BLD-Final | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/28/2016 | 2/2/2016 | 2/2/2016 | A | FAIL |
Jim Storey
|
|
|
john Phone #: ###-#### no insp.
|
Telephone call | | | 12/29/2015 | | DONE |
|
|
|
left message for David about scheduling a final inspection
|
FIRE-Final Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | P | PASS |
Forrest France
|
|
|
Delayed egress hardware removed, corrections verified. Fire life safety passed.
|
FIRE-Final Inspection | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | NR |
Forrest France
|
|
|
Conditions per IFC for delayed egress locks are not satisfied. Plans do not reflect delayed egress hardware installed.
|
FIRE-Final Inspection | 11/3/2014 | 11/4/2014 | 11/4/2014 | A | FAIL |
Forrest France
|
|
|
Missing exit sign per approved plan, delayed egress function at new door is not reflected on drawings or provided with conditions to be met per IFC 2012 1008.1.9.7.
|
Issue PAID IN FULL permit | | | 10/8/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2014 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2014 | | DONE |
|
|
|
called David-informed him that the building permit is ready and told him balance due
|
Permit Ready to Issue | | | 10/3/2014 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 9/30/2014 | | 10/2/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 9/30/2014 | | 10/2/2014 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 10/2/2014 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 10/2/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/2/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/30/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/30/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/30/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 9/30/2014 | | | |
|
|
|
|