Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03060
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 3462 E PARSNIP PEAK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone B, Class A Roof, Permit for the construction of a new 3082 sq. ft., one story single family dwelling with 3 bedrooms, 3 bathrooms, approximately 388 sq. ft. of covered patio/porch, ft., and a 961 sq. ft. attached garage per the approved plans, plan review report and any notations. C-4D/DA zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. CHD/DA with R-1C setbacks ok per Sue Cummings. All per the approved plans as marked, REScheck, engineering calculations, ACCA report along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/15/20155/18/20155/18/2015APASS
DetailsPhil Shearer
Dave Phone #: ###-####
DOC - Permit Finaled5/18/20155/18/20155/18/2015PPASS
DetailsPhil Shearer
BLD-Final5/8/20155/11/20155/11/2015APART
DetailsPhil Shearer
Dave Phone #: ###-#### OK for temporary C.O.
BLD-Final4/28/20154/29/20154/29/2015PFAIL
DetailsPhil Shearer
Dave Phone #: ###-#### Need fier caulking in utility room and ralling on back patio CN posted
BLD-Energy code compliance1/22/20151/23/20151/23/2015APASS
DetailsPhil Shearer
insulation // ###-#### Adam
BLD-Framing/Rough-in1/19/20151/20/20151/20/2015APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Evans Evans
BLD-Wall Bracing1/20/20151/20/20151/20/2015PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Evans Evans
BLD-Framing/Rough-in1/15/20151/16/20151/16/2015AFAIL
DetailsPhil Shearer
Adam Phone #: ###-#### Header over back patio needs to be 3ply not 2ply per plans. Need air seal.
BLD-Wall Bracing1/16/20151/16/20151/16/2015PFAIL
DetailsPhil Shearer
Adam Phone #: ###-####
Plan Modification Accepted  1/8/2015 DONE
new manual j
Routing - MECHANICAL1/8/2015 1/8/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation11/10/201411/12/201411/12/2014APASS
DetailsPhil Shearer
Matt Phone #: ###-####
BLD-Foundation11/7/201411/10/201411/10/2014PNR
DetailsPhil Shearer
Matt Phone #: ###-####
PubWorks Subgrade Approval11/10/201411/10/201411/10/2014 DONE
DetailsJason C. Taylor
* FOOTINGS AND CRAWL SPACE PADS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing11/6/201411/7/201411/7/2014APASS
DetailsPhil Shearer
Matt Phone #: ###-####
BLD-Footing11/5/201411/6/201411/6/2014PNR
DetailsPhil Shearer
Matt Phone #: ###-####
Issue PAID IN FULL permit  10/27/2014 DONE
DetailsChristina Prado
OVERRIDE  10/24/2014  
Plan assigned to (PEP)10/24/201410/24/201410/24/2014 PASS
DetailsPerry Paine
Plan assigned to (JG)10/15/201410/15/201410/24/2014 DEFR
DetailsJavier Guzman
10/27 M L1* to pep 10-24-2014
Routing - PLAN CHECK10/23/2014 10/24/2014 PASS
DetailsPerry Paine
1st review completed  10/24/2014  
PLANS/APPL TAKEN TO FRONT DESK  10/24/2014 DONE
Inspection Record Card- Bld  10/24/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  10/24/2014 DONE
DetailsTisha Gallop
Telephone call  10/24/2014 DONE
called Ben Evans and left vm permit is ready and fee due
Routing - MECHANICAL10/24/2014 10/24/2014 PASS
DetailsTroy James
Routing - MECHANICAL10/17/2014 10/23/2014 FAIL
DetailsTroy James
emailed corrections to ultimate heating
Routing - PLANNING10/16/2014 10/17/2014 PASS
DetailsSue Cummings
Driveway cannot exceed 30 ft. in width in front setback.
Routing PW Grading-Hillside10/16/2014 10/16/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Plan resubmittals requested  10/16/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked 1 of 6 & 3 of 6;Plans stamped and taken to Javier for review
Routing - Addressing10/15/2014 10/16/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  10/16/2014 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  10/15/2014 DONE
DetailsCandy A. Nichols
Intake Approval  10/15/2014 PASS
DetailsCandy A. Nichols
asked Ben to email me the building section
Recd Pcfee & Taken To Pln CK  10/15/2014 DONE
DetailsCandy A. Nichols
Application received 10/15/2014