Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03071
StatusFinaled
Name BILTMORE COMPANY
Site Address 6017 W OPOHONGA ST
Project NamePalisades Apartments
Customer NumberBLD14-03070
ePlanReviewNo
Description
Palisades Apartments - Building B - To construct a new 23,000 square foot, three story, wood framed, 24 unit multi-family apartment building and related site improvements. This building will have an NFPA 13R sprinkler system. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  2/10/2017 DONE
Permanent Occupancy  2/10/2017 DONE
Plan Reviewer's activity  2/9/2017 DONE
DetailsCarl D Madsen
The scope and plan sheets have been updated as all 24 of the units were completed rathe than the 23 that were originally approve in the scope of the permit. Additional Public work fees are due. The 24th unit was completed and inspected as pert of the overall building construction.
Telephone call  2/9/2017 DONE
called Kevin ###-####-fees need paid then we can re issue the corrected c of o's for both permits BLD14-03070 & BLD14-03071
Permanent Occupancy  10/6/2016 DONE
PubWorks Occupancy Approval10/5/201610/5/201610/5/2016 DONE
DetailsTiffany Lowery
BLD-Final9/29/20169/30/20169/30/2016APART
DetailsMike Jordan
Cody Phone #: ###-####. units 105,106,205,206,305,306 are ok to occupy. Will be ok for perm occ. once all other associated trade permits sign perm.
BLD-Final9/28/20169/29/20169/29/2016APASS
DetailsMike Jordan
Cody// inspection for the 3rd Phone #: ###-####. units 107,108,207,208,307,308 ok to occupy only.
FIRE-Final Inspection9/28/20169/29/20169/29/2016APASS
DetailsTroy Cobbley
Life safety passed. Today I inspected units 105, 106, 205, 206, 305, 306
BLD-Final9/12/20169/13/20169/13/2016AFAIL
DetailsMike Jordan
Cody Phone #: ###-####. Complete all firestopping, doors to be self closing, provide listed approved membrane opening protection for water shut off in 1hr. fire partition.
FIRE-Final Inspection9/8/20169/9/20169/9/2016APART
DetailsTroy Cobbley
Life safety passed for units 107,108,207,208,307,308
Temporary Occupancy9/9/201612/8/20169/9/2016 DONE
DetailsCandy A. Nichols
Unit 303
Temporary Occupancy9/9/201612/8/20169/9/2016 DONE
DetailsCandy A. Nichols
unti 304
BLD-Final9/7/20169/7/20169/7/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. OK to occupy rooms304 and 303 only.
BLD-Final9/1/20169/1/20169/1/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. Ok to occupy 103, 104, 203 and 204 only.
FIRE-Final Inspection8/31/20169/1/20169/1/2016APART
DetailsTroy Cobbley
Life safety passed in apartments 103,104,203,204,303,304.
Temporary Occupancy9/1/201611/30/20169/1/2016 DONE
DetailsCandy A. Nichols
Temporary Occupancy9/1/201611/30/20169/1/2016 DONE
DetailsCandy A. Nichols
Temporary Occupancy9/1/201611/30/20169/1/2016 DONE
DetailsCandy A. Nichols
Temporary Occupancy9/1/201611/30/20169/1/2016 DONE
DetailsCandy A. Nichols
BLD-Final8/11/20168/12/20168/12/2016APART
DetailsMike Jordan
Cody Phone #: ###-####. Temp occ. Ok to occupy units 101,102.201,202,301,302 only. These are the six units on the north end accessed by the the north stairs only.
Temporary Occupancy8/12/201611/10/20168/12/2016 DONE
DetailsChristina Prado
BLD-Final8/10/20168/11/20168/11/2016PFAIL
DetailsMike Jordan
Cody Phone #: ###-####. Firestop all plumbing penetrations where required.
PubWorks Temp Occupancy Appr8/11/20168/11/20168/11/2016 DONE
DetailsTiffany Lowery
Zoning Approval8/9/20168/9/20168/9/2016 PASS
DetailsJosh Wilson
BLD-Final8/5/20168/5/20168/5/2016PNR
DetailsMike Jordan
Cody Phone #: ###-####. Needs zoning and public works.
FIRE-Final Inspection8/1/20168/2/20168/2/2016APART
DetailsTroy Cobbley
Life safety passed for apartments 101,102, 201,202, 301, 302. (North end). Fire sprinkler and fire alarm systems are fully functional.
