Zoning Approval | 3/20/2017 | 3/20/2017 | 3/20/2017 | | PASS |
Sarah Schafer
|
|
|
|
Permanent Occupancy | | | 3/20/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Jim Page
|
|
|
Previously nited items in onference remarks have been addressed and repaired. Fire sprinkler inspection is complete, fire alarm inspection is complete, knox box is in place, fire extinguishers are mounted with current inspection tags. Final life fire safety inspection passed/complete.
|
BLD-Final | 3/9/2017 | 3/10/2017 | 3/10/2017 | P | PASS |
Jim Storey
|
|
|
Robert Phone #: ###-#### handrails west of building ok
|
BLD-Conference | 3/8/2017 | 3/8/2017 | 3/8/2017 | A | PART |
Dave Hannah
|
|
|
needs to finish handrails on ext
|
FIRE-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | DONE |
Jim Page
|
|
|
Items needed before final life fire safety inspection: knox box needs to be installed, signage for fire alarm control panel and fire sprinkler riser room, gas piping and cpvc piping that is currently exposed in the south stairwell need to be enclosed in a hour fire rated assembly, bell needs to be installed by the fire department connection and addressing needs to be a minimum 4 inch tall numbers with and a minimum stroke width of half an inch.
|
FIRE-Final Inspection | 1/19/2017 | 1/19/2017 | 1/19/2017 | P | CANC |
Jim Page
|
|
|
Request was for a conference, not a final inspection. Fire conference complete in regards to fire extinguisher placement.
|
BLD-Framing/Rough-in | 12/5/2016 | 12/5/2016 | 12/5/2016 | P | PASS |
Phil Shearer
|
|
|
Kelly Phone #: ###-####. Stairs
|
BLD-Energy code compliance | 11/18/2016 | 11/21/2016 | 11/21/2016 | A | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 11/18/2016 | | DONE |
|
|
|
plan mod fees paid
|
BLD-Energy code compliance | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PASS |
Phil Shearer
|
|
|
Kevin// insp. on main level Phone #: ###-####. Exterior wall ok not stair ways
|
OVERRIDE | | | 11/16/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 11/8/2016 | 11/8/2016 | 11/16/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 11/9/2016 | | 11/16/2016 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/16/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
BLD-Framing/Rough-in | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | CANC |
Phil Shearer
|
|
|
Sean Phone #: ###-####. 2ND floor sofits ok for cover
|
Routing - PLAN CHECK | 11/9/2016 | | 11/9/2016 | | PASS |
Carl Westfall
|
|
|
|
BLD-Framing/Rough-in | 11/8/2016 | 11/8/2016 | 11/8/2016 | P | FAIL |
Phil Shearer
|
|
|
Kevin Phone #: ###-#### Need to fire tape joints and screews
|
Plan Modification Accepted | | | 11/8/2016 | | DONE |
|
|
|
Plan Mod to update the range systems in the residential units
|
BLD-Framing/Rough-in | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | FAIL |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | FAIL |
Phil Shearer
|
|
|
Kevin-2nd floor Phone #: ###-####
|
BLD-Framing/Rough-in | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Phil Shearer
|
|
|
Scott Phone #: ###-#### 2nd floor
|
BLD-Energy code compliance | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Phil Shearer
|
|
|
Scott Phone #: ###-#### 2nd floor
|
BLD-Framing/Rough-in | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PART |
Phil Shearer
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | FAIL |
Phil Shearer
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | PART |
Phil Shearer
|
|
|
Scott Phone #: ###-####. OK to isulate extrior walls
|
BLD-Framing/Rough-in | 9/12/2016 | 9/12/2016 | 9/12/2016 | P | CANC |
Phil Shearer
|
|
|
Scott Phone #: ###-####
|
BLD-Energy code compliance | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Phil Shearer
|
|
|
Scott Phone #: ###-####. 3rd floor
|
BLD-Energy code compliance | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PART |
Phil Shearer
|
|
|
Scott Phone #: ###-####. 3RD floor part
|
BLD-Framing/Rough-in | 8/24/2016 | 8/25/2016 | 8/25/2016 | P | PART |
Phil Shearer
|
|
|
Scott Phone #: ###-####.penetrations in floor assembily. OK to insulate.
|
BLD-Conference | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | DONE |
Phil Shearer
|
|
|
9:30
|
BLD-Framing/Rough-in | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PART |
Phil Shearer
|
|
|
Scott Phone #: ###-#### 3RD floor needs sheetrock on rated walls and to provide listed assemblies for all penetrations.
