Permit Information
Permit NumberBLD14-02889
StatusTemporary Occupancy
Name CSDI CONSTRUCTION INC
Site Address 119 S 10TH ST
Project Name10th and Grove Condos
Customer NumberBLD14-02156
ePlanReviewYes
Description
(119 Grove): Plan modifications to change the arrangement only of the exit our of the 2 hour stair enclosure. 12/17/18 ajs--Permit to construct 4 floors Type V One Hour construction over 3 hour horizontal separation of the Type 1A 2 story parking garage per City of Boise Type V ordinance. This portion of the building consists of 26 units of condominium spaces on top of a two story concrete parking podium with 3 hour separation. The podium plans are currently under review as BLD14-02156. This building is required to be fire sprinklered. Separate Fire Alarm and Fire Sprinker permits will be required; as regulated by the Fire Department.**ajs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/26/20206/26/20206/30/2020 PEND
DetailsDave Hannah
Telephone call  5/27/2020 DONE
emailed Robert at CSDI to let him know this permit has expired and that he must either final it or request an extension from Jason Blais.
Telephone call  4/23/2020 DONE
emailed Robert to let him know this TCO will expire soon. Asked him to schedule a final inspection or request an extension from Jason Blais.
Telephone call  4/10/2020 DONE
emailed Robert Feldmann at CSDI: rfeldmann@csdiconstruction.com - to let him know that his TCO will expire 5/4/2020 and to request an extension from Jason Blais.
BLD-Aging Inspection3/9/20203/9/20203/12/2020 PEND
DetailsDave Hannah
Change Expiration Date Only  1/15/2020 DONE
Per Jason Blais - permit extended 90 days from 2/4/20. See DOCS
Telephone call  1/14/2020 DONE
Called and spoke with Robert. Sawtooth & CSHQA still in litigation about ADA requirements. Emailed Robert with directions on how to request an extension.
BLD-Aging Inspection11/11/201911/11/201911/14/2019 PEND
DetailsDave Hannah
Temporary Occupancy11/1/20191/30/202011/1/2019 DONE
DetailsGemma Flores
TCO extended 90 days from 11/6/2019 per Jason Blais. See DOCs. Request from extension from Jim Marsh of CSHQA. James.marsh@cshqa.com
Telephone call  10/25/2019 DONE
Called and spoke with Robert Feldman. He said that the contractor and the owner are going to court. Court date is 11/6. He said he will pass on to Sawtooth that the permit will expire on the 6th and that they need to request another extension.
rfeldmann@csdiconstruction.com
BLD-Aging Inspection8/12/20198/12/20198/19/2019 DONE
DetailsDave Hannah
Temporary Occupancy8/19/201911/17/20198/19/2019 DONE
DetailsCandy A. Nichols
Jason Blais ok'd extension of temp c of o for 90 days from 8/8/19
Telephone call  8/13/2019 DONE
Called Robert Feldman as a reminder again that the temp C of O expired 8-8-19-he will contact Sawtooth Dev and have them email Jason Blais again
Telephone call  8/5/2019 DONE
called Robert Feldman ###-#### to let know the temp c of o is about to expire-left message on his answering machine
BLD-Aging Inspection6/10/20196/10/20196/13/2019 PEND
DetailsDave Hannah
Temporary Occupancy5/7/20198/5/20195/7/2019 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 90 day extension starting from 5/10/19
BLD-Aging Inspection3/29/20193/29/20194/4/2019 PEND
DetailsDave Hannah
Temporary Occupancy2/5/20195/6/20192/5/2019 DONE
DetailsCandy A. Nichols
as per Jason Blais-ext req ok good thru +90 days from 2-9-19
BLD-Aging Inspection1/9/20191/9/20191/9/2019 PEND
DetailsDave Hannah
Temporary Occupancy11/14/20182/12/201911/14/2018 DONE
DetailsCandy A. Nichols
as per Jason Blais ok for 90 day ext on temp c of o
BLD-Aging Inspection10/29/201810/29/201811/2/2018 PEND
DetailsDave Hannah
Temporary Occupancy8/24/201811/22/20188/24/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd the extension for 90 days from 8-13-18
Telephone call  8/23/2018 DONE
called to remind Robert Feldman that the temp c of o is expired and he needs to request an extension or call in finals-left message on his office phone
