(F) Reprint permit | | | 2/10/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/10/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/10/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/10/2017 | | DONE |
|
|
|
|
Telephone call | | | 2/9/2017 | | DONE |
|
|
|
called Kevin ###-####-fees need paid then we can re issue the corrected c of o's for both permits BLD14-03070 & BLD14-03071
|
BLD-Final | 12/29/2016 | 12/30/2016 | 12/30/2016 | P | PASS |
Jim Sly
|
|
|
Cody Phone #: ###-####
|
FIRE-Final Inspection | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 12/30/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/23/2016 | 12/23/2016 | 12/23/2016 | P | PART |
Troy Cobbley
|
|
|
Life safety passed in apartments 107, 108, 207, 208, 307 and 308. Waiting on the corrected as-builts for the fire sprinkler system prior to a final sign off.
|
FIRE-Final Inspection | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PART |
Troy Cobbley
|
|
|
Life safety passed for apartments 105, 106, 205, 206, 305 and 306
|
Temporary Occupancy | 12/14/2016 | 3/14/2017 | 12/14/2016 | | DONE |
Candy A. Nichols
|
|
|
as per Mike Jordan Ok for
Temp C of O for units 103,104,203,204,303,304 only.
|
Temporary Occupancy | 12/14/2016 | 3/14/2017 | 12/14/2016 | | DONE |
Candy A. Nichols
|
|
|
Ok for Temp C of O for units 103,104,203,204,303,304 only.
|
BLD-Final | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | PART |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Ok for
Temp C of O for units 103,104,203,204,303,304 only.
|
FIRE-Final Inspection | 12/9/2016 | 12/12/2016 | 12/12/2016 | A | PART |
Troy Cobbley
|
|
|
Life safety passed for apartments 103, 104, 203, 204, 303, 304
|
FIRE-Final Inspection | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | CANC |
Jim Page
|
|
|
Inspection request rescheduled.
|
BLD-Final | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PART |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Ok to occupy units 101,102,201,202,301,302 only.
|
Temporary Occupancy | 12/2/2016 | 3/2/2017 | 12/2/2016 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Final Inspection | 11/23/2016 | 11/29/2016 | 11/29/2016 | A | PART |
Troy Cobbley
|
|
|
Life safety passed only for apartments 101, 102, 201, 202, 301, 302.
|
Zoning Approval | 11/22/2016 | 11/22/2016 | 11/22/2016 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire sprinkler and and fire alarm permits addressed prior to an inspection.
|
BLD-Wall cover | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Hat channel, 1st and 2nd. floors, north units ok.
|
BLD-Wall Bracing | 10/14/2016 | 10/17/2016 | 10/17/2016 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Hat channel ok.
|
BLD-Wall cover | 10/13/2016 | 10/14/2016 | 10/14/2016 | A | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. 2nd. floor, hat channel, central corridor, north units.
|
BLD-Framing/Rough-in | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Hat channel, 1st floor center units, north side.
|
BLD-Energy code compliance | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Mike Jordan
|
|
|
1st, 2nd. floors north units ok.
|
BLD-Energy code compliance | 10/7/2016 | 10/10/2016 | 10/10/2016 | A | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. 1st,2nd and 3rd floors, central corridor, north half. 3rd. floor north end units ok.
|
BLD-Framing/Rough-in | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Mike Jordan
|
|
|
cody Phone #: ###-####. All framing issues resolved on 1st., 2nd., and 3rd. floors north half of building. Ok to insulate.
|
BLD-Wall cover | 10/5/2016 | 10/5/2016 | 10/5/2016 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. 1st. floor hat channel ok.
|
PubWorks Occupancy Approval | 10/5/2016 | 10/5/2016 | 10/5/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | FAIL |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Complete all firestopping, fireblocking. Block and nail off all interior shear walls. Provide UL listed washer box. Provide 2 layers 5/8 type x rock on 1hr. horizontal floor ceiling assembly aboce furnace in ADA apartment.
|
BLD-Wall cover | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | PASS |
Mike Jordan
|
|
|
Cody// 2nd floor Phone #: ###-####
|
BLD-Wall cover | 9/26/2016 | 9/28/2016 | 9/28/2016 | P | PASS |
Mike Jordan
|
|
|
Dry wall // Cody Phone #: ###-####. Unites 107,108,207 and 208.
