BLD-Aging Inspection | 6/26/2020 | 6/26/2020 | 6/30/2020 | | PEND |
Dave Hannah
|
|
|
|
Telephone call | | | 5/27/2020 | | DONE |
|
|
|
emailed Robert at CSDI to let him know this permit has expired and that he must either final it or request an extension from Jason Blais.
|
Telephone call | | | 4/23/2020 | | DONE |
|
|
|
emailed Robert to let him know this TCO will expire soon. Asked him to schedule a final inspection or request an extension from Jason Blais.
|
Telephone call | | | 4/10/2020 | | DONE |
|
|
|
emailed Robert Feldmann at CSDI: rfeldmann@csdiconstruction.com - to let him know that his TCO will expire 5/4/2020 and to request an extension from Jason Blais.
|
BLD-Aging Inspection | 3/9/2020 | 3/9/2020 | 3/12/2020 | | PEND |
Dave Hannah
|
|
|
|
Change Expiration Date Only | | | 1/15/2020 | | DONE |
|
|
|
Per Jason Blais - permit extended 90 days from 2/4/20. See DOCS
|
Telephone call | | | 1/14/2020 | | DONE |
|
|
|
Called and spoke with Robert. Sawtooth & CSHQA still in litigation about ADA requirements. Emailed Robert with directions on how to request an extension.
|
BLD-Aging Inspection | 11/11/2019 | 11/11/2019 | 11/14/2019 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 11/1/2019 | 1/30/2020 | 11/1/2019 | | DONE |
Gemma Flores
|
|
|
TCO extended 90 days from 11/6/2019 per Jason Blais. See DOCs. Request from extension from Jim Marsh of CSHQA. James.marsh@cshqa.com
|
Telephone call | | | 10/25/2019 | | DONE |
|
|
|
Called and spoke with Robert Feldman. He said that the contractor and the owner are going to court. Court date is 11/6. He said he will pass on to Sawtooth that the permit will expire on the 6th and that they need to request another extension.
rfeldmann@csdiconstruction.com
|
BLD-Aging Inspection | 8/12/2019 | 8/12/2019 | 8/19/2019 | | DONE |
Dave Hannah
|
|
|
|
Temporary Occupancy | 8/19/2019 | 11/17/2019 | 8/19/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd extension of temp c of o for 90 days from 8/8/19
|
Telephone call | | | 8/13/2019 | | DONE |
|
|
|
Called Robert Feldman as a reminder again that the temp C of O expired 8-8-19-he will contact Sawtooth Dev and have them email Jason Blais again
|
Telephone call | | | 8/5/2019 | | DONE |
|
|
|
called Robert Feldman ###-#### to let know the temp c of o is about to expire-left message on his answering machine
|
BLD-Aging Inspection | 6/10/2019 | 6/10/2019 | 6/13/2019 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 5/7/2019 | 8/5/2019 | 5/7/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 90 day extension starting from 5/10/19
|
BLD-Aging Inspection | 3/29/2019 | 3/29/2019 | 4/4/2019 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 2/5/2019 | 5/6/2019 | 2/5/2019 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais-ext req ok good thru +90 days from 2-9-19
|
BLD-Aging Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 11/14/2018 | 2/12/2019 | 11/14/2018 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais ok for 90 day ext on temp c of o
|
BLD-Aging Inspection | 10/29/2018 | 10/29/2018 | 11/2/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 8/24/2018 | 11/22/2018 | 8/24/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd the extension for 90 days from 8-13-18
|
Telephone call | | | 8/23/2018 | | DONE |
|
|
|
called to remind Robert Feldman that the temp c of o is expired and he needs to request an extension or call in finals-left message on his office phone
|
Telephone call | | | 8/13/2018 | | DONE |
|
|
|
called Robert Feldman again to let know that the temp c of o expires today
|
Telephone call | | | 8/7/2018 | | DONE |
|
|
|
called Robert to let know temp c of o will expire on 8-13-18-left message on his phone
|
BLD-Aging Inspection | 7/13/2018 | 7/13/2018 | 7/18/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 5/25/2018 | 8/23/2018 | 5/25/2018 | | DONE |
Candy A. Nichols
