BLD-Final | 1/8/2015 | 1/14/2015 | 1/14/2015 | P | PASS |
Mike Jordan
|
|
|
Ted or Jeff Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 1/8/2015 | 1/14/2015 | 1/14/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 1/14/2015 | | DONE |
|
|
|
|
BLD-Final | 11/19/2014 | 11/19/2014 | 11/19/2014 | P | NR |
Mike Jordan
|
|
|
Ted-please to meet Phone #: ###-####
|
FIRE-Final Inspection | 11/19/2014 | 11/19/2014 | 11/19/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide illuminated exit sign per the revised approved drawings
|
BLD-Final | 10/8/2014 | 10/9/2014 | 10/9/2014 | P | NR |
Mike Jordan
|
|
|
Ted Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 10/8/2014 | 10/9/2014 | 10/9/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide revised floor plan to plan review, provide sticker at the main exit, remove the deadbolts/thumbturn from the exit doors and provide single action hardware. The main exit is ok to be keyed.
|
Issue & PRINT permit | | | 10/8/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 10/6/2014 | | DONE |
Christina Prado
|
|
|
Called Rex to advise permit is ready for pick up
|
Permit Ready to Issue | | | 10/6/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 10/6/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | 9/30/2014 | 9/30/2014 | 10/3/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/30/2014 | | 10/3/2014 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/3/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/3/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/30/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/30/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 1/26/2015 | | | |
|
|
|
|
Application received | | 9/30/2014 | | | |
|
|
|
|