|
BLD-Conference | 7/5/2016 | 7/6/2016 | 7/6/2016 | P | DONE |
Phil Shearer
|
|
|
Scott Phone #: ###-####
|
BLD-Wall Bracing | 6/21/2016 | 6/22/2016 | 6/22/2016 | P | PASS |
Phil Shearer
|
|
|
Scott Phone #: ###-####
|
BLD-Wall Bracing | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Phil Shearer
|
|
|
Scott-Roof shear Phone #: ###-####
|
BLD-Aging Inspection | 5/26/2016 | 5/26/2016 | 5/26/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Foundation | 8/31/2015 | 9/1/2015 | 9/1/2015 | A | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-#### 7140 SW Fir Loop, Ste. 231 · Tigard, OR 97223 v: 503.620.4314 · f: 503.620.4304 www.allstructure.com MEMORANDUM TO: FROM: Kevin Kelly Ryan Hardie COMPANY: DATE: owner 8/28/15 E-MAIL OR FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: 1 PHONE NUMBER: PROJECT NUMBER: 13302.00 RE: PROJECT NAME: Special Inspection Harris Ranch Mixed-Use COPY: File NOTES/COMMENTS:
Kevin, This memo follows up on our memo of 8.26.2015 regarding waiving special inspection of the building foundation concrete. Per section 1705.3 of the building code, a condition of waiving foundation for concrete is that the design of the footing is based on a specified compressive f'c no greater than 2,500 psi regardless of the copressive strength specified in the construction documents. The original calculations had the foundation designed for 3,000 psi. Prior to the previous memo recommending waiving special inspection, we checked the foundation design for 2,500 psi and found it adequate as designed. Calculations are available upon request. Please feel free to contact me if I can be of any further assistance. Sincerely, Ryan Hardie, PE, SE Principal DIGITAL SIGNATURE
|
BLD-Foundation | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | PART |
Jim Storey
|
|
|
Manuel Phone #: ###-#### c/n si required justify
|
BLD-Footing | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Phil Shearer
|
|
|
Manuel Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/7/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/7/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/6/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 4/6/2015 | | DONE |
Christina Prado
|
|
|
Need ACHD receipt
|
Expiration Notice | 3/24/2015 | 4/14/2015 | 3/24/2015 | | DONE |
Brittany Hill
|
|
|
|
Routing - PLAN CHECK | 2/10/2015 | | 2/11/2015 | | PASS |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 2/11/2015 | | 2/11/2015 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/3/2014 | | 2/11/2015 | | PASS |
Carl Westfall
|
|
|
HARRIS RANCH MIXED USE BUILDING (15 days Nov 21 - 30 day Dec 12) (1st review done)
|
Plan resubmittals received | | | 2/10/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/9/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 2/3/2015 | | 2/9/2015 | | FAIL |
Troy James
|
|
|
talked with otto with tikker engineering about the remaining mechanical comments.
|
Routing Off Site - STRUCTURAL | 2/3/2015 | | 2/3/2015 | | PASS |
Carl Westfall
|
|
|
AHJ - Dave Haugland
|
Routing - PLAN CHECK | 1/30/2015 | | 2/3/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines
|
Plan resubmittals received | | | 1/30/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/16/2015 | | 1/23/2015 | | FAIL |
Carl Westfall
|
|
|
AHJ - Dave Haugland
|
Plan resubmittals requested | | | 1/23/2015 | | DONE |
Carl Westfall
|
|
|
|
Routing - PLUMBING | 1/16/2015 | | 1/22/2015 | | PASS |
Bill VanDegrift
|
|
|
Bill Vandegrift
|
Routing - PLAN CHECK | 1/14/2015 | | 1/21/2015 | | FAIL |
Carl Westfall
|
|
|
Some items not resolved. Revised drawings required.
|
Routing - MECHANICAL | 1/16/2015 | | 1/20/2015 | | FAIL |
Troy James
|
|
|
|
Plan resubmittals received | | | 1/14/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 12/4/2014 | 12/7/2014 | 12/9/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 12/4/2014 | | DONE |
|
|
|
|
1st review completed | | | 12/4/2014 | | FAIL |
|
|
|
Mechanical, Plumbing, Structural, and Building
|
Routing - PLAN CHECK | 11/3/2014 | | 12/4/2014 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 11/3/2014 | | 11/18/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 11-18-14
|
Routing Off Site - STRUCTURAL | 11/3/2014 | | 11/18/2014 | | FAIL |
Carl Westfall
|
|
|
AHJ - Dave Haugland
|
Routing PW Sewer Design | 11/5/2014 | | 11/10/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLUMBING | 11/3/2014 | | 11/7/2014 | | FAIL |
Daryl Spivey
|
|
|
vent downstream of the interceptor,
building sewer location doesn't match civil
|
Routing - Design Review | 11/3/2014 | | 11/6/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Solid Waste | 11/5/2014 | | 11/6/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 11/5/2014 | | 11/5/2014 | | PASS |
Terry Alber
|
|
|
Grease waste line and grease interceptor shown are acceptable.
|
Routing PW Sewer Rating | 11/5/2014 | | 11/5/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - MECHANICAL | 11/3/2014 | | 11/5/2014 | | FAIL |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 11/3/2014 | | 11/5/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 11/5/2014 | | 11/5/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 11/5/2014 | | 11/5/2014 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing - Erosion and Sediment | 11/3/2014 | | 11/3/2014 | | PASS |
Evan Jenkins
|
|
|
SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE
BLD14-03228 garage (1); BLD14-03229 garage (2); on same plans in ePlanReview. 3 story, mixed use building with M and/orA2 first floor, R2 second, third floor. Two one story garage buildings with individual garages
|
Routing - PLANNING Land Div | 11/3/2014 | | 11/3/2014 | | PASS |
Dave Abo
|
|
|
Parcel is a platted lot in a subdivision.
|
Routing - Addressing | 11/3/2014 | | 11/3/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 11/3/2014 | | PASS |
John Menard
|
|
|
Please update this activity when the fees are paid
|
Pending Assignment by JCM | 11/3/2014 | | 11/3/2014 | | DONE |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 10/31/2014 | | PASS |
|
|
|
Plan intake approved
|
Intake Approval | | | 10/24/2014 | | FAIL |
|
|
|
(10-24-14) Please provide a completed application for each garage building and upload them into the documents folder. DO NOT CREATE ANY ADDITIONAL PERMITS IN ePlanReview. The three permits will be done under one set of drawings. CJW
|
Application received | | | 10/17/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 17 2014 9:36AM
|