Print Statement | | | 9/23/2015 | | DONE |
|
|
|
|
Second Notice | | 8/21/2015 | 9/15/2015 | | DONE |
|
|
|
Mailed 9/16/15
|
First Notice | | 8/3/2015 | 8/11/2015 | | DONE |
|
|
|
mailed 8-12
|
PubWorks Occupancy Approval | 8/5/2015 | 8/5/2015 | 8/5/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 7/24/2015 | | DONE |
|
|
|
|
BLD-Final | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | PART |
Jim Storey
|
|
|
Kevin Phone #: ###-#### final ok pending fire
|
FIRE-Final Inspection | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given until the 5" barrel on the fire hydrant is pointed the right way and correct fire dept access signage is provided.
|
BLD-Framing/Rough-in | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PART |
Jim Storey
|
|
|
Jim Phone #: ###-#### ok to cover exterior
|
BLD-Foundation | 12/17/2014 | 12/18/2014 | 12/18/2014 | P | PART |
Jim Storey
|
|
|
rebar - Jim Phone #: ###-#### placed with si pending reports
|
BLD-Foundation | 12/16/2014 | 12/17/2014 | 12/17/2014 | P | DEFR |
Jim Storey
|
|
|
rebar - Jim Phone #: ###-####
|
Extend Permit 90/180 days | 12/17/2014 | 12/18/2014 | 12/17/2014 | P | CANC |
Jim Storey
|
|
|
rebar - Jim Phone #: ###-####
|
BLD-Concrete | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PART |
Jim Storey
|
|
|
Jim// pour time 11am Phone #: ###-#### si aproval
|
Issue PAID IN FULL permit | | | 11/20/2014 | | DONE |
Christina Prado
|
|
|
|
Route to Impact Fee Review | 11/10/2014 | 11/13/2014 | 11/18/2014 | | PASS |
Cindy M. Gould
|
|
|
|
OVERRIDE | | | 11/17/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2014 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 11/17/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 11/17/2014 | | DONE |
Christina Prado
|
|
|
Called ZGA to advise permit is ready pending ACHD and gave fees due
|
Permit Ready to Issue | | | 11/17/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 11/12/2014 | | 11/17/2014 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 10/21/2014 | | 11/17/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 11/5/2014
|
Plan resubmittals received | | | 11/14/2014 | | |
|
|
|
received 3 copies of Supplemental Structural Calculations #2, Sheet S-221, and S-311
|
Plan resubmittals requested | | | 11/13/2014 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second structural review requesting additional calculations and revised drawings. JCM
|
Routing Off Site - STRUCTURAL | 11/10/2014 | | 11/13/2014 | | PASS |
John Menard
|
|
|
Structural approved with revised e-mailed directly to the reviewing engineer. Revise structural plans submitted to City on 11/14/2014. JCM
|
Routing - Design Review | 11/12/2014 | | 11/12/2014 | | PASS |
Andrea Tuning
|
|
|
|
1st review completed | | | 11/10/2014 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 11/10/2014 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 11/5/2014 | | 11/10/2014 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 11/10/2014 | | DONE |
Christina Prado
|
|
|
Received three sets of revised structural calcs, plan sheets marked S-101, SS-211, S-311 as well as three response letters; Plans inserted by arch rep and taken to JCM for further review
|
Routing - FIRE | 11/7/2014 | | 11/10/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 11-10-14
|
Routing - MECHANICAL | 11/3/2014 | | 11/5/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 11/5/2014 | | 11/5/2014 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/21/2014 | | 11/5/2014 | | FAIL |
John Menard
|
|
|
sent 1 set of drawings, geot calcs & struc clacs
|
Plan resubmittals requested | | | 11/5/2014 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PLUMBING | 10/29/2014 | | 11/3/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Erosion and Sediment | 10/28/2014 | | 10/29/2014 | | PASS |
Evan Jenkins
|
|
|
SITE PREP INSPECTION REQUIRED. Hawkinson Warehouse - 11,215 SF Warehouse for Recreational Use. NY Canal really close to project
|
Routing - PUBLIC WORKS | 10/21/2014 | | 10/28/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Sewer Design | 10/27/2014 | | 10/28/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Solid Waste | 10/28/2014 | | 10/28/2014 | | PASS |
Peter J. McCullough
|
|
|
Trash enclosure approved for carts only.
Contact: ###-####
|
Routing PW Drainage | 10/27/2014 | | 10/27/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 10/27/2014 | | 10/27/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 10/21/2014 | | 10/22/2014 | | PASS |
Emily Dixon
|
|
|
|
Application received | | 10/21/2014 | 10/21/2014 | | DONE |
John Menard
|
|
|
|
(F) Reprint permit | | | 10/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 10/21/2014 | | PASS |
John Menard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Pending Assignment by JCM | 10/21/2014 | | 10/21/2014 | | DONE |
John Menard
|
|
|
|
Routing - PLANNING Land Div | 10/21/2014 | | 10/21/2014 | | PASS |
Dave Abo
|
|
|
|