Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-02997
StatusFinaled
Name BILTMORE COMPANY
Site Address 6787 W IRVING ST
Project NameAberdeen Place
Customer Number 
ePlanReviewYes
Description
L2B3 - 6787 Irving - (Bldg 8) To construct a new 2,524 sq. ft., two story, Four unit, apartment building. Each unit has one bedroom, one bathroom, and 631 square feet. The 1st story units are required to be Type 'B' units. All units share a common path of egress into and through a 1/2-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00276 & CUP13-00017 Per Planning and Zoning. **SRZ*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/6/20157/2/2015 DONE
This permit finaled on the web by Jeremy Amar
BLD-Final3/27/20153/27/20153/27/2015PPASS
DetailsMike Jordan
Zoning Approval3/27/20153/27/20153/27/2015 PASS
DetailsJosh Wilson
Permanent Occupancy  3/27/2015 DONE
DetailsChristina Prado
BLD-Final3/25/20153/26/20153/26/2015APART
DetailsMike Jordan
Pat Phone #: ###-####. Ok for temp occ. Will be ok for pwerm occ. once zoning signs perm.
BLD-Final3/25/20153/25/20153/25/2015PNR
DetailsMike Jordan
Pat Phone #: ###-####. Needs mech. final. scheduled for tomorrow in the am.
FIRE-Final Inspection3/24/20153/25/20153/25/2015APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection3/24/20153/24/20153/24/2015PFAIL
DetailsTroy Cobbley
Will be ok to final when the project related fire alarm and fire sprinkler permits are finaled.
BLD-Other2/20/20152/20/20152/20/2015PPASS
DetailsMike Jordan
sheet rock // Pat Phone #: ###-####
BLD-Energy code compliance2/17/20152/17/20152/17/2015PPASS
DetailsMike Jordan
Pat Phone #: ###-####
BLD-Framing/Rough-in2/17/20152/17/20152/17/2015PPASS
DetailsMike Jordan
Pat Phone #: ###-####
BLD-Wall Bracing2/17/20152/17/20152/17/2015PPASS
DetailsMike Jordan
Pat Phone #: ###-####
BLD-Framing/Rough-in2/12/20152/13/20152/13/2015AFAIL
DetailsMike Jordan
Pat Phone #: ###-####. Nail off all hangars, provide protection for microwave ducts. fireblock at reuturn air upstairs unit, provide adequate strapping on top plates at line sets. Provide truss engineering. Ok to insulate.
BLD-Wall Bracing2/13/20152/13/20152/13/2015AFAIL
DetailsMike Jordan
Pat Phone #: ###-####. Install all missing floor to floor straps.
BLD-Foundation12/11/201412/12/201412/12/2014PDONE
DetailsMike Jordan
John Phone #: ###-####
BLD-Footing12/10/201412/11/201412/11/2014APART
DetailsMike Jordan
John Phone #: ###-####. Footing completed, need revised footing plan showing 16 inch wide footing.
Print Occupancy Form  11/17/2014 DONE
Issue PAID IN FULL permit  11/14/2014  
Inspection Record Card- Bld  11/14/2014 DONE
OVERRIDE  11/13/2014  
Permit Ready to Issue  11/13/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/10/2014 DONE
DetailsSam Zahorka
Plan assigned to (SRZ)10/8/2014 11/10/2014 PASS
DetailsSam Zahorka
Pending Plumbing to PASS
Routing - PLUMBING11/5/2014 11/7/2014 PASS
DetailsDaryl Spivey
ACCESS TO REMOVE WATER HEATER REQUIRED
Routing - PLAN CHECK10/8/2014 11/5/2014 PASS
DetailsSam Zahorka
Routing - PLANNING Land Div10/8/2014 11/5/2014 PASS
DetailsTodd Tucker
Passed in ePlanReview
Routing - FIRE10/8/2014 10/20/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 10-20-14
Routing - MECHANICAL10/8/2014 10/14/2014 PASS
DetailsTroy James
Route to Impact Fee Review10/8/201410/11/201410/10/2014 PASS
DetailsCindy M. Gould
Routing - PLANNING10/8/2014 10/10/2014 PASS
DetailsJoshua Johnson
Application received  10/8/2014 DONE
Application submitted via PDS Online on Oct 8 2014 12:21AM
Pending Assignment by JCM10/8/2014 10/8/2014 DONE
DetailsJohn Menard
1st review completed  10/8/2014 PASS
DetailsJohn Menard
Routing - Design Review10/8/2014 10/8/2014 PASS
DetailsJosh Wilson
Routing - Addressing10/8/2014 10/8/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/8/2014 10/8/2014 PASS
DetailsBeverly Mountain
per Bev Mountain
Routing - Erosion and Sediment10/8/2014 10/8/2014 PASS
DetailsEvan Jenkins
L2B3-6787 Irving. New Construction of 1 bdrm 4-Plex in Aberdeen
Site Prep Inspection and Approval Required Prior to Earth Disturbance
Routing - PLUMBING10/8/2014 10/8/2014 FAIL
DetailsDaryl Spivey
resubmit legible P-2 plan
Routing PW Sewer Rating10/8/2014 10/8/2014 PASS
DetailsJennifer Bruner