First Notice | | 7/24/2015 | 8/11/2015 | | DONE |
Candy A. Nichols
|
|
|
mailed notice
|
Permanent Occupancy | | | 7/14/2015 | | DONE |
|
|
|
|
Zoning Approval | 6/30/2015 | 6/30/2015 | 6/30/2015 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Final | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice,, temp ok
|
BLD-Final | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice
|
Temporary Occupancy | 6/23/2015 | 9/21/2015 | 6/23/2015 | | DONE |
Brittany Hill
|
|
|
|
Zoning Approval Temp | 6/23/2015 | 6/23/2015 | 6/23/2015 | | DONE |
Matthew A Halitsky
|
|
|
30-day temp w/ bond.
|
BLD-Final | 6/22/2015 | 6/22/2015 | 6/22/2015 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice,, need trades/ zoning
|
FIRE-Final Inspection | 6/22/2015 | 6/22/2015 | 6/22/2015 | A | PASS |
Katie Marron
|
|
|
Fire life safety pass. Contractor to supply carbon monoxide detector for hallway outlet outside sleeping rooms, prior to building official final.
|
BLD-Final | 6/18/2015 | 6/22/2015 | 6/22/2015 | A | CANC |
Tony Young
|
|
|
>> Inspection requested via web by Mark Brice Inspection cancelled from web by: Mark Brice
|
PubWorks Occupancy Approval | 6/22/2015 | 6/22/2015 | 6/22/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 6/17/2015 | 6/19/2015 | 6/19/2015 | | FAIL |
Matthew A Halitsky
|
|
|
Rooftop screening not installed.
|
BLD-Energy code compliance | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice
|
BLD-Wall cover | 4/6/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice
|
BLD-Framing/Rough-in | 3/25/2015 | 3/26/2015 | 3/26/2015 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice,, need to get trades fully signed off but ok to insulate
|
BLD-Wall Bracing | 3/18/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Brice,, exterior ok
|
BLD-Footing | 1/13/2015 | 1/14/2015 | 1/14/2015 | P | PASS |
Jim Storey
|
|
|
Interior thickened slab footing Phone #: ###-#### Inspection requested via web by Mark Brice bar and v berrior ok
|
BLD-Foundation | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | PASS |
Tony Young
|
|
|
We would like to pour at 2:30pm Thanks Phone #: ###-#### Inspection requested via web by Mark Brice
|
BLD-Footing | 1/6/2015 | 1/7/2015 | 1/7/2015 | P | PASS |
Phil Shearer
|
|
|
We would like to pour at 2pm and should be ready by noon Phone #: ###-#### Inspection requested via web by Mark Brice
|
(F) Reprint permit | | | 12/16/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 12/12/2014 | | |
|
|
|
|
Print Occupancy Form | | | 12/12/2014 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 12/12/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 12/12/2014 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2014 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 10/22/2014 | | 12/10/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed renovation additiona paramedic station
|
Routing PW Sewer Design | 12/8/2014 | | 12/8/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Design | 11/25/2014 | | 12/3/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Sheet C2.0 not updated per 10/8 comments
|
Routing - PLAN CHECK | 11/25/2014 | | 12/2/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 11/25/2014 | | 12/2/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 10/24/2014 | | 11/21/2014 | | PASS |
Beverly Mountain
|
|
|
see e plan for Bev M sign off
|
Routing - PLAN CHECK | 10/22/2014 | | 11/21/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING Land Div | 10/22/2014 | | 11/21/2014 | | PASS |
Dave Abo
|
|
|
see e plan for Dave A Sign off
|
1st review completed | | | 11/21/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 10/22/2014 | | 11/6/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Structural review comments attached to case.
|
Routing PW Drainage | 10/24/2014 | | 11/5/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 10/22/2014 | | 11/4/2014 | | PASS |
Matthew A Halitsky
|
|
|
|
Routing PW Sewer Design | 10/24/2014 | | 10/30/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Contact Boise Public Works 48 Hours prior to disconnecting sewer service to schedule an inspection and obtain a sewer plug permit. Install water tight sewer plug at the main.
Install new sewer service per ISPWC SD-511, Type A,B, or D. Contact Boise Public Works 48 hours prior to new sewer connection to schedule inspection and obtain sewer tap permit.
Install casing around sewer service through drainage bed. Casing shall be steel, fused PVC, or HDPE pipe. Size casing and install calpico spacers per manufacturer recommenations.
|
Routing - FIRE | 10/22/2014 | | 10/27/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 10-27-14
|
Routing PW Environmental | 10/24/2014 | | 10/24/2014 | | PASS |
Rick Christenson
|
|
|
|
Routing - PUBLIC WORKS | 10/22/2014 | | 10/24/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 10/22/2014 | | 10/23/2014 | | PASS |
Evan Jenkins
|
|
|
SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE:
Renovation and addition to existing 2136 sf Paramedic Station, total area with addition 2224 sf.Includes replacement of existing brick, replacement of all site improvements, all new finishes and systems.
|
Routing - PLUMBING | 10/22/2014 | | 10/23/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 10/22/2014 | | 10/23/2014 | | PASS |
David Moser
|
|
|
|
Intake Approval | | | 10/22/2014 | | PASS |
John Menard
|
|
|
|
Application received | | | 10/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2014 9:30PM
|
Pending Assignment by JCM | 10/22/2014 | | | | |
John Menard
|
|
|
|