BLD-Wall cover7/22/20167/25/20167/25/2016APASS
DetailsJim Sly
RC1 // Cody Phone #: ###-####
BLD-Other7/11/20167/11/20167/11/2016PPASS
DetailsPhil Shearer
RC1 Channel; Pat Phone #: ###-####
BLD-Energy code compliance7/7/20167/8/20167/8/2016APASS
DetailsMike Jordan
Cody Phone #: ###-####
BLD-Energy code compliance7/6/20167/6/20167/6/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. 1st-3rd. floors, south end units only. south central portion work in progress.
BLD-Framing/Rough-in6/30/20167/1/20167/1/2016APASS
DetailsMike Jordan
Cody Phone #: ###-####. All issues resolved. 1stg and 2nd floor south half ok to insulate. #rd floor pend. fire sprinkler rough in prior to insulation.
BLD-Framing/Rough-in6/29/20166/30/20166/30/2016AFAIL
DetailsMike Jordan
Cody Phone #: ###-####. Complete all fire caulking and fire blocking. Block floor to flor straps, remove non rated boxes from reated walls.
BLD-Other6/23/20166/24/20166/24/2016APASS
DetailsMike Jordan
sheetrock; Cody Phone #: ###-####. 1st and 2nd floor base layer of 5/8 type x and hat channel for floor ceiling assembly.
BLD-Other6/15/20166/16/20166/16/2016APASS
DetailsMike Jordan
RC1 Channel unit 102 201 202 // Pat Phone #: ###-####
BLD-Energy code compliance6/14/20166/14/20166/14/2016PPASS
DetailsMike Jordan
Pat Phone #: ###-####. 1st and 2nd floors, north half of building ok to sheet rock.
BLD-Energy code compliance6/13/20166/13/20166/13/2016PPART
DetailsMike Jordan
Pat Phone #: ###-####. Needs to provide additional barrier to back side of insulation on 3rd floor caufeered ceilings.
BLD-Framing/Rough-in6/6/20166/6/20166/6/2016PPART
DetailsMike Jordan
Pat Phone #: ###-####. Framing inspection 1st. to third floors north half only. Neeeds to complete all fireblocking, interior straping, provide listing for washer boxes and door frames in corridor and complete LSL blocking on 2nd floor and continue OSB sheathing on interior shear walls to roof deck and brace them per plans. ok to insulate these areas only.
BLD-Framing/Rough-in6/3/20166/3/20166/3/2016PPART
DetailsJim Sly
Pat Phone #: ###-####
Inspection of floor to floor straps on exterior of N. E. and S. walls OK excluding straps to be installed on interior side because of exterior decks installed before straps. Interior location may require approval.
BLD-Framing/Rough-in5/31/20165/31/20165/31/2016PPASS
DetailsMike Jordan
Pat Phone #: ###-####. Ok to cover west exterior of uilding only.
BLD-Framing/Rough-in5/20/20165/23/20165/23/2016AFAIL
DetailsMike Jordan
Pat Phone #: ###-####. Install missing h2.5, provide fix for m77 and m37 trusses that require contionous bearing.
BLD-Framing/Rough-in5/19/20165/20/20165/20/2016PCANC
DetailsMike Jordan
Moved to monday morning. Framer could not make it to job site.
BLD-Framing/Rough-in5/19/20165/19/20165/20/2016PFAIL
DetailsMike Jordan
Work in progress on 1st, 2nd and 3rd. floors. Needs to fireblock fur downs, Provide the hat channel and additional layer of 5/8 type x rock to complete the floor ceiling assembly above fur downs. Provide 5/8 type x rock behind tub/shower stalls. Needs to box out washer boxes as well.
BLD-Wall Bracing5/19/20165/19/20165/20/2016PFAIL
DetailsMike Jordan
Needs to install all exterior and interior floor to floor straps, complete the sheating from interior shear walls on 3rd floor to underneath side of roof deck and provide the kicker supprts as per the approved plans. Also noted ares on interior shear walls not yet attached.
BLD-Wall Bracing5/19/20165/20/20165/20/2016ACANC
DetailsMike Jordan
moved to pm.
BLD-Framing/Rough-in5/18/20165/19/20165/19/2016ACANC
DetailsMike Jordan
Pat Phone #: ###-####-please call prior to meet. Moved to pm.
