Case Summary (BLD) | | | 9/1/2015 | | DONE |
|
|
|
|
BLD-Conference | 6/1/2015 | 6/1/2015 | 6/1/2015 | A | DONE |
Bob Archibald
|
|
|
Reviewed Items requiring correction with owners, contractor and attorney. Raft span, flashing, soffit and clearance to grade all require correction as per original CN.
|
BLD-Framing/Rough-in | 5/6/2015 | 5/6/2015 | 5/6/2015 | A | FAIL |
Jim Storey
|
|
|
covered with out insp. roof gable opened to check roof rafters. 2 x 4 rafters over span aprox 11ft/ flashing not in place at gable an roof/ rooffing not instaled per listing.
|
BLD-Conference | 3/10/2015 | 3/11/2015 | 3/11/2015 | A | PART |
Jim Storey
|
|
|
Mandy-please show Mandy any walls etc that will need removed for an inspection to be done. Phone #: ###-#### open gable for insp. of raffter size/span/spacing
|
Routing Walk-In (BLD) | 3/10/2015 | 3/10/2015 | 3/10/2015 | P | PASS |
Perry Paine
|
|
|
questions about non compliance of a general contractor.
|
Case Summary (BLD) | | | 3/10/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Conference | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | FAIL |
Jim Storey
|
|
|
Please call ahead for access - Shane or Mandy ###-####(homeowners) Phone #: ###-#### IRC r109 framing covered with out aproval.
|
Routing Walk-In (Zoning) | 10/20/2014 | 10/20/2014 | 10/20/2014 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/20/2014 | 10/20/2014 | 10/20/2014 | P | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 10/20/2014 | | |
|
|
|
|
1st review completed | | | 10/20/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/20/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 10/20/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing Walk-In (BLD) | 10/16/2014 | 10/16/2014 | 10/16/2014 | P | FAIL |
Perry Paine
|
|
|
needing a site plan and Planning approval
|
1st review completed | | | 10/16/2014 | | FAIL |
Javier Guzman
|
|
|
|
Application received | | 10/16/2014 | | | |
|
|
|
|