Permit Information
Permit NumberBLD14-03081
StatusFinaled
Name KHI CONSTRUCION INC
Site Address 3724 S ECKERT RD
Project NameHarris Ranch Mixed Use
Customer NumberBLD14-03081, 03228, 03229
ePlanReviewYes
Description
(HARRIS RANCH MIXED USE BUILDING - BLD14-03081, BLD14-03228, AND BLD14-03229 ARE ALL ATTACHED TO CASE BLD14-03081 IN EPLANREVIEW) (11-16-16 PLAN MODIFICATION TO ADD EXHAUST DUCTS FOR RESIDENTIAL RANGE HOODS. ON THE 2ND STORY THE EXHAUST DUCTS EXTEND TO THE OUTSIDE WITHIN A NONCOMBUSTIBLE SOFFIT. ON THE 3RD STORY THE EXHAUST DUCTS EXTEND INTO THE ATTIC AND THEN INDEPENDENTLY TO THE OUTSIDE.) To construct a new 3 story mixed use building having a total floor area of about 13,251 square feet (4,342 square feet 1st story, 4,663 square feet 2nd story, and 4,246 square feet 3rd story). The 1st story will be used for future retail and/or assembly tenants. The 2nd and 3rd stories will be used for a total of 7 residential apartments (six 1 story units, three on each story, and one 2 story unit). This permit is intended to establish a Certificate of Occupancy only for the residential apartments located on the 2nd and 3rd stories. The 1st story commercial tenant spaces are required to apply for and receive their own Certificates of Occupancy before occupancy. Work is to include concrete retaining walls, concrete footings, concrete foundations, exterior concrete flat work, interior concrete slab on grade, wood stud exterior walls, wood floor systems, wood roof systems, exterior windows and doors, interior windows and doors, two 1-hr stairway enclosures, vertical and horizontal 1-hr dwelling unit separations, a 1-hr occupancy separation between the 1st and 2nd stories, .5-hr corridors on the 2nd and 3rd stories, a ladder and hatch to serve the roof, millwork, interior finishes, and exterior finishes. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. Special inspection is required for concrete, soils, and welding. The design for the engineered wood trusses and the design for the aluminum balcony and railing system are deferred submittal items. The fire sprinkler system for the entire building is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval3/20/20173/20/20173/20/2017 PASS
DetailsSarah Schafer
Permanent Occupancy  3/20/2017 DONE
DetailsChristina Prado
FIRE-Final Inspection3/13/20173/13/20173/13/2017PPASS
DetailsJim Page
Previously nited items in onference remarks have been addressed and repaired. Fire sprinkler inspection is complete, fire alarm inspection is complete, knox box is in place, fire extinguishers are mounted with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Final3/9/20173/10/20173/10/2017PPASS
DetailsJim Storey
Robert Phone #: ###-#### handrails west of building ok
BLD-Conference3/8/20173/8/20173/8/2017APART
DetailsDave Hannah
needs to finish handrails on ext
FIRE-Conference3/2/20173/2/20173/2/2017PDONE
DetailsJim Page
Items needed before final life fire safety inspection: knox box needs to be installed, signage for fire alarm control panel and fire sprinkler riser room, gas piping and cpvc piping that is currently exposed in the south stairwell need to be enclosed in a hour fire rated assembly, bell needs to be installed by the fire department connection and addressing needs to be a minimum 4 inch tall numbers with and a minimum stroke width of half an inch.
FIRE-Final Inspection1/19/20171/19/20171/19/2017PCANC
DetailsJim Page
Request was for a conference, not a final inspection. Fire conference complete in regards to fire extinguisher placement.