|
BLD-Energy code compliance | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Dave Hannah
|
|
|
Cody Phone #: ###-#### units 103 104 203 204 303 and 304 ok to cover
|
BLD-Energy code compliance | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. 1st, 2nd, 3rd. floor sother most six units.
|
BLD-Framing/Rough-in | 9/19/2016 | 9/20/2016 | 9/20/2016 | A | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Ok to isulate 1st, 2nd. and 3rd floors, south half only.
|
BLD-Framing/Rough-in | 9/16/2016 | 9/19/2016 | 9/19/2016 | A | FAIL |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | FAIL |
Mike Jordan
|
|
|
Cody Phone #: ###-####. See corrections list.
|
BLD-Wall Bracing | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PASS |
Mike Jordan
|
|
|
Shear // Cody Phone #: ###-####
|
BLD-Wall cover | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####, SOuth units, 2nd floor fur downs.
|
BLD-Wall Bracing | 8/25/2016 | 8/25/2016 | 8/26/2016 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Ok to rock corridors.
|
BLD-Other | 8/23/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Mike Jordan
|
|
|
RC1 channel; Tony Phone #: ###-####
|
BLD-Other | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | CANC |
Mike Jordan
|
|
|
Cody-wall bracing Phone #: ###-####
|
BLD-Wall Bracing | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | FAIL |
Mike Jordan
|
|
|
Cody-wall bracing Phone #: ###-####. Missing floor to floor straps and hold downs. Also missing several areas on exterior and interior shear.
|
PubWorks Temp Occupancy Appr | 8/9/2016 | 8/9/2016 | 8/9/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Wall cover | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Mike Jordan
|
|
|
Shear // Pat Phone #: ###-####. south half crawl space.
|
BLD-Wall Bracing | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####. 2nd. floor exterior shear, north building.
|
BLD-Foundation | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Wall bracing and holdowns in crawl space.
|
BLD-Foundation | 2/24/2016 | 2/25/2016 | 2/25/2016 | A | NR |
Mike Jordan
|
|
|
Manul Phone #: ###-####. Contractor not ready.
|
BLD-Footing | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
Routing PW Drainage | 10/12/2015 | | 10/16/2015 | | PASS |
Brian Murphy
|
|
|
Approved in eplan review as "No Review Required" by BGM. TLW
|
CHANGE STATUS TO (ISS) | | | 10/16/2015 | | DONE |
|
|
|
per TLW no plan mod required- no fees due
|
Plan assigned to (TLW) | 10/6/2015 | | 10/16/2015 | | PASS |
Tim L. Woodard
|
|
|
Plan Mod
|
Routing - PUBLIC WORKS | 10/8/2015 | | 10/12/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 10/8/2015 | | 10/9/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 10/8/2015 | | 10/8/2015 | | PASS |
Tim L. Woodard
|
|
|
No architectural changes. Routed Plan Mod to DR and Drainage.
|
Plan Modification Accepted | | | 10/6/2015 | | DONE |
Christina Prado
|
|
|
Plan modification requiest by David Ruby to submit revised plans for an unexpected water main location. Plan mod to shift an underground seepage bed slightly to deal with a United Water water main location, mvoing a few bushes and trees in the process
|
Issue PAID IN FULL permit | | | 10/5/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/5/2015 | | DONE |
|
|
|
|
Extend Review Timeline | | | 9/30/2015 | | DONE |
|
|
|
Final 180 days granted by JCB. See attached document
|
Expiration Notice | 9/16/2015 | 10/7/2015 | 9/16/2015 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 3/30/2015 | | DONE |
|
|
|
1st 180 days granted by JCB see attached documents
|
Expiration Notice | 3/24/2015 | 4/14/2015 | 3/24/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 1/30/2015 | | |
|
|
|
|
Plan assigned to (JCM) | 1/30/2015 | | 1/30/2015 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 1/30/2015 | | 1/30/2015 | | PASS |
John Menard
|
|
|
ACHD civil plan modification - no review required. JCM
|
Routing - PUBLIC WORKS | 1/30/2015 | | 1/30/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 1/30/2015 | | 1/30/2015 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2015 | | DONE |
John Menard
|
|
|
|
Permit Ready to Issue | | | 1/30/2015 | | DONE |
Candy A. Nichols
|
|
|
need RP, GC & rev cert of val, issue even though there's a date in there already
|
Plan Modification Accepted | | | 1/29/2015 | | DONE |
Christina Prado
|
|
|
Requested opportunity to upload revisions to Civil drawings as requisted by ACHD
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2014 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 10/20/2014 | | 12/8/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 10/31/2014
|
Routing - PLAN CHECK | 12/1/2014 | | 12/8/2014 | | PASS |
John Menard
|
|
|
|
Routing PW Street Lights | 12/1/2014 | | 12/5/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - PUBLIC WORKS | 12/1/2014 | | 12/1/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 11/17/2014 | | 11/24/2014 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 11/17/2014 | | 11/21/2014 | | PASS |
John Menard
|
|
|
|
Routing - MECHANICAL | 11/17/2014 | | 11/20/2014 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 11/17/2014 | | 11/18/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - PUBLIC WORKS | 11/17/2014 | | 11/17/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing Off Site - STRUCTURAL | 11/7/2014 | | 11/14/2014 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 11/7/2014 | | 11/14/2014 | | PASS |
John Menard
|
|
|
|
Routing - MECHANICAL | 11/7/2014 | | 11/13/2014 | | FAIL |
Troy James
|
|
|
Talked Bob Tikker on phone. Still need allowable duct lenght from dryer manufacturer.
