Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD14-03039
StatusFinaled
Name BOWMANS INC. OF MOUNTAIN HOME
Site Address 1510 N 13TH ST
Project NameHyde Park Historic Remodel
Customer Number 
ePlanReviewNo
Description
(HYDE PARK HISTORIC RENOVATION – SHELL COMPLETION) (11-19-18 PLAN MODIFICATION TO REMOVE THE STAIRWAY ENCLOSURE BETWEEN THE 1ST STORY AND THE BASEMENT AND TO REMOVE PLUMBING FIXTURES ON THE 1ST STORY AND IN THE BASEMENT). The fire sprinkler system is used for story increase and for occupancy. To complete the shell work that was started under expired permit BLD05-00128. The existing work was inspected and approved under that permit, even though that permit was later expired. Work is to include guards, handrails, and completing work originally approved under permit BLD05-00128. This permit does not establish a Certificate of Occupancy for any tenant. Each tenant, including the 2nd story dwelling unit, is required to apply for and to be issued a separate permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Separate electrical, plumbing, and mechanical permits are required. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/20/20198/5/2019 DONE
mailed 8-5-2019
First Notice6/10/20196/10/20197/10/2019 DONE
DetailsTony Young
mailed 7-11
BLD-Aging Inspection6/6/20196/6/20196/11/2019 DONE
DetailsTony Young
BLD-Aging Inspection6/5/20196/5/20196/10/2019 DONE
DetailsTony Young
DOC - Permit Finaled6/10/20196/10/20196/10/2019PPASS
DetailsTony Young
Plan Reviewer's activity  3/7/2019 DONE
Drawings taken to Records
BLD-Final1/22/20191/23/20191/22/2019APASS
DetailsDave Hannah
Antonio Phone #: ###-#### call first
Extend Permit 90/180 days1/17/20191/22/20191/22/2019ACANC
DetailsDave Hannah
Antonio Phone #: ###-#### call first
BLD-Final1/16/20191/17/20191/17/2019ADEFR
DetailsDave Hannah
Antonio Phone #: ###-#### talked with antonio hes ok with waiting for tony
FIRE-Final Inspection1/10/20191/16/20191/16/2019APASS
DetailsJim Page
Fire sprinkler inspection for core and shell complete, final fire alarm inspection for core and shell complete, fire extinguishers are placed with current inspection tags, knox box is located by front entry. Final life fire safety inspection for core and shell complete, no occupancy allowed under this permit, a seperate permit will be required for tenant occupancy.

Antonio Phone #: ###-####
Zoning Approval1/11/20191/11/20191/11/2019 DONE
DetailsTed Vanegas
Permit Ready to Issue  11/20/2018 DONE
PLAN MOD please do not re issue
no change in valuations see plan mod app for cert of val
Telephone call  11/20/2018 DONE
called Larry Sundell ###-#### to let know plan mod is ready
Inspection Record Card- Bld  11/20/2018 DONE
CHANGE STATUS TO (ISS)  11/20/2018 DONE
plan mod
Plan assigned to (CJW)11/13/201811/13/201811/19/2018 PASS
DetailsCarl Westfall
plan mod - Hyde Park - 11-19-18 routed to PW
Routing - PLAN CHECK11/13/2018 11/19/2018 PASS
DetailsCarl Westfall
Routing PW Sewer Rating11/19/2018 11/19/2018 PASS
DetailsAngela Hardy
REMOVED TWO WATER CLOSETS AND 1 LAV. CREDITS AVAILABLE.
PLANS/APPL TAKEN TO FRONT DESK  11/19/2018 DONE
Plan Modification Accepted  11/13/2018 DONE
Plan modification to remove basement and 1st floor walls and doors at stairway enclosure. Remove (1) basement water closet and door.