Telephone call  8/13/2018 DONE
called Robert Feldman again to let know that the temp c of o expires today
Telephone call  8/7/2018 DONE
called Robert to let know temp c of o will expire on 8-13-18-left message on his phone
BLD-Aging Inspection7/13/20187/13/20187/18/2018 PEND
DetailsDave Hannah
Temporary Occupancy5/25/20188/23/20185/25/2018 DONE
DetailsCandy A. Nichols
per Jason B-ok to extend temp c of o for 90 days starting from 5/15/18
Telephone call  5/22/2018 DONE
called again-Robert Feldman-who was out again so talked to Jack L. He will either call the final in if ready or request an extension - emailed him as well
Telephone call  5/18/2018 DONE
called Robert Warner (?) he said i needed Robert Feldman-transfrerred me to him and i had to leave a message on his voice mail asking him to request and extension on the temp c of o or call in his finals
Telephone call  5/15/2018 DONE
called Robert to let know temp c of o expires today-left message on his phone
BLD-Aging Inspection4/23/20184/23/20185/1/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection2/19/20182/19/20182/20/2018 PEND
DetailsDave Hannah
Temporary Occupancy2/8/20185/9/20182/8/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd extension good thru May 15th 2018
BLD-Aging Inspection12/18/201712/18/201712/19/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection10/16/201710/16/201710/16/2017 PEND
DetailsDave Hannah
Temporary Occupancy10/6/20171/4/201810/6/2017 DONE
DetailsCandy A. Nichols
Jason Blais approved ext for 90 days starting from 11/16/17
BLD-Aging Inspection8/16/20178/16/20178/23/2017 PEND
DetailsDave Hannah
Temporary Occupancy8/18/201711/16/20178/18/2017 DONE
DetailsCandy A. Nichols
Jason Blais ok'd extension of the temp c of o for 90 days
Telephone call  8/15/2017 DONE
called to let Robert know the temp c of o will expire in 3 days-he's well aware of it
BLD-Aging Inspection6/16/20176/16/20176/20/2017 PEND
DetailsDave Hannah
Temporary Occupancy5/17/20178/15/20175/17/2017 DONE
DetailsCandy A. Nichols
as per Jason Blais-ok to estend temp c of o-90 days from 5/20/17
BLD-Aging Inspection3/28/20173/28/20173/28/2017 PEND
DetailsDave Hannah
Telephone call  2/10/2017 DONE
called as a reminder that the temp c of o is about to expire (2/19/2017)-Jack will request and extension
Temporary Occupancy2/9/20175/10/20172/9/2017 DONE
DetailsCandy A. Nichols
Jason Blais approved a 90 day temp c of o extension good thru May 20 2017
BLD-Aging Inspection1/26/20171/26/20171/27/2017 PEND
DetailsDave Hannah
BLD-Final11/15/201611/15/201611/21/2016PPEND
DetailsDave Hannah
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
Temporary Occupancy11/21/20162/19/201711/21/2016 DONE
DetailsBrittany Hill
BLD-Final11/17/201611/18/201611/19/2016PPEND
DetailsDave Hannah
Building final Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok for temp occ but needs to fix ada issues
BLD-Final11/16/201611/16/201611/16/2016ANR
DetailsDave Hannah
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
FIRE-Final Inspection11/14/201611/14/201611/15/2016PPASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place, addressing will be installed when recieved as well as stairwell signage (verified install payment be contractor invoice, signs will be installed when recieved) Final life fire safety inspection passed/complete.
BLD-Final11/8/201611/10/201611/9/2016ACANC
DetailsDave Hannah
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
FIRE-Final Inspection11/8/201611/9/201611/9/2016ACANC
DetailsTroy Cobbley
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
Zoning Approval11/8/201611/8/201611/8/2016 PASS
DetailsJosh Wilson
BLD-Final10/28/201610/31/201611/1/2016PNR
DetailsDave Hannah
Final after Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Michael Zaccheo
FIRE-Final Inspection10/28/201610/31/201610/31/2016ACANC
DetailsKatie Marron
No inspection completed. Waiting to do in conjunction with Fire Alarm Final.
