Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD14-03099
StatusFinaled
Name IDAHO COUNTIES RECIPRL MGMT PR
Site Address 3100 S VISTA AVE Unit: 200
Project NameICRMP
Customer Number 
ePlanReviewNo
Description
(I.C.R.M.P. - 2ND STORY REMODEL) (1-29-15 PLAN MODIFICATION TO DELETE THE PROPOSED NEW ENERGY RECOVERY UNIT ON THE 2ND STORY THAT WAS GOING TO SERVE A PORTION OF THE 2ND STORY AND TO PROVIDE A NEW ENERGY RECOVERY UNIT IN THE BASEMENT THAT WILL SERVE THE ENTIRE BUILDING INCLUDING THE ENTIRE 2ND STORY. WORK IS TO INCLUDE INSTALLING A NEW ENERGY RECOVERY UNIT AND REBALANCING THE SYSTEM.) Fire sprinkler system is used for story increase. To remodel the 10,683 square foot 2nd story of an existing 3 story building for an office tenant. The office tenant space will include a 1,310 square foot conference room. Work is to include interior nonbearing walls, interior doors, interior windows, suspended acoustical ceilings, gypsum board soffits, millwork, and finishes. New finishes will be installed within the existing restrooms. The restrooms are required to be accessible to the disabled. A new energy recovery unit will be installed. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system, including quick-response heads, is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  11/23/2015 DONE
Double checked with Tim that the BLD value went up by 700,00. He stated that the architect under estimated big time. Also spoke with him about how the final value for the MEC's should be. He stated YMC INC is 189,263 and Clima-Tech Corporation is 26,113
Print Statement  11/23/2015 DONE
Second Notice 10/22/201511/9/2015 DONE
Mailed 11-10-15
First Notice 9/25/201510/12/2015 DONE
Mailed 10-13-15
FIRE-Final Inspection9/15/20159/16/20159/15/2015APASS
DetailsJim Page
Life fire safety passed/complete
BLD-Final9/14/20159/15/20159/15/2015APASS
DetailsJim Storey
Phone #: 2089360536 >> Inspection requested via mobile web by Mike cano
Permanent Occupancy  9/15/2015 DONE
BLD-Final9/14/20159/14/20159/14/2015PDEFR
DetailsJim Storey
Phone #: 2089360536 >> Inspection requested via mobile web by Mike cano
BLD-Other9/2/20159/3/20159/3/2015PPART
DetailsJim Storey
Phone #: 2089360536 >> Inspection requested via mobile web by Mike Cano need mech permits signed off/ saftey glazing pending instal.
BLD-Other8/26/20158/27/20158/27/2015PCANC
DetailsJim Storey
Phone #: 2089360536 >> Inspection requested via mobile web by Mike cano Inspection cancelled via mobile web on Thursday, August 27, 2015.
BLD-Ceiling Grid Inspection6/29/20156/30/20156/30/2015PPASS
DetailsJim Storey
Phone #: 2089360536 >> Inspection requested via mobile web by Mike cano pending ele aproval.
BLD-Wall cover3/27/20153/30/20153/30/2015APASS
DetailsJim Storey
Phone #: 9360536 >> Inspection requested via mobile web by Mike Cano
BLD-Framing/Rough-in3/20/20153/23/20153/23/2015APART
DetailsJim Storey
Phone #: 2089360536 >> Inspection requested via mobile web by Mike Cano framing ok pending others to sign off
CHANGE STATUS TO (ISS)  1/30/2015 DONE
DetailsCandy A. Nichols
Plan assigned to (CJW)1/28/20151/28/20151/29/2015 PASS
DetailsCarl Westfall
Routing - PLAN CHECK1/28/2015 1/29/2015 PASS
DetailsCarl Westfall
Plan mod approved
PLANS/APPL TAKEN TO FRONT DESK  1/29/2015 DONE
Telephone call  1/29/2015 DONE
DetailsCandy A. Nichols
called Tim Osburn to let know plan mod was ready to pick up and how much is owed. Do Not RE-Issue
Plan Modification Accepted  1/28/2015 DONE
the owner desired the building mechanical system to be update is conjunction with the 2nd floor remodel
Issue PAID IN FULL permit  1/12/2015 DONE
Plan assigned to (CJW)10/21/201410/21/201412/26/2014 PASS
DetailsCarl Westfall
I.C.R.M.P. - 2ND STORY REMODEL - Level 3 TI - Paper - (15 days - Nov 7) (1st review done)
Routing - PLAN CHECK12/24/2014 12/26/2014 DONE
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  12/26/2014 DONE
Print Occupancy Form  12/26/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  12/26/2014 DONE
Telephone call  12/26/2014 DONE
Called Sam- left message that we need GC form, remaining fees, and permit is ready for pick up
Routing - PLAN CHECK12/23/2014 12/24/2014 DONE
DetailsCarl Westfall
Inserted resubmitted drawing and routed back to fire.
Routing - FIRE12/24/2014 12/24/2014 PASS
DetailsScott Arellano
Attached updated Fire Code comments to plans.
Plan resubmittals received  12/23/2014 DONE
one copy of response letter, two copies of FP1.1
Routing - FIRE12/8/2014 12/10/2014 FAIL
DetailsCraig D. Hanson
Items from Fire Plan Review were not addressed.
Routing - PLAN CHECK12/5/2014 12/8/2014 PASS
DetailsCarl Westfall
Drawings approved with redlines after the resubmittal review
Plan resubmittals received  12/5/2014 DONE
received two sets of sheets A3.1, A6.0, and E2.2L, and two copies of response letter from architect and engineer- had customer insert into plans-took to Carl's desk
Routing - PLAN CHECK11/12/2014 12/5/2014 DONE
DetailsCarl Westfall
(12-4-14) Got modification letters from Jason. Waiting for other items to be resolved.

(12-5-14) Remaining items submitted.
Plan resubmittals received  11/21/2014 DONE
received letter and taken to Jason Blais
Routing - FIRE11/10/2014 11/12/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 11-121-14
1st review completed  11/12/2014 DONE
Failed: Plan Check, Fire
Routing - PLAN CHECK10/23/2014 11/10/2014 FAIL
DetailsCarl Westfall
Plan revisions, etc. required
Routing - PLUMBING10/22/2014 10/23/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC>
Routing - Addressing10/21/2014 10/22/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/22/2014 10/22/2014 PASS
DetailsJennifer Bruner
Pending Assignment by JCB10/20/2014 10/21/2014 DONE
DetailsJason Blais
Application received 10/20/201410/20/2014 DONE
Intake Approval  10/20/2014 PASS
Plans ACCEPTED BY PLAN TECH  10/20/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  10/20/2014 DONE
DetailsTisha Gallop