BLD-Conference10/15/201810/16/201810/16/2018APART
DetailsTony Young
Chris-please call 30 minutes prior to meet for access Phone #: ###-####,, hand and guard rail ?s
BLD - Request for Extension10/1/201810/2/201810/2/2018APEND
DetailsTony Young
request to extend exp date so can complete project // Not need site visit
BLD-Conference8/15/20188/16/20188/16/2018APART
DetailsTony Young
Call Larry Sundell to set up time to meet ###-####. Wants to walk through project with you.,, needs trades,, hand rails,, etc
BLD-Conference8/10/20188/15/20188/16/2018PPART
DetailsTony Young
Call Larry Sundell to set up time to meet ###-####. Wants to walk through project with you.
BLD-Conference8/8/20188/8/20188/8/2018PCANC
DetailsTony Young
Call Larry Sundell to meet to see what neeed to finish project ###-#### ***CANC PER LARRY***
BLD-Aging Inspection5/14/20185/15/20185/15/2018AFAIL
DetailsTony Young
should this one be expired
DOC - Permit Expired5/15/20185/15/20185/15/2018PCANC
DetailsTony Young
should this one be expired.. yes,, no work going on
BLD-Aging Inspection1/5/20171/5/20171/11/2017 PEND
DetailsTony Young
BLD-Aging Inspection1/4/20171/4/20171/11/2017 PEND
DetailsTony Young
FIRE-Final Inspection8/22/20168/23/20168/23/2016APART
DetailsJim Page
Spoke with point of contact, Jay Phone #: ###-####, discussed location for fire alarm document cabinet in fire sprinkler riser room. Jay is requesting a partial final for exterior life fire safety, property has an active fire sprinkler system, property has an active fire panel, final inspection is for exterior no fire extinguishers are required for exterior. Temporary construction fencing in place at time of inspection which cannot stay in place when property is occupied. When building becomes occupied the fencing needs to be removed or a gate with impact/single action hardware will need to be installed. Partial fire life safety final inspection for exterior passed/complete
BLD-Conference7/1/20167/5/20167/5/2016APART
DetailsTony Young
Jay Phone #: ###-####,, floor/ ceiling penetrations ok,, shell ok pending other trades
BLD-Other6/17/20166/20/20166/21/2016APART
DetailsTony Young
Jay Phone #: ###-####,, follow up,, add collars to bigger pipes,, fire caulk around all penetrations
BLD-Conference6/14/20166/17/20166/17/2016APART
DetailsTony Young
Jay Phone #: ###-####,, follow up,, working on floor/ceiling penetrations
BLD-Conference6/13/20166/14/20166/14/2016APEND
DetailsTony Young
Jay Phone #: ###-####
BLD-Conference6/13/20166/13/20166/13/2016PDEFR
DetailsTony Young
Jay Phone #: ###-####,, wanted a am inspection
BLD-Final6/8/20166/13/20166/13/2016ACANC
DetailsDave Hannah
Jay-as per Jay inspection is for concrete fillings on top floor Phone #: ###-####
BLD-Aging Inspection1/19/20161/19/20161/21/2016 PEND
DetailsTony Young
BLD-Aging Inspection1/18/20161/18/20161/21/2016 PEND
DetailsTony Young
BLD-Conference11/20/201511/23/201511/23/2015APEND
DetailsTony Young
would like call ahead; Jay Phone #: ###-####,, final on shell
BLD-Conference11/18/201511/19/201511/20/2015PDEFR
DetailsTony Young
would like call ahead; Jay Phone #: ###-####,, final on shell
BLD-Conference11/17/201511/18/201511/18/2015APEND
DetailsTony Young
would like call ahead; Jay Phone #: ###-####,, final on shell
BLD-Conference11/16/201511/17/201511/17/2015ADEFR
DetailsTony Young
would like call ahead; Jay Phone #: ###-####,, final on shell
BLD-Conference11/16/201511/16/201511/16/2015PPEND
DetailsTony Young
would like call ahead; Jay Phone #: ###-####,, final on shell,, exterior looking ok,, will do research on final from others
BLD-Final11/13/201511/16/201511/16/2015PPEND
DetailsTony Young
would like call ahead; Jay Phone #: ###-####
BLD-Final11/12/201511/13/201511/13/2015ANR
DetailsDave Hannah
Jay Phone #: ###-####
FIRE-Final Inspection11/12/201511/12/201511/12/2015PCANC
DetailsJim Page
Inspection not for this permit number, inspection was for FIR14-00912, items still need to be addressed before inspection can be performed. Jay will reschedule inspection when items are repaired for the fire sprinkler system.