BLD-Final10/28/201610/28/201610/28/2016PCANC
DetailsDave Hannah
Final after Fire/Life/Safety inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Conference10/19/201610/19/201610/19/2016APASS
DetailsDave Hannah
Handrail compliance. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection10/4/201610/4/201610/4/2016PPASS
DetailsDave Hannah
6th floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection9/27/20169/28/20169/28/2016APASS
DetailsDave Hannah
Fifth floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection9/20/20169/21/20169/21/2016APASS
DetailsDave Hannah
Ceiling grid inspection 4th floor corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover9/7/20169/7/20169/8/2016PPASS
DetailsDave Hannah
Hole patches to enclose utility shaft levels 3 thru 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection8/31/20169/1/20169/1/2016PPASS
DetailsDave Hannah
Ceiling grid level 3 corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover8/31/20169/1/20169/1/2016PPASS
DetailsDave Hannah
Shaft wall trash/recycle and closure of utility shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover8/23/20168/23/20168/24/2016PPASS
DetailsDave Hannah
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover8/24/20168/24/20168/24/2016APASS
DetailsDave Hannah
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in8/16/20168/16/20168/16/2016PPASS
DetailsMike Jordan
Lobby framing inspection Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in8/5/20168/5/20168/5/2016PPASS
DetailsDave Hannah
Framing hard lids ; fire caulking above hard lids in corridors 5 ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in7/30/20168/1/20168/5/2016PPASS
DetailsDave Hannah
Drop soffit framing 3rd and 4th floor corridors. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference7/25/20167/27/20167/27/2016ADONE
DetailsDave Hannah
Meeting with 119 owners group concerning A.D.A. compliance in unit 301. Owners will be on site between 9 a.m. and noon. If you can schedule your visit between those hours it would be appreciated. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection7/21/20167/22/20167/22/2016APASS
DetailsDave Hannah
Re- inspection drop ceiling 604 and inspection drop ceiling 605 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference7/21/20167/21/20167/21/2016PCANC
DetailsDave Hannah
Re-inspection of unit 604 drop ceiling. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Ceiling Grid Inspection7/20/20167/21/20167/21/2016APART
DetailsDave Hannah
Drop ceiling inspection units 602, 604, ; 605. Phone #: ###-#### Inspection requested via web by Michael Zaccheo 602 ok
BLD-Ceiling Grid Inspection7/14/20167/15/20167/15/2016APASS
DetailsJim Storey
Drop ceiling inspection unit 603. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection7/12/20167/12/20167/12/2016PPASS
DetailsDave Hannah
Unit 601 drop ceiling framing and fire caulking. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover7/1/20167/1/20167/1/2016APASS
DetailsDave Hannah
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover6/30/20166/30/20167/1/2016PCANC
DetailsDave Hannah
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/27/20166/28/20166/29/2016PPASS
DetailsDave Hannah
Drop ceiling framing and fire caulking units 505 thru 507. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference6/24/20166/24/20166/24/2016PPASS
DetailsMike Jordan
Fire drywall at exterior west wall at gussets. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/21/20166/22/20166/23/2016PPASS
DetailsDave Hannah
Drop ceiling framing and fire caulking units 501 thru 504. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/14/20166/15/20166/15/2016APASS
DetailsDave Hannah
Hard lid and fire caulking units 406 ; 407. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Ceiling Grid Inspection6/7/20166/8/20166/8/2016APASS
DetailsMike Jordan
Ceiling grid and fire caulking on level 4, units 401 thru 405 Phone #: ###-#### Inspection requested via web by Michael Zaccheo. Fire caulking complete at floor ceiling penetrations at all drop ceiling locations in rooms 401 to 405.
BLD-Energy code compliance6/7/20166/8/20166/8/2016APASS
DetailsMike Jordan
Energy code compliance all of level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/31/20166/3/20166/3/2016PNR
DetailsDave Hannah
Energy code compliance level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/31/20166/2/20166/3/2016APASS
DetailsDave Hannah
Foam and framing inspection all of level 6 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/30/20165/31/20166/1/2016PPASS
DetailsDave Hannah
Energy code compliance west corridor exterior walls level''s 4, 5, ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/30/20165/31/20165/31/2016PCANC
DetailsDave Hannah
Foam and framing 6th floor. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Ceiling Grid Inspection5/20/20165/24/20165/25/2016PPASS
DetailsDave Hannah
Cover inspection area 2 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover thrid floor soffits
BLD-Ceiling Grid Inspection5/20/20165/23/20165/23/2016PFAIL
DetailsDave Hannah
Cover inspection area 1 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/17/20165/18/20165/18/2016APASS
DetailsDave Hannah
Energy code compliance northwest stairwell. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/17/20165/17/20165/17/2016APASS
DetailsDave Hannah
Energy compliance in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/12/20165/12/20165/13/2016PPASS
DetailsDave Hannah
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/11/20165/12/20165/13/2016PPASS
DetailsDave Hannah
Foam and framing in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance5/11/20165/12/20165/12/2016APEND
DetailsDave Hannah
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in5/9/20165/10/20165/11/2016PPASS
DetailsDave Hannah
Foam And framing inspection area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/28/20164/28/20164/29/2016PPASS
