Permit Information
Permit NumberBLD14-02932
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 2805 E HARD ROCK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 4459 sq. ft., two story (basement level 2195 sq. ft., first story 2264 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 560 sq. ft. of covered patio/porch and a 1316 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. JG
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/26/20156/29/20156/29/2015APASS
DetailsPhil Shearer
Brian Phone #: ###-####
DOC - Permit Finaled6/29/20156/29/20156/29/2015PPASS
DetailsPhil Shearer
BLD-Final6/25/20156/26/20156/26/2015PCANC
DetailsDave Hannah
Brian Phone #: ###-#### Inspection cancelled from web by: bryan murdoch
Routing PW Grading-Hillside6/26/2015 6/26/2015 PASS
DetailsJim Wyllie
Hillside grading and landscaping are complete. Okay to issue building occupancy. Jim Wyllie / ###-####
BLD-Final6/24/20156/25/20156/25/2015PNR
DetailsPhil Shearer
Doug Phone #: ###-####
BLD-Energy code compliance3/30/20153/31/20153/31/2015APASS
DetailsPhil Shearer
Brian Phone #: ###-####
BLD-Framing/Rough-in3/23/20153/24/20153/24/2015PPASS
DetailsPhil Shearer
Doug Phone #: ###-####
BLD-Wall Bracing3/18/20153/19/20153/19/2015APASS
DetailsPhil Shearer
Shear // Brian Phone #: ###-####
BLD-Foundation12/5/201412/8/201412/8/2014APASS
DetailsPhil Shearer
Eric Phone #: ###-####
BLD-Footing11/6/201411/7/201411/7/2014PPASS
DetailsPhil Shearer
Eric Phone #: ###-####
BLD-Footing11/5/201411/6/201411/6/2014PNR
DetailsPhil Shearer
Eric Phone #: ###-####
PubWorks Subgrade Approval11/3/201411/3/201411/3/2014 DONE
DetailsJason C. Taylor
*FOOTINGS ONLY - NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  10/16/2014  
Application received 10/1/201410/16/2014 DONE
Routing PW Grading-Hillside10/15/2014 10/16/2014 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
PLANS/APPL TAKEN TO FRONT DESK  10/16/2014 DONE
DetailsPerry Paine
Inspection Record Card- Bld  10/16/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  10/16/2014 DONE
DetailsTisha Gallop
Telephone call  10/16/2014 DONE
DetailsTisha Gallop
called Doug Lasher and left vm permit is ready and fee due.
Issue PAID IN FULL permit  10/16/2014 DONE
Plan assigned to (PEP)10/14/201410/14/201410/15/2014 PASS
DetailsPerry Paine
1st review completed  10/15/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/15/2014 DONE
Routing - PLAN CHECK10/15/2014 10/15/2014 PASS
DetailsPerry Paine
Inspection Record Card- Bld  10/15/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (JG) 10/1/201410/14/2014 DEFR
DetailsJavier Guzman
10/17 F L2 Hillside** Routed to Perry
Routing - FIRE10/10/2014 10/13/2014 PASS
DetailsScott Arellano
This structure has been evaluated for Fire Department Vehicle Access. No comments attached to plans.
Routing - Erosion and Sediment10/9/2014 10/10/2014 PASS
DetailsAndy J. Long
ESC plan with site map and narrative approved. Valid RP and PD designated for project. Site prep inspection required.
Routing - MECHANICAL10/9/2014 10/9/2014 PASS
DetailsTroy James
Routing - PLANNING10/6/2014 10/9/2014 PASS
DetailsJoshua Johnson
Route to Impact Fee Review10/1/201410/6/201410/6/2014 PASS
DetailsCindy M. Gould
Routing - Addressing10/1/2014 10/6/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS10/6/2014 10/6/2014 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  10/1/2014 DONE
DetailsChristina Prado
Intake Approval  10/1/2014 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  10/1/2014 DONE
DetailsChristina Prado