|
|
|
per Jason B-ok to extend temp c of o for 90 days starting from 5/15/18
|
Telephone call | | | 5/22/2018 | | DONE |
|
|
|
called again-Robert Feldman-who was out again so talked to Jack L. He will either call the final in if ready or request an extension - emailed him as well
|
Telephone call | | | 5/18/2018 | | DONE |
|
|
|
called Robert Warner (?) he said i needed Robert Feldman-transfrerred me to him and i had to leave a message on his voice mail asking him to request and extension on the temp c of o or call in his finals
|
Telephone call | | | 5/15/2018 | | DONE |
|
|
|
called Robert to let know temp c of o expires today-left message on his phone
|
BLD-Aging Inspection | 4/23/2018 | 4/23/2018 | 5/1/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/19/2018 | 2/19/2018 | 2/20/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 2/8/2018 | 5/9/2018 | 2/8/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd extension good thru May 15th 2018
|
BLD-Aging Inspection | 12/18/2017 | 12/18/2017 | 12/19/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/16/2017 | 10/16/2017 | 10/16/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 10/6/2017 | 1/4/2018 | 10/6/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais approved ext for 90 days starting from 11/16/17
|
BLD-Aging Inspection | 8/16/2017 | 8/16/2017 | 8/23/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 8/18/2017 | 11/16/2017 | 8/18/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd extension of the temp c of o for 90 days
|
Telephone call | | | 8/15/2017 | | DONE |
|
|
|
called to let Robert know the temp c of o will expire in 3 days-he's well aware of it
|
BLD-Aging Inspection | 6/16/2017 | 6/16/2017 | 6/20/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 5/17/2017 | 8/15/2017 | 5/17/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais-ok to estend temp c of o-90 days from 5/20/17
|
BLD-Aging Inspection | 3/28/2017 | 3/28/2017 | 3/28/2017 | | PEND |
Dave Hannah
|
|
|
|
Telephone call | | | 2/10/2017 | | DONE |
|
|
|
called as a reminder that the temp c of o is about to expire (2/19/2017)-Jack will request and extension
|
Temporary Occupancy | 2/9/2017 | 5/10/2017 | 2/9/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais approved a 90 day temp c of o extension good thru May 20 2017
|
BLD-Aging Inspection | 1/26/2017 | 1/26/2017 | 1/27/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 11/15/2016 | 11/15/2016 | 11/21/2016 | P | PEND |
Dave Hannah
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
Temporary Occupancy | 11/21/2016 | 2/19/2017 | 11/21/2016 | | DONE |
Brittany Hill
|
|
|
|
BLD-Final | 11/17/2016 | 11/18/2016 | 11/19/2016 | P | PEND |
Dave Hannah
|
|
|
Building final Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok for temp occ but needs to fix ada issues
|
BLD-Final | 11/16/2016 | 11/16/2016 | 11/16/2016 | A | NR |
Dave Hannah
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/15/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place, addressing will be installed when recieved as well as stairwell signage (verified install payment be contractor invoice, signs will be installed when recieved) Final life fire safety inspection passed/complete.
|
BLD-Final | 11/8/2016 | 11/10/2016 | 11/9/2016 | A | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
|
FIRE-Final Inspection | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | CANC |
Troy Cobbley
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
|
Zoning Approval | 11/8/2016 | 11/8/2016 | 11/8/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 10/28/2016 | 10/31/2016 | 11/1/2016 | P | NR |
Dave Hannah
|
|
|
Final after Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 10/28/2016 | 10/31/2016 | 10/31/2016 | A | CANC |
Katie Marron
|
|
|
No inspection completed. Waiting to do in conjunction with Fire Alarm Final.