DetailsDave Hannah
Energy code compliance area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/26/20164/27/20164/27/2016APASS
DetailsDave Hannah
Foam sealant, shear wall, and rough framing area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/25/20164/26/20164/26/2016PCANC
DetailsDave Hannah
Foam and framing inspection area 2 on level 4. I have the city set on site now. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Energy code compliance4/20/20164/20/20164/21/2016PPASS
DetailsDave Hannah
Exterior wall insulation area 1 level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/19/20164/19/20164/20/2016PPASS
DetailsDave Hannah
Foam and framing inspection area 1 level 4. Please check with Mechanical inspector before arrival. He is also scheduled for PM inspection to cover. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover4/12/20164/13/20164/13/2016ADONE
DetailsDave Hannah
Sheer wall nailing on exterior of north wall. MTI to inspect late morning as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/12/20164/13/20164/13/2016PPASS
DetailsDave Hannah
Energy compliance for area 2 (units 4,5,6, 7) on floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/11/20164/12/20164/12/2016PPASS
DetailsDave Hannah
Foam insulation in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/11/20164/12/20164/12/2016PPASS
DetailsDave Hannah
Framing, and sheer wall in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover4/7/20164/7/20164/7/2016PPASS
DetailsDave Hannah
Fire block for area 1 (units 301, 302, 303) on 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in4/4/20164/5/20164/7/2016PPASS
DetailsDave Hannah
Framing and sheer-wall in area 1 on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Energy code compliance4/5/20164/6/20164/7/2016PPASS
DetailsDave Hannah
Exterior wall insulation for energy compliance in area 1 on level 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/29/20163/30/20163/30/2016APASS
DetailsDave Hannah
Sheer wall nailing in 5th floor corridor and stairs. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference3/22/20163/22/20163/23/2016PDONE
DetailsDave Hannah
Conference on drop ceiling 2 hr assembly. If possible, please call 30 minutes in advance of arrival. Thanks. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover3/16/20163/17/20163/17/2016APART
DetailsDave Hannah
2 hr wall assembly @ trash and recycle shaft Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/16/20163/16/20163/17/2016PPART
DetailsDave Hannah
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/16/20163/16/20163/16/2016ANR
DetailsDave Hannah
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover3/15/20163/15/20163/15/2016ACANC
DetailsDave Hannah
2 hr shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo work inprogress
BLD-Framing/Rough-in3/9/20163/10/20163/10/2016APASS
DetailsDave Hannah
South side of roof for roof sheet nailing. Contact on site tomorrow will be Jack Lunsford ###-#### Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/8/20163/9/20163/9/2016PPART
DetailsDave Hannah
Roof sheet nailing inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover north half
BLD-Wall cover3/4/20163/7/20163/8/2016APASS
DetailsDave Hannah
Sheer wall inspection on the West wall adjacent to the Safari Inn. Will have MTI inspection on same wall @ 11:00 a.m. as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in3/4/20163/7/20163/8/2016PPART
DetailsDave Hannah
Roof sheeting nailing on North side of foot print. Phone #: ###-#### Inspection requested via web by Michael Zaccheo north west corner
BLD-Conference2/22/20162/23/20162/24/2016PDONE
DetailsDave Hannah
Fire rated drywall boxes for can lights. Please call approximately 30 minutes before arrival so all concerning parties can be present. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Conference2/16/20162/16/20162/16/2016PPASS
DetailsDave Hannah
Shear wall inspection on 3rd floor corridor and 6th floor west wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Framing/Rough-in2/2/20162/3/20162/4/2016APART
DetailsDave Hannah
would like call ahead; Jack Phone #: ###-#### ok to cover lids in corradors
BLD-Wall cover1/12/20161/12/20161/12/2016PPART
DetailsDave Hannah
Two hour shaft drywall inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover1/4/20161/5/20161/5/2016PPART
DetailsDave Hannah
Drywall inspection for shaft walls. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
BLD-Wall cover1/1/20161/4/20161/4/2016PCANC
DetailsDave Hannah
Shaft wall drywall inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
BLD-Framing/Rough-in12/30/201512/31/201512/31/2015APART
DetailsDave Hannah
Inspection of 3rd and 4th floor framing of 2 hr. shaft walls for drywall on interior side of shafts. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to start rocking
BLD-Framing/Rough-in12/22/201512/23/201512/23/2015APASS
DetailsDave Hannah
Inspection for application of Durock on 2 hour exterior wall next to Safari Inn. MTI is inspecting the sheer-wall portion @ 8 a.m. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
Plan assigned to (AJS)12/16/201512/16/201512/17/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK12/16/2015 12/17/2015 PASS
DetailsAdele J Schaffeld-Griffin
change to stair termination layout
Permit Ready to Issue  12/17/2015 DONE
DetailsChristina Prado
All requirements met
CHANGE STATUS TO (ISS)  12/17/2015 DONE
DetailsChristina Prado
Plan Modification Accepted  12/16/2015 DONE
BLD-Framing/Rough-in11/11/201511/12/201511/12/2015APART
DetailsDave Hannah
For 1 hr. firewall @ Northwest corner, 3rd floor, next to Safari Inn. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to stand wall
BLD-Framing/Rough-in11/6/201511/6/201511/9/2015PNR
DetailsDave Hannah
Mike Phone #: ###-####
BLD-Framing/Rough-in11/4/201511/5/201511/5/2015PCANC
DetailsMike Jordan
Mike Phone #: ###-####. Will reschedule for tomorrow. Contractor looking for meeting with framers.
