Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-02898
StatusFinaled
Name SYRINGA CONSTRUCTION LLC
Site Address 2590 N HEAVENS WAY
Project Name 
Customer NumberBLD14-02996
ePlanReviewNo
Description
***EROSION PERMIT ESC1400993 IS ATTACHED TO BLD14-02996-IS FOR FOR NSFD & RETAINING WALL***-WUI Zone A, Class A Roof, Permit for the construction of a new 3591 sq. ft., two story (first story 2777 sq. ft., second story 814 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 689 sq. ft. of covered patio/porch and a 927 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/5/201510/5/201510/5/2015PDONE
DetailsTony Young
Exterior soffits - Steve Phone #: ###-####
DOC - Permit Finaled10/5/201510/5/201510/5/2015PPASS
DetailsTony Young
done
BLD-Final4/2/20154/3/20154/3/2015PPASS
DetailsTony Young
Garage access code is 0713 or 4444. Please call with any questions. Thanks, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle,, bond in place,, final ok
PubWorks Occupancy Approval4/3/20154/3/20154/3/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Wall cover12/22/201412/23/201412/23/2014APASS
DetailsTony Young
soffits
BLD-Energy code compliance12/19/201412/22/201412/22/2014APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Lucas Christian
BLD-Energy code compliance12/18/201412/19/201412/19/2014PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Lucas Christian,, work in progress
BLD-Framing/Rough-in12/18/201412/18/201412/19/2014PPASS
DetailsJim Sly
Lucas phone......###-####
BLD-Conference12/17/201412/18/201412/18/2014APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Lucas Christian
Cans in soffits protected with 3/4" fire rated plywood box. Fire rated plywood installed prior to tongue and groove at soffits and patio ceilings.
Plan Modification Accepted  12/8/2014 DONE
new manual j
Routing - MECHANICAL12/8/2014 12/8/2014 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing12/1/201412/2/201412/2/2014APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Lucas Christian,, exterior ok to cover now
BLD-Wall Bracing12/1/201412/1/201412/1/2014PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Lucas Christian,, exterior shear ok,, work in progress
BLD-Conference11/29/201412/1/201412/1/2014ACANC
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Lucas Christian,, wanted shear inspection
BLD-Foundation10/29/201410/30/201410/30/2014PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing10/29/201410/30/201410/30/2014APASS
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing10/28/201410/28/201410/28/2014ANR
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
Need to complete rebar in footings......
Got a verbal from Jim Wylee that subgrade was approved.
Routing PW Grading-Hillside10/28/2014 10/28/2014 PASS
DetailsJim Wyllie
Received second geotec report approving foundation subgrade. Okay to schedule a footing inspection. (jim Wyllie / ###-####)
Issue PAID IN FULL permit  10/16/2014 DONE
DetailsChristina Prado
Plan assigned to (JG) 9/29/201410/15/2014 PASS
DetailsJavier Guzman
1st review completed, Pending Hillside, 10/15 W L2 Hillside**
Case Summary (BLD)  10/15/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/15/2014 DONE
Inspection Record Card- Bld  10/15/2014 DONE
DetailsCandy A. Nichols
Telephone call  10/15/2014 DONE
DetailsChristina Prado
called Steve to advise permit is ready and gave fees due
Permit Ready to Issue  10/15/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK10/13/2014 10/15/2014 PASS
DetailsJavier Guzman
Routing PW Grading-Hillside10/14/2014 10/14/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
1st review completed  10/13/2014 DONE
DetailsJavier Guzman
Routing - PLAN CHECK10/2/2014 10/13/2014 FAIL
DetailsJavier Guzman
Pending Hillside review
Route to Impact Fee Review9/29/201410/2/201410/6/2014 PASS
DetailsCindy M. Gould
Routing - Erosion and Sediment10/1/2014 10/2/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection & Approval Required Prior to Earth Disturbance
Routing - MECHANICAL  10/1/2014 PASS
DetailsTroy James
Routing - PLANNING9/30/2014 9/30/2014 PASS
DetailsSue Cummings
see notes on site planre: driveway width. In the Foothills WUI zone also.
Routing - FIRE9/30/2014 9/30/2014 PASS
DetailsScott Arellano
This structure has been evaluated for Fire Department Vehicle Access.
Routing - PUBLIC WORKS9/29/2014 9/30/2014 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside9/29/2014 9/29/2014 FAIL
DetailsJason C. Taylor
Grading plan needs revised/signed by civil engineer prior to approval. Need engineering for retaining walls. JCT ###-####
Routing - Addressing9/29/2014 9/29/2014 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  9/29/2014 DONE
DetailsChristina Prado
Intake Approval  9/29/2014 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  9/29/2014 DONE
DetailsChristina Prado
Application received 9/29/2014