BLD-Final | 9/2/2015 | 9/3/2015 | 9/3/2015 | P | PASS |
Dave Hannah
|
|
|
Please call Chris at ###-#### half an hour before inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
|
FIRE-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 | A | PASS |
Jim Page
|
|
|
Fire sprinkler located in walk in cooler, life fire safety passed/complete
|
FIRE-Conference | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | DONE |
Forrest France
|
|
|
On site conference regarding fire life safety inspection items and trade related alarm, sprinkler and hood suppression system work.
|
BLD-Ceiling Grid Inspection | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Eby
|
BLD-Ceiling Grid Inspection | 12/3/2014 | 12/4/2014 | 12/4/2014 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Eby needs to get elec rough in sign off
|
Telephone call | | | 9/29/2014 | | DONE |
Christina Prado
|
|
|
called Blake to advise permit is ready pending GC form and gave fees due
|
Permit Ready to Issue | | | 9/29/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/29/2014 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/26/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (TLW) | 9/26/2014 | | 9/26/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/26/2014 | | 9/26/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved for kitchen buildout in the basement area only. TLW
|
1st review completed | | | 9/26/2014 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/26/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 9/26/2014 | | | |
|
|
|
|