BLD-Final | 5/15/2015 | 5/18/2015 | 5/18/2015 | A | PASS |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
DOC - Permit Finaled | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 5/8/2015 | 5/11/2015 | 5/11/2015 | A | PART |
Phil Shearer
|
|
|
Dave Phone #: ###-#### OK for temporary C.O.
|
BLD-Final | 4/28/2015 | 4/29/2015 | 4/29/2015 | P | FAIL |
Phil Shearer
|
|
|
Dave Phone #: ###-#### Need fier caulking in utility room and ralling on back patio CN posted
|
BLD-Energy code compliance | 1/22/2015 | 1/23/2015 | 1/23/2015 | A | PASS |
Phil Shearer
|
|
|
insulation // ###-#### Adam
|
BLD-Framing/Rough-in | 1/19/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Evans Evans
|
BLD-Wall Bracing | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Evans Evans
|
BLD-Framing/Rough-in | 1/15/2015 | 1/16/2015 | 1/16/2015 | A | FAIL |
Phil Shearer
|
|
|
Adam Phone #: ###-#### Header over back patio needs to be 3ply not 2ply per plans. Need air seal.
|
BLD-Wall Bracing | 1/16/2015 | 1/16/2015 | 1/16/2015 | P | FAIL |
Phil Shearer
|
|
|
Adam Phone #: ###-####
|
Plan Modification Accepted | | | 1/8/2015 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 1/8/2015 | | 1/8/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 11/10/2014 | 11/12/2014 | 11/12/2014 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 11/7/2014 | 11/10/2014 | 11/10/2014 | P | NR |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
PubWorks Subgrade Approval | 11/10/2014 | 11/10/2014 | 11/10/2014 | | DONE |
Jason C. Taylor
|
|
|
* FOOTINGS AND CRAWL SPACE PADS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/6/2014 | 11/7/2014 | 11/7/2014 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 11/5/2014 | 11/6/2014 | 11/6/2014 | P | NR |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/27/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 10/24/2014 | | |
|
|
|
|
Plan assigned to (PEP) | 10/24/2014 | 10/24/2014 | 10/24/2014 | | PASS |
Perry Paine
|
|
|
|
Plan assigned to (JG) | 10/15/2014 | 10/15/2014 | 10/24/2014 | | DEFR |
Javier Guzman
|
|
|
10/27 M L1* to pep 10-24-2014
|
Routing - PLAN CHECK | 10/23/2014 | | 10/24/2014 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 10/24/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Permit Ready to Issue | | | 10/24/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/24/2014 | | DONE |
|
|
|
called Ben Evans and left vm permit is ready and fee due
|
Routing - MECHANICAL | 10/24/2014 | | 10/24/2014 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 10/17/2014 | | 10/23/2014 | | FAIL |
Troy James
|
|
|
emailed corrections to ultimate heating
|
Routing - PLANNING | 10/16/2014 | | 10/17/2014 | | PASS |
Sue Cummings
|
|
|
Driveway cannot exceed 30 ft. in width in front setback.
|
Routing PW Grading-Hillside | 10/16/2014 | | 10/16/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan resubmittals requested | | | 10/16/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked 1 of 6 & 3 of 6;Plans stamped and taken to Javier for review
|
Routing - Addressing | 10/15/2014 | | 10/16/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 10/16/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 10/15/2014 | | PASS |
Candy A. Nichols
|
|
|
asked Ben to email me the building section
|
Recd Pcfee & Taken To Pln CK | | | 10/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 10/15/2014 | | | |
|
|
|
|