to Earth Disturbance
|
Routing - PUBLIC WORKS | 9/30/2014 | | 10/1/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 10/1/2014 | | 10/1/2014 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 9/29/2014 | | 9/30/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/26/2014 | | DONE |
|
|
|
|
Intake Approval | | | 9/26/2014 | | PASS |
|
|
|
|
Application received | | 9/26/2014 | | | |
|
|
|
|
Routing - PLANNING | 10/1/2014 | | | | FAIL |
Sue Cummings
|
|
|
Does not meet the setbacks - called applicant - left message
|
Routing - PLANNING | 10/13/2014 | | | | FAIL |
Sue Cummings
|
|
|
20 ft. front (street) 30 ft. rear (opposite of street) plus WUI setback of 30 ft. round the house
|