|
BLD-Final | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | CANC |
Dave Hannah
|
|
|
Final after Fire/Life/Safety inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Conference | 10/19/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Dave Hannah
|
|
|
Handrail compliance. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Dave Hannah
|
|
|
6th floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PASS |
Dave Hannah
|
|
|
Fifth floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Dave Hannah
|
|
|
Ceiling grid inspection 4th floor corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 9/7/2016 | 9/7/2016 | 9/8/2016 | P | PASS |
Dave Hannah
|
|
|
Hole patches to enclose utility shaft levels 3 thru 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 8/31/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
Dave Hannah
|
|
|
Ceiling grid level 3 corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 8/31/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
Dave Hannah
|
|
|
Shaft wall trash/recycle and closure of utility shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 8/23/2016 | 8/23/2016 | 8/24/2016 | P | PASS |
Dave Hannah
|
|
|
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 8/24/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Dave Hannah
|
|
|
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | PASS |
Mike Jordan
|
|
|
Lobby framing inspection Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Dave Hannah
|
|
|
Framing hard lids ; fire caulking above hard lids in corridors 5 ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 7/30/2016 | 8/1/2016 | 8/5/2016 | P | PASS |
Dave Hannah
|
|
|
Drop soffit framing 3rd and 4th floor corridors. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 7/25/2016 | 7/27/2016 | 7/27/2016 | A | DONE |
Dave Hannah
|
|
|
Meeting with 119 owners group concerning A.D.A. compliance in unit 301. Owners will be on site between 9 a.m. and noon. If you can schedule your visit between those hours it would be appreciated. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Dave Hannah
|
|
|
Re- inspection drop ceiling 604 and inspection drop ceiling 605 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | CANC |
Dave Hannah
|
|
|
Re-inspection of unit 604 drop ceiling. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PART |
Dave Hannah
|
|
|
Drop ceiling inspection units 602, 604, ; 605. Phone #: ###-#### Inspection requested via web by Michael Zaccheo 602 ok
|
BLD-Ceiling Grid Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Jim Storey
|
|
|
Drop ceiling inspection unit 603. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | PASS |
Dave Hannah
|
|
|
Unit 601 drop ceiling framing and fire caulking. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Dave Hannah
|
|
|
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 6/30/2016 | 6/30/2016 | 7/1/2016 | P | CANC |
Dave Hannah
|
|
|
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/27/2016 | 6/28/2016 | 6/29/2016 | P | PASS |
Dave Hannah
|
|
|
Drop ceiling framing and fire caulking units 505 thru 507. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PASS |
Mike Jordan
|
|
|
Fire drywall at exterior west wall at gussets. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/21/2016 | 6/22/2016 | 6/23/2016 | P | PASS |
Dave Hannah
|
|
|
Drop ceiling framing and fire caulking units 501 thru 504. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/14/2016 | 6/15/2016 | 6/15/2016 | A | PASS |
Dave Hannah
|
|
|
Hard lid and fire caulking units 406 ; 407. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Mike Jordan
|
|
|
Ceiling grid and fire caulking on level 4, units 401 thru 405 Phone #: ###-#### Inspection requested via web by Michael Zaccheo. Fire caulking complete at floor ceiling penetrations at all drop ceiling locations in rooms 401 to 405.
|
BLD-Energy code compliance | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Mike Jordan
|
|
|
Energy code compliance all of level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/31/2016 | 6/3/2016 | 6/3/2016 | P | NR |
Dave Hannah
|
|
|
Energy code compliance level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/31/2016 | 6/2/2016 | 6/3/2016 | A | PASS |
Dave Hannah
|
|
|
Foam and framing inspection all of level 6 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/30/2016 | 5/31/2016 | 6/1/2016 | P | PASS |
Dave Hannah
|
|
|
Energy code compliance west corridor exterior walls level''s 4, 5, ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/30/2016 | 5/31/2016 | 5/31/2016 | P | CANC |
Dave Hannah
|
|
|
Foam and framing 6th floor. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 5/20/2016 | 5/24/2016 | 5/25/2016 | P | PASS |
Dave Hannah
|
|
|
Cover inspection area 2 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover thrid floor soffits
|
BLD-Ceiling Grid Inspection | 5/20/2016 | 5/23/2016 | 5/23/2016 | P | FAIL |
Dave Hannah
|
|
|
Cover inspection area 1 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Dave Hannah
|
|
|
Energy code compliance northwest stairwell. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/17/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Dave Hannah
|
|
|
Energy compliance in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/12/2016 | 5/12/2016 | 5/13/2016 | P | PASS |
Dave Hannah
|
|
|
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/11/2016 | 5/12/2016 | 5/13/2016 | P | PASS |
Dave Hannah
|
|
|
Foam and framing in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PEND |
Dave Hannah
|
|
|
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/9/2016 | 5/10/2016 | 5/11/2016 | P | PASS |
Dave Hannah
|
|
|
Foam And framing inspection area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/28/2016 | 4/28/2016 | 4/29/2016 | P | PASS |
Dave Hannah
|
|
|
Energy code compliance area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | PASS |