BLD-Framing/Rough-in12/5/201612/5/201612/5/2016PPASS
DetailsPhil Shearer
Kelly Phone #: ###-####. Stairs
BLD-Energy code compliance11/18/201611/21/201611/21/2016APASS
DetailsPhil Shearer
Kevin Phone #: ###-####
CHANGE STATUS TO (ISS)  11/18/2016 DONE
plan mod fees paid
BLD-Energy code compliance11/16/201611/16/201611/16/2016PPASS
DetailsPhil Shearer
Kevin// insp. on main level Phone #: ###-####. Exterior wall ok not stair ways
OVERRIDE  11/16/2016  
Plan assigned to (CJW)11/8/201611/8/201611/16/2016 PASS
DetailsCarl Westfall
Routing - MECHANICAL11/9/2016 11/16/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  11/16/2016 DONE
Permit Ready to Issue  11/16/2016 DONE
DO NOT REISSUE PLAN MOD
BLD-Framing/Rough-in11/9/201611/9/201611/9/2016PCANC
DetailsPhil Shearer
Sean Phone #: ###-####. 2ND floor sofits
ok for cover
Routing - PLAN CHECK11/9/2016 11/9/2016 PASS
DetailsCarl Westfall
BLD-Framing/Rough-in11/8/201611/8/201611/8/2016PFAIL
DetailsPhil Shearer
Kevin Phone #: ###-#### Need to fire tape joints and screews
Plan Modification Accepted  11/8/2016 DONE
Plan Mod to update the range systems in the residential units
BLD-Framing/Rough-in11/3/201611/4/201611/4/2016AFAIL
DetailsPhil Shearer
Kevin Phone #: ###-####
BLD-Framing/Rough-in11/2/201611/2/201611/2/2016PFAIL
DetailsPhil Shearer
Kevin-2nd floor Phone #: ###-####
BLD-Framing/Rough-in9/21/20169/21/20169/21/2016PPASS
DetailsPhil Shearer
Scott Phone #: ###-#### 2nd floor
BLD-Energy code compliance9/21/20169/21/20169/21/2016PPASS
DetailsPhil Shearer
Scott Phone #: ###-#### 2nd floor
BLD-Framing/Rough-in9/20/20169/20/20169/20/2016PPART
DetailsPhil Shearer
Scott Phone #: ###-####
BLD-Framing/Rough-in9/16/20169/16/20169/16/2016PFAIL
DetailsPhil Shearer
Scott Phone #: ###-####
BLD-Framing/Rough-in9/12/20169/13/20169/13/2016APART
DetailsPhil Shearer
Scott Phone #: ###-####. OK to isulate extrior walls
BLD-Framing/Rough-in9/12/20169/12/20169/12/2016PCANC
DetailsPhil Shearer
Scott Phone #: ###-####
BLD-Energy code compliance8/30/20168/30/20168/30/2016PPASS
DetailsPhil Shearer
Scott Phone #: ###-####. 3rd floor
BLD-Energy code compliance8/29/20168/29/20168/29/2016PPART
DetailsPhil Shearer
Scott Phone #: ###-####. 3RD floor part
BLD-Framing/Rough-in8/24/20168/25/20168/25/2016PPART
DetailsPhil Shearer
Scott Phone #: ###-####.penetrations in floor assembily. OK to insulate.
BLD-Conference8/18/20168/19/20168/19/2016ADONE
DetailsPhil Shearer
9:30
BLD-Framing/Rough-in7/18/20167/19/20167/19/2016APART
DetailsPhil Shearer
Scott Phone #: ###-#### 3RD floor needs sheetrock on rated walls and to provide listed assemblies for all penetrations.
BLD-Conference7/5/20167/6/20167/6/2016PDONE
DetailsPhil Shearer
Scott Phone #: ###-####
BLD-Wall Bracing6/21/20166/22/20166/22/2016PPASS
DetailsPhil Shearer
Scott Phone #: ###-####
BLD-Wall Bracing6/16/20166/16/20166/16/2016PPASS
DetailsPhil Shearer
Scott-Roof shear Phone #: ###-####
BLD-Aging Inspection5/26/20165/26/20165/26/2016 PEND
DetailsPhil Shearer
BLD-Aging Inspection1/13/20161/13/20161/13/2016 PASS
DetailsJim Storey
wip
BLD-Foundation8/31/20159/1/20159/1/2015APASS
DetailsJim Storey
Dane Phone #: ###-#### 7140 SW Fir Loop, Ste. 231 · Tigard, OR 97223
v: 503.620.4314 · f: 503.620.4304
www.allstructure.com
MEMORANDUM
TO: FROM:
Kevin Kelly Ryan Hardie
COMPANY: DATE:
owner 8/28/15
E-MAIL OR FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER:
1
PHONE NUMBER: PROJECT NUMBER:
13302.00
RE: PROJECT NAME:
Special Inspection Harris Ranch Mixed-Use
COPY:
File
NOTES/COMMENTS:

Kevin,
This memo follows up on our memo of 8.26.2015 regarding waiving special inspection of the
building foundation concrete. Per section 1705.3 of the building code, a condition of waiving
foundation for concrete is that the design of the footing is based on a specified compressive f'c no
greater than 2,500 psi regardless of the copressive strength specified in the construction
documents.
The original calculations had the foundation designed for 3,000 psi. Prior to the previous memo
recommending waiving special inspection, we checked the foundation design for 2,500 psi and
found it adequate as designed. Calculations are available upon request.
Please feel free to contact me if I can be of any further assistance.
