Permit Information
Permit NumberBLD14-03080
StatusFinaled
Name PERKINS CONSTRUCTION
Site Address 701 E BOISE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Timberline Soccer Field Shade Canopies - To construct two (2) 160 square foot, one story pre-engineered metal shade canopies over 220 sq. ft. concrete slabs and related site improvements, including an 81 square foot concrete slab. The structues are being constructed adjacent to the existing Timberline High School soccer field. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/8/2016 DONE
Second Notice 1/23/20162/11/2016 DONE
Mailed 2-12-16
First Notice12/31/201512/31/20151/13/2016 DONE
DetailsJim Storey
BLD-Aging Inspection12/31/201512/31/201512/31/2015 DONE
DetailsJim Storey
DOC - Permit Finaled12/31/201512/31/201512/31/2015PPASS
DetailsJim Storey
BLD-Final8/18/20158/19/20158/19/2015APASS
DetailsJim Storey
Nick Phone #: ###-####
FIRE-Final Inspection8/17/20158/17/20158/17/2015PPASS
DetailsJim Page
Life fire safety passed/complete
BLD-Final8/13/20158/14/20158/14/2015PPASS
DetailsJim Storey
Nick Phone #: ###-#### pending fire insp sign off
BLD-Footing8/7/20158/7/20158/7/2015PPASS
DetailsJim Storey
Nick-pour time noon Phone #: ###-####
Issue PAID IN FULL permit  7/17/2015 DONE
DetailsChristina Prado
OVERRIDE  4/29/2015  
Plan assigned to (JCM)4/28/20154/28/20154/29/2015 PASS
DetailsJohn Menard
Routing - PLAN CHECK4/29/2015 4/29/2015 PASS
DetailsJohn Menard
Reviewed and approved plan modification to change column foundation design. JCM
PLANS/APPL TAKEN TO FRONT DESK  4/29/2015 DONE
DetailsJohn Menard
Permit Ready to Issue  4/29/2015 DONE
DetailsChristina Prado
GC requirement met, just need RP for issuance///cdp 7/17/15
Need GC & RP
Telephone call  4/29/2015 DONE
called Richard to let know plan mod is ready-permit has not been issued yet so is still in ready status-let Richard know we still need the GC and RP
Plan Modification Accepted  4/28/2015 DONE
plan mod received 3 each sheet a2.11 and 3 supplemental struc calcs- took that and plans from drawer to John M
Extend Review Timeline  4/21/2015 DONE
180 days granted by JCB. See attached documents
Change Expiration Date Only  4/21/2015 DONE
Telephone call  4/9/2015 DONE
Call to Richard Honsinger. Said he was in the middle of drafting up a letter over to Jason B
Expiration Notice3/24/20154/14/20153/24/2015 DONE
DetailsBrittany Hill
Route to Impact Fee Review10/24/201410/27/201411/4/2014 PASS
DetailsCindy M. Gould
OVERRIDE  10/28/2014  
Telephone call  10/28/2014 DONE
DetailsCandy A. Nichols
called Richard to let know permit is ready and how much is owed. Also that we need the RP & GC.
Permit Ready to Issue  10/28/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (JCM)10/20/2014 10/27/2014 PASS
DetailsJohn Menard
Routing - PLAN CHECK10/24/2014 10/27/2014 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  10/27/2014 DONE
DetailsJohn Menard
Print Occupancy Form  10/27/2014 DONE
DetailsChristina Prado
1st review completed  10/24/2014 PASS
DetailsJohn Menard
Routing - FIRE10/23/2014 10/24/2014 PASS
DetailsCraig D. Hanson
No report. Non-combustible open shelters under 500 SF
1st review completed  10/24/2014 DONE
Pass all
Routing - PLANNING10/20/2014 10/22/2014 PASS
DetailsJoshua Johnson
Routing - PLAN CHECK10/17/2014 10/20/2014 PASS
DetailsJohn Menard
Approved strucural and nonstructural requirements. JCM
Routing - Addressing10/20/2014 10/20/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS10/20/2014 10/20/2014 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment10/20/2014 10/20/2014 PASS
DetailsEvan Jenkins
Timberline Soccer Field Shade Canopies - To construct two (2) 160 square foot, one story pre-engineered metal shade canopies over 220 sq. ft. concrete slabs and related site improvements, including an 81 square foot concrete slab. The structues are being constructed adjacent to the existing Timberline High School soccer field. All construction per the approved plans.
Routing - PLANNING Land Div10/17/2014 10/17/2014 PASS
DetailsDave Abo
Parcel over 5 acres.
Plans ACCEPTED BY PLAN TECH  10/17/2014 DONE
DetailsCandy A. Nichols
Intake Approval  10/17/2014 PASS
DetailsJavier Guzman
Recd Pcfee & Taken To Pln CK  10/17/2014 DONE
DetailsCandy A. Nichols
Application received 10/17/2014