Dave Hannah
|
|
|
Foam sealant, shear wall, and rough framing area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/25/2016 | 4/26/2016 | 4/26/2016 | P | CANC |
Dave Hannah
|
|
|
Foam and framing inspection area 2 on level 4. I have the city set on site now. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Energy code compliance | 4/20/2016 | 4/20/2016 | 4/21/2016 | P | PASS |
Dave Hannah
|
|
|
Exterior wall insulation area 1 level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/19/2016 | 4/19/2016 | 4/20/2016 | P | PASS |
Dave Hannah
|
|
|
Foam and framing inspection area 1 level 4. Please check with Mechanical inspector before arrival. He is also scheduled for PM inspection to cover. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | DONE |
Dave Hannah
|
|
|
Sheer wall nailing on exterior of north wall. MTI to inspect late morning as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/12/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Dave Hannah
|
|
|
Energy compliance for area 2 (units 4,5,6, 7) on floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Dave Hannah
|
|
|
Foam insulation in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Dave Hannah
|
|
|
Framing, and sheer wall in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Dave Hannah
|
|
|
Fire block for area 1 (units 301, 302, 303) on 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/4/2016 | 4/5/2016 | 4/7/2016 | P | PASS |
Dave Hannah
|
|
|
Framing and sheer-wall in area 1 on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/5/2016 | 4/6/2016 | 4/7/2016 | P | PASS |
Dave Hannah
|
|
|
Exterior wall insulation for energy compliance in area 1 on level 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Dave Hannah
|
|
|
Sheer wall nailing in 5th floor corridor and stairs. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 3/22/2016 | 3/22/2016 | 3/23/2016 | P | DONE |
Dave Hannah
|
|
|
Conference on drop ceiling 2 hr assembly. If possible, please call 30 minutes in advance of arrival. Thanks. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PART |
Dave Hannah
|
|
|
2 hr wall assembly @ trash and recycle shaft Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/17/2016 | P | PART |
Dave Hannah
|
|
|
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/16/2016 | A | NR |
Dave Hannah
|
|
|
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 3/15/2016 | 3/15/2016 | 3/15/2016 | A | CANC |
Dave Hannah
|
|
|
2 hr shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo work inprogress
|
BLD-Framing/Rough-in | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | PASS |
Dave Hannah
|
|
|
South side of roof for roof sheet nailing. Contact on site tomorrow will be Jack Lunsford ###-#### Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/8/2016 | 3/9/2016 | 3/9/2016 | P | PART |
Dave Hannah
|
|
|
Roof sheet nailing inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover north half
|
BLD-Wall cover | 3/4/2016 | 3/7/2016 | 3/8/2016 | A | PASS |
Dave Hannah
|
|
|
Sheer wall inspection on the West wall adjacent to the Safari Inn. Will have MTI inspection on same wall @ 11:00 a.m. as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/4/2016 | 3/7/2016 | 3/8/2016 | P | PART |
Dave Hannah
|
|
|
Roof sheeting nailing on North side of foot print. Phone #: ###-#### Inspection requested via web by Michael Zaccheo north west corner
|
BLD-Conference | 2/22/2016 | 2/23/2016 | 2/24/2016 | P | DONE |
Dave Hannah
|
|
|
Fire rated drywall boxes for can lights. Please call approximately 30 minutes before arrival so all concerning parties can be present. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | PASS |
Dave Hannah
|
|
|
Shear wall inspection on 3rd floor corridor and 6th floor west wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 2/2/2016 | 2/3/2016 | 2/4/2016 | A | PART |
Dave Hannah
|
|
|
would like call ahead; Jack Phone #: ###-#### ok to cover lids in corradors
|
BLD-Wall cover | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PART |
Dave Hannah
|
|
|
Two hour shaft drywall inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 1/4/2016 | 1/5/2016 | 1/5/2016 | P | PART |
Dave Hannah
|
|
|
Drywall inspection for shaft walls. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 1/1/2016 | 1/4/2016 | 1/4/2016 | P | CANC |
Dave Hannah
|
|
|
Shaft wall drywall inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Framing/Rough-in | 12/30/2015 | 12/31/2015 | 12/31/2015 | A | PART |
Dave Hannah
|
|
|
Inspection of 3rd and 4th floor framing of 2 hr. shaft walls for drywall on interior side of shafts. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to start rocking
|
BLD-Framing/Rough-in | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection for application of Durock on 2 hour exterior wall next to Safari Inn. MTI is inspecting the sheer-wall portion @ 8 a.m. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
Plan assigned to (AJS) | 12/16/2015 | 12/16/2015 | 12/17/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/16/2015 | | 12/17/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
change to stair termination layout
|
Permit Ready to Issue | | | 12/17/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
CHANGE STATUS TO (ISS) | | | 12/17/2015 | | DONE |
Christina Prado
|
|
|
|
Plan Modification Accepted | | | 12/16/2015 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/11/2015 | 11/12/2015 | 11/12/2015 | A | PART |
Dave Hannah
|
|
|
For 1 hr. firewall @ Northwest corner, 3rd floor, next to Safari Inn. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to stand wall
|
BLD-Framing/Rough-in | 11/6/2015 | 11/6/2015 | 11/9/2015 | P | NR |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2015 | 11/5/2015 | 11/5/2015 | P | CANC |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Will reschedule for tomorrow. Contractor looking for meeting with framers.