Sincerely,
Ryan Hardie, PE, SE
Principal
DIGITAL SIGNATURE
BLD-Foundation8/24/20158/25/20158/25/2015APART
DetailsJim Storey
Manuel Phone #: ###-#### c/n si required justify
BLD-Footing8/21/20158/21/20158/21/2015PPASS
DetailsPhil Shearer
Manuel Phone #: ###-####
Issue PAID IN FULL permit  4/7/2015 DONE
Print Occupancy Form  4/7/2015 DONE
OVERRIDE  4/6/2015  
Permit Ready to Issue  4/6/2015 DONE
DetailsChristina Prado
Need ACHD receipt
Expiration Notice3/24/20154/14/20153/24/2015 DONE
DetailsBrittany Hill
Routing - PLAN CHECK2/10/2015 2/11/2015 PASS
DetailsCarl Westfall
Routing - MECHANICAL2/11/2015 2/11/2015 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  2/11/2015 DONE
Plan assigned to (CJW)11/3/2014 2/11/2015 PASS
DetailsCarl Westfall
HARRIS RANCH MIXED USE BUILDING (15 days Nov 21 - 30 day Dec 12) (1st review done)
Plan resubmittals received  2/10/2015 DONE
Plan resubmittals requested  2/9/2015 DONE
Routing - MECHANICAL2/3/2015 2/9/2015 FAIL
DetailsTroy James
talked with otto with tikker engineering about the remaining mechanical comments.
Routing Off Site - STRUCTURAL2/3/2015 2/3/2015 PASS
DetailsCarl Westfall
AHJ - Dave Haugland
Routing - PLAN CHECK1/30/2015 2/3/2015 PASS
DetailsCarl Westfall
Drawings approved with redlines
Plan resubmittals received  1/30/2015 DONE
Routing Off Site - STRUCTURAL1/16/2015 1/23/2015 FAIL
DetailsCarl Westfall
AHJ - Dave Haugland
Plan resubmittals requested  1/23/2015 DONE
DetailsCarl Westfall
Routing - PLUMBING1/16/2015 1/22/2015 PASS
DetailsBill VanDegrift
Bill Vandegrift
Routing - PLAN CHECK1/14/2015 1/21/2015 FAIL
DetailsCarl Westfall
Some items not resolved. Revised drawings required.
Routing - MECHANICAL1/16/2015 1/20/2015 FAIL
DetailsTroy James
Plan resubmittals received  1/14/2015 DONE
Route to Impact Fee Review12/4/201412/7/201412/9/2014 PASS
DetailsCindy M. Gould
Plan resubmittals requested  12/4/2014 DONE
1st review completed  12/4/2014 FAIL
Mechanical, Plumbing, Structural, and Building
Routing - PLAN CHECK11/3/2014 12/4/2014 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - FIRE11/3/2014 11/18/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 11-18-14
Routing Off Site - STRUCTURAL11/3/2014 11/18/2014 FAIL
DetailsCarl Westfall
AHJ - Dave Haugland
Routing PW Sewer Design11/5/2014 11/10/2014 PASS
DetailsKyle S. Rosenmeyer
Routing - PLUMBING11/3/2014 11/7/2014 FAIL
DetailsDaryl Spivey
vent downstream of the interceptor,
building sewer location doesn't match civil
Routing - Design Review11/3/2014 11/6/2014 PASS
DetailsJosh Wilson
Routing PW Solid Waste11/5/2014 11/6/2014 PASS
DetailsPeter J. McCullough
Routing PW Environmental11/5/2014 11/5/2014 PASS
DetailsTerry Alber
Grease waste line and grease interceptor shown are acceptable.
Routing PW Sewer Rating11/5/2014 11/5/2014 PASS
DetailsBeverly Mountain
Routing - MECHANICAL11/3/2014 11/5/2014 FAIL
DetailsTroy James
Routing - PUBLIC WORKS11/3/2014 11/5/2014 PASS
DetailsBeverly Mountain
Routing PW Drainage11/5/2014 11/5/2014 PASS
DetailsBrian Murphy
Routing PW Street Lights11/5/2014 11/5/2014 PASS
DetailsMike D Hedge
No new street lighting required.
Routing - Erosion and Sediment11/3/2014 11/3/2014 PASS
DetailsEvan Jenkins
SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE
BLD14-03228 garage (1); BLD14-03229 garage (2); on same plans in ePlanReview. 3 story, mixed use building with M and/orA2 first floor, R2 second, third floor. Two one story garage buildings with individual garages
Routing - PLANNING Land Div11/3/2014 11/3/2014 PASS
DetailsDave Abo
Parcel is a platted lot in a subdivision.
Routing - Addressing11/3/2014 11/3/2014 PASS
DetailsEmily Dixon
Intake Approval  11/3/2014 PASS
DetailsJohn Menard
Please update this activity when the fees are paid
Pending Assignment by JCM11/3/2014 11/3/2014 DONE
DetailsJohn Menard
Plan Reviewer's activity  10/31/2014 PASS
Plan intake approved
Intake Approval  10/24/2014 FAIL
(10-24-14) Please provide a completed application for each garage building and upload them into the documents folder. DO NOT CREATE ANY ADDITIONAL PERMITS IN ePlanReview. The three permits will be done under one set of drawings. CJW
Application received  10/17/2014 DONE
Application submitted via PDS Online on Oct 17 2014 9:36AM