BLD-Conference11/10/201511/12/201511/12/2015ACANC
DetailsTony Young
Jay Phone #: ###-#### needed a firelife saftey not a conference
FIRE-Conference10/12/201510/12/201510/12/2015PDONE
DetailsJim Page
Fire conference complete
BLD-Conference10/8/201510/9/201510/9/2015APASS
DetailsTony Young
Jay Phone #: ###-####,, ?s on shell
Case Summary (BLD)  8/7/2015 DONE
BLD-Conference7/31/20157/31/20157/31/2015PPART
DetailsTony Young
Jay Phone #: ###-####,, meet with 325,, 2 pm,,
walk through,, had the office get a MIS permit,, and schedule all trades out ther next thursday @ 2,, 8/6/2015
BLD-Conference7/30/20157/31/20157/31/2015ADEFR
DetailsTony Young
Jay Phone #: ###-####,, meet with 325,, to 2 pm
BLD-Conference7/30/20157/31/20157/31/2015APART
DetailsBob Archibald
Jay Phone #: ###-####,, meet with 415,, late am. Conference on requirements for shell only. need TI permits for interior .
BLD-Conference7/30/20157/30/20157/30/2015PPEND
DetailsTony Young
Jay Phone #: ###-####,, walk through only,, need to meet with 325
Issue PAID IN FULL permit  3/5/2015 DONE
Inspection Record Card- Bld  2/26/2015 DONE
Permit Ready to Issue  2/26/2015 DONE
Need GC and Revised Value
Telephone call  2/26/2015 DONE
DetailsCandy A. Nichols
called Larry to let know permit is ready and that we need the GC and rev cert of val
Plan assigned to (CJW)10/16/201410/16/20142/25/2015 PASS
DetailsCarl Westfall
HYDE PARK HISTORIC RENOVATION - SHELL COMPLETIONG - Level 3 TI - Paper (15 days - Nov 3) (1st review done)
Routing - PLAN CHECK2/11/2015 2/25/2015 PASS
DetailsCarl Westfall
2nd review approved
PLANS/APPL TAKEN TO FRONT DESK  2/25/2015 DONE
Plan resubmittals received  2/11/2015 DONE
I received 3 copies of sheets One A, Three A, Ten, and eleven-also received one copy of response letter to review and letter from Tim Frost- gave to Carl Westfall
Routing - PLAN CHECK11/7/2014 2/11/2015  
Waiting for a response from the Architect
Meeting  11/17/2014 DONE
Jason Blais and Carl Westfall met on site with Larry Sundell to discuss options for code compliance
1st review completed  11/7/2014 DONE
Failed; Plan Check
Routing - FIRE11/5/2014 11/7/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 11-07-14
Routing - PLAN CHECK10/22/2014 11/5/2014 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - Design Review10/20/2014 10/22/2014 PASS
DetailsMatthew A Halitsky
No changes to expired permit.
Routing - PUBLIC WORKS10/16/2014 10/20/2014 PASS
DetailsJennifer Bruner
Routing - PLUMBING10/20/2014 10/20/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing PW Environmental10/17/2014 10/20/2014 PASS
Confirm Connection to Grease generating Fixtures.
Routing PW Sewer Rating10/17/2014 10/17/2014 PASS
DetailsJennifer Bruner
Sewer fees to be assessed when T.I. submitted.
Routing - Addressing10/16/2014 10/16/2014 PASS
DetailsJason C. Taylor
Pending Assignment by JCB10/14/2014 10/16/2014 DONE
DetailsJason Blais
Application received 10/14/201410/14/2014 DONE
Plans ACCEPTED BY PLAN TECH  10/14/2014 DONE
Recd Pcfee & Taken To Pln CK  10/14/2014 DONE
Intake Approval  10/14/2014 PASS