|
Print Occupancy Form | | | 8/20/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/20/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
ACHD Complete. Need GC, RP and Revised Cert of Value
|
Routing - PLAN CHECK | 2/24/2015 | | 4/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan assigned to (AJS) | 9/30/2014 | | 4/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
2/24 Resubmittals 1st review completed New Building 10th and Grove Condos
|
Routing Off Site - STRUCTURAL | 2/24/2015 | | 3/10/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Extend Review Timeline | | | 3/10/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - PLAN CHECK | 2/6/2015 | | 2/18/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 2/6/2015 | | 2/17/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 2/6/2015 | 2/6/2015 | 2/10/2015 | | PASS |
Scott Arellano
|
|
|
Approved. See attached comments.
|
Routing - FIRE | 1/23/2015 | 1/23/2015 | 1/23/2015 | | PASS |
Scott Arellano
|
|
|
Updated fire review comments. Attached report to plans.
|
Routing - PLAN CHECK | 1/8/2015 | | 1/8/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 1/7/2015 | | 1/7/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Street Lights | 1/7/2015 | | 1/7/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing - FIRE | 12/30/2014 | 12/30/2014 | 1/5/2015 | | FAIL |
Scott Arellano
|
|
|
Attached plan review report to plans. Emailed archtiect revised report.
|
Routing - PLUMBING | 12/23/2014 | | 12/23/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Route to Impact Fee Review | 11/17/2014 | 11/20/2014 | 11/18/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Solid Waste | 9/30/2014 | | 11/17/2014 | | PASS |
Peter J. McCullough
|
|
|
|
1st review completed | | | 11/14/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 10/13/2014 | | 11/14/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 9/30/2014 | | 10/16/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 9/30/2014 | | 10/13/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 10-13-14
|
Routing - PLUMBING | 9/30/2014 | | 10/3/2014 | | FAIL |
Daryl Spivey
|
|
|
1) venting from the flammable liquids interceptor and fixtures upstream of the interceptor may not connect to sanitary sewer venting, must be vented separetly through the roof.
2) address suds relief throughout.
|
Routing PW Sewer Design | 9/30/2014 | | 10/2/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Reviewed under BLD14-02156
|
Routing PW Drainage | 9/30/2014 | | 10/1/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 9/30/2014 | | 10/1/2014 | | FAIL |
Mike D Hedge
|
|
|
No street light drawings found, street lighting required.
|
Routing - Design Review | 9/30/2014 | | 10/1/2014 | | PASS |
Josh Wilson
|
|
|
Received approval for encroachment from Boise Canal Company via email 10/1/14
|
Routing PW Sewer Rating | 9/30/2014 | | 9/30/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/30/2014 | | 9/30/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/30/2014 | | 9/30/2014 | | PASS |
Beverly Mountain
|
|
|
completed Beverly Mountain
|
Intake Approval | | | 9/30/2014 | | PASS |
John Menard
|
|
|
|
Intake Approval | | | 9/29/2014 | | FAIL |
Tim L. Woodard
|
|
|
James,
Please upload the "E" and "M" sheets referenced in attached checklist.
Best regards,
Tim Woodard
###-####
|
Application received | | | 9/26/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 26 2014 11:02AM
|
Pending Assignment by JCM | 9/30/2014 | | | | |
John Menard
|
|
|
|