|
Routing - PUBLIC WORKS | 11/7/2014 | | 11/10/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - FIRE | 11/7/2014 | | 11/10/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 11-10-14
|
Routing PW Sewer Design | 11/7/2014 | | 11/10/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 11/7/2014 | | 11/10/2014 | | FAIL |
Mike D Hedge
|
|
|
Need to change ground wire size form #10 to #6 copper on electrical site plan.
|
Routing - Design Review | 11/7/2014 | | 11/10/2014 | | PASS |
Josh Wilson
|
|
|
Revised elevations comply with Design Review approval.
|
Route to Impact Fee Review | 10/31/2014 | 11/3/2014 | 11/5/2014 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 10/31/2014 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/20/2014 | | 10/31/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Sewer Design | 10/30/2014 | | 10/30/2014 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Connect to sewer main using type A,B, or D service connection per ISPWC SD 511. Contact Boise Public Works 48 Hours prior to sewer work in Public R/W to schedule inspection and obtain sewer tap permit. Replace sewer notes with current Boise City Standard Sewer Notes. Current notes are available on www.cityofboise.org.
|
Routing - MECHANICAL | 10/20/2014 | | 10/29/2014 | | FAIL |
Troy James
|
|
|
Talked to bob tikker to provide load calcs.
|
Routing - PLAN CHECK | 10/20/2014 | | 10/27/2014 | | PASS |
John Menard
|
|
|
Approved with redlined conditions. JCM
|
Routing - FIRE | 10/20/2014 | | 10/24/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 10-24-14
|
Routing - PLANNING | 10/20/2014 | | 10/23/2014 | | PASS |
Sue Cummings
|
|
|
|
Routing PW Drainage | 10/20/2014 | | 10/23/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 10/20/2014 | | 10/21/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Street Lights | 10/20/2014 | | 10/21/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - Design Review | 10/20/2014 | | 10/21/2014 | | FAIL |
Josh Wilson
|
|
|
Elevations do not match those approved with DRH12-00143. Submit revised elevations or apply for a modification to DRH12-00143.
|
Routing - PLUMBING | 10/20/2014 | | 10/21/2014 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - PLANNING Land Div | 10/20/2014 | | 10/20/2014 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 10/20/2014 | | 10/20/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/20/2014 | | 10/20/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 10/20/2014 | | 10/20/2014 | | PASS |
Evan Jenkins
|
|
|
Palisades Apartments - Building A - 23 unit multi-family, three story apartment building with mechanical, electrical, plumbing and related site work.
SITE PREP INSPECTION REQUIRED W/ APPROVAL PRIOR TO EARTH DISTURBANCE
|
Intake Approval | | | 10/20/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 10/20/2014 | | 10/20/2014 | | DONE |
John Menard
|
|
|
|
Routing PW Sewer Rating | 10/20/2014 | | 10/20/2014 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | | 10/16/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 16 2014 9:05AM
|
Intake Approval | | | 10/16/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see change marks 1-4 on check list.
|
First Notice | | 2/20/2017 | | | |
|
|
|
|
First Notice | | 2/20/2017 | | | |
|
|
|
|
First Notice | | 2/20/2017 | | | |
|
|
|
|
First Notice | | 1/9/2017 | | | |
|
|
|
|