BLD-Wall Bracing3/25/20163/25/20163/25/2016PPASS
DetailsMike Jordan
Pat Phone #: ###-####. 2nd. floor exterior wall bracing only ok.
BLD-Conference3/23/20163/23/20163/23/2016ADONE
DetailsMike Jordan
Stop by job site to see job to check job progress. 1st floor has been framed, and working on sheeting the 2nd. floor decking.
BLD-Wall Bracing3/4/20163/7/20163/7/2016ACANC
DetailsMike Jordan
BLD-Wall Bracing3/4/20163/4/20163/4/2016PNR
DetailsMike Jordan
BLD-Wall Bracing3/3/20163/4/20163/4/2016ANR
DetailsMike Jordan
BLD-Wall cover3/3/20163/3/20163/3/2016PNR
DetailsMike Jordan
Shear // Pat Phone #: ###-####
BLD-Wall Bracing3/1/20163/1/20163/1/2016PPASS
DetailsMike Jordan
Pat Phone #: ###-####. Holdowns and shearwalls in crawl space.
BLD-Foundation2/16/20162/16/20162/16/2016PPASS
DetailsMike Jordan
wall // Manuel Phone #: ###-####. Stemwall and interior footings ok. Contractor to get RFI from engineer of record indicating the deletion of plate washers and continous erbar from exterior to interior footing transitions.
BLD-Footing2/11/20162/11/20162/11/2016PPASS
DetailsMike Jordan
Manuel Phone #: ###-####. Permiter footings only.
Issue PAID IN FULL permit  10/5/2015 DONE
Print Occupancy Form  10/5/2015 DONE
Extend Review Timeline  9/30/2015 DONE
Final 180 days granted by JCB. See attached document
Expiration Notice9/16/201510/7/20159/16/2015 DONE
DetailsBrittany Hill
Permit Ready to Issue  4/8/2015  
Extend Review Timeline  3/30/2015 DONE
1st 180 days granted by JCB see attached documents.
Change Expiration Date Only  3/30/2015 DONE
To update expiration date from 9/26 to 10/11
Expiration Notice3/24/20154/14/20153/24/2015 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  12/8/2014 DONE
DetailsJohn Menard
Plan assigned to (JCM)10/20/2014 12/8/2014 PASS
DetailsJohn Menard
1st Review Complete 10/31/2014
Routing - FIRE11/10/201411/10/201411/10/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 11-10-14
Route to Impact Fee Review10/31/201411/3/201411/4/2014 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL10/20/2014 10/31/2014 FAIL
DetailsJohn Menard
1st review completed  10/31/2014 FAIL
DetailsJohn Menard
Routing PW Sewer Design10/30/2014 10/30/2014 FAIL
DetailsKyle S. Rosenmeyer
Connect to sewer main using type A,B, or D service connection per ISPWC SD 511. Contact Boise Public Works 48 Hours prior to sewer work in Public R/W to schedule inspection and obtain sewer tap permit. Replace sewer notes with current Boise City Standard Sewer Notes. Current notes are available on www.cityofboise.org.
Routing - MECHANICAL10/20/2014 10/30/2014 FAIL
DetailsTroy James
Routing - PLAN CHECK10/20/2014 10/27/2014 PASS
DetailsJohn Menard
Approved with redlined conditions. JCM
Routing - FIRE10/20/2014 10/24/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 10-24-14
Routing - PLANNING10/20/2014 10/23/2014 PASS
DetailsSue Cummings
Routing - PLANNING Land Div10/20/2014 10/21/2014 PASS
DetailsTodd Tucker
Routing - PLUMBING10/20/2014 10/21/2014 PASS
DetailsDaryl Spivey
Routing - Design Review10/20/2014 10/21/2014 FAIL
DetailsJosh Wilson
Intake Approval  10/20/2014 PASS
DetailsJohn Menard
Pending Assignment by JCM10/20/2014 10/20/2014 DONE
DetailsJohn Menard
Routing - Addressing10/20/2014 10/20/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/20/2014 10/20/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment10/20/2014 10/20/2014 PASS
DetailsEvan Jenkins
Application received  10/16/2014 DONE
Application submitted via PDS Online on Oct 16 2014 9:05AM
First Notice 2/20/2017   
First Notice 10/16/2016