BLD-Final | 11/10/2014 | 11/12/2014 | 11/12/2014 | A | DONE |
Mike Jordan
|
|
|
Emmett Phone #: ###-####-call for access
|
DOC - Permit Finaled | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Mike Jordan
|
|
|
Final for a unconditioned sun room. Noted that the majority of this project was built prior to obtaining building permits. Foundation system was not inspected by boise city, therfore can not be verified at this time.
|
BLD-Framing/Rough-in | 10/20/2014 | 10/20/2014 | 10/20/2014 | P | PASS |
Mike Jordan
|
|
|
Emmett Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2014 | 10/17/2014 | 10/17/2014 | P | FAIL |
Mike Jordan
|
|
|
late as possible, please call ahead coming from Nampa - Emmett Phone #: ###-####
|
Override - Parcel Holds | 10/16/2014 | 1/1/1900 | 10/16/2014 | | |
|
|
|
framing
|
Routing Walk-In (Zoning) | 10/10/2014 | 10/10/2014 | 10/10/2014 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/10/2014 | 10/10/2014 | 10/10/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 10/10/2014 | 10/10/2014 | 10/10/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2014 | | |
|
|
|
|
1st review completed | | | 10/10/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2014 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/10/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 10/10/2014 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 10/10/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/10/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 10/10/2014 | | | |
|
|
|
|