Print Occupancy Form  8/20/2015 DONE
Issue PAID IN FULL permit  8/20/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/2/2015 DONE
Permit Ready to Issue  4/2/2015 DONE
ACHD Complete. Need GC, RP and Revised Cert of Value
Routing - PLAN CHECK2/24/2015 4/2/2015 PASS
DetailsAdele J Schaffeld-Griffin
Plan assigned to (AJS)9/30/2014 4/2/2015 PASS
DetailsAdele J Schaffeld-Griffin
2/24 Resubmittals 1st review completed New Building 10th and Grove Condos
Routing Off Site - STRUCTURAL2/24/2015 3/10/2015 PASS
DetailsAdele J Schaffeld-Griffin
Extend Review Timeline  3/10/2015 DONE
DetailsJason Blais
Routing - PLAN CHECK2/6/2015 2/18/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL2/6/2015 2/17/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE2/6/20152/6/20152/10/2015 PASS
DetailsScott Arellano
Approved. See attached comments.
Routing - FIRE1/23/20151/23/20151/23/2015 PASS
DetailsScott Arellano
Updated fire review comments. Attached report to plans.
Routing - PLAN CHECK1/8/2015 1/8/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL1/7/2015 1/7/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Street Lights1/7/2015 1/7/2015 PASS
DetailsMike D Hedge
Routing - FIRE12/30/201412/30/20141/5/2015 FAIL
DetailsScott Arellano
Attached plan review report to plans. Emailed archtiect revised report.
Routing - PLUMBING12/23/2014 12/23/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Route to Impact Fee Review11/17/201411/20/201411/18/2014 PASS
DetailsCindy M. Gould
Routing PW Solid Waste9/30/2014 11/17/2014 PASS
DetailsPeter J. McCullough
1st review completed  11/14/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK10/13/2014 11/14/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL9/30/2014 10/16/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE9/30/2014 10/13/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 10-13-14
Routing - PLUMBING9/30/2014 10/3/2014 FAIL
DetailsDaryl Spivey
1) venting from the flammable liquids interceptor and fixtures upstream of the interceptor may not connect to sanitary sewer venting, must be vented separetly through the roof.
2) address suds relief throughout.
Routing PW Sewer Design9/30/2014 10/2/2014 PASS
DetailsKyle S. Rosenmeyer
Reviewed under BLD14-02156
Routing PW Drainage9/30/2014 10/1/2014 PASS
DetailsBrian Murphy
Routing PW Street Lights9/30/2014 10/1/2014 FAIL
DetailsMike D Hedge
No street light drawings found, street lighting required.
Routing - Design Review9/30/2014 10/1/2014 PASS
DetailsJosh Wilson
Received approval for encroachment from Boise Canal Company via email 10/1/14
Routing PW Sewer Rating9/30/2014 9/30/2014 PASS
DetailsJennifer Bruner
Routing - Addressing9/30/2014 9/30/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/30/2014 9/30/2014 PASS
DetailsBeverly Mountain
completed Beverly Mountain
Intake Approval  9/30/2014 PASS
DetailsJohn Menard
Intake Approval  9/29/2014 FAIL
DetailsTim L. Woodard
James,

Please upload the "E" and "M" sheets referenced in attached checklist.

Best regards,

Tim Woodard
###-####
Application received  9/26/2014 DONE
Application submitted via PDS Online on Sep 26 2014 11:02AM
Pending Assignment by JCM9/30/2014    
DetailsJohn Menard