Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03103
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 592 W MCGREGOR DR
Project NameHawkinson Warehouse
Customer Number 
ePlanReviewNo
Description
Hawkinson Warehouse - To construct a new 10,750 square foot, one story, pre-engineered metal warehouse building and related site improvements. This warehouse will be owned and used by a private individual and will be for personal use only; this building will not be used for any commercial use. This building is not fire sprinklered. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/23/2015 DONE
Second Notice 8/21/20159/15/2015 DONE
Mailed 9/16/15
First Notice 8/3/20158/11/2015 DONE
mailed 8-12
PubWorks Occupancy Approval8/5/20158/5/20158/5/2015 DONE
DetailsTiffany Lowery
BLD-Final7/24/20157/24/20157/24/2015PPASS
DetailsJim Storey
Phone #: ###-####
FIRE-Final Inspection7/24/20157/24/20157/24/2015PPASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  7/24/2015 DONE
BLD-Final7/23/20157/23/20157/23/2015PPART
DetailsJim Storey
Kevin Phone #: ###-#### final ok pending fire
FIRE-Final Inspection7/23/20157/23/20157/23/2015PPART
DetailsTroy Cobbley
A temporary occupancy is being given until the 5" barrel on the fire hydrant is pointed the right way and correct fire dept access signage is provided.
BLD-Framing/Rough-in6/10/20156/10/20156/10/2015PPASS
DetailsPhil Shearer
Jim Phone #: ###-####
BLD-Framing/Rough-in3/17/20153/18/20153/18/2015APART
DetailsJim Storey
Jim Phone #: ###-#### ok to cover exterior
BLD-Foundation12/17/201412/18/201412/18/2014PPART
DetailsJim Storey
rebar - Jim Phone #: ###-#### placed with si pending reports
BLD-Foundation12/16/201412/17/201412/17/2014PDEFR
DetailsJim Storey
rebar - Jim Phone #: ###-####
Extend Permit 90/180 days12/17/201412/18/201412/17/2014PCANC
DetailsJim Storey
rebar - Jim Phone #: ###-####
BLD-Concrete12/11/201412/12/201412/12/2014APART
DetailsJim Storey
Jim// pour time 11am Phone #: ###-#### si aproval
Issue PAID IN FULL permit  11/20/2014 DONE
DetailsChristina Prado
Route to Impact Fee Review11/10/201411/13/201411/18/2014 PASS
DetailsCindy M. Gould
OVERRIDE  11/17/2014  
PLANS/APPL TAKEN TO FRONT DESK  11/17/2014 DONE
DetailsJohn Menard
Print Occupancy Form  11/17/2014 DONE
DetailsCandy A. Nichols
Telephone call  11/17/2014 DONE
DetailsChristina Prado
Called ZGA to advise permit is ready pending ACHD and gave fees due
Permit Ready to Issue  11/17/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK11/12/2014 11/17/2014 PASS
DetailsJohn Menard
Plan assigned to (JCM)10/21/2014 11/17/2014 PASS
DetailsJohn Menard
1st Review Complete 11/5/2014
Plan resubmittals received  11/14/2014  
received 3 copies of Supplemental Structural Calculations #2, Sheet S-221, and S-311
Plan resubmittals requested  11/13/2014 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second structural review requesting additional calculations and revised drawings. JCM
Routing Off Site - STRUCTURAL11/10/2014 11/13/2014 PASS
DetailsJohn Menard
Structural approved with revised e-mailed directly to the reviewing engineer. Revise structural plans submitted to City on 11/14/2014. JCM
Routing - Design Review11/12/2014 11/12/2014 PASS
DetailsAndrea Tuning
1st review completed  11/10/2014 FAIL
DetailsJohn Menard
Plan resubmittals requested  11/10/2014 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK11/5/2014 11/10/2014 FAIL
DetailsJohn Menard
Plan resubmittals received  11/10/2014 DONE
DetailsChristina Prado
Received three sets of revised structural calcs, plan sheets marked S-101, SS-211, S-311 as well as three response letters; Plans inserted by arch rep and taken to JCM for further review
Routing - FIRE11/7/2014 11/10/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 11-10-14
Routing - MECHANICAL11/3/2014 11/5/2014 PASS
DetailsTroy James
Routing - PLAN CHECK11/5/2014 11/5/2014 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL10/21/2014 11/5/2014 FAIL
DetailsJohn Menard
sent 1 set of drawings, geot calcs & struc clacs
Plan resubmittals requested  11/5/2014 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLUMBING10/29/2014 11/3/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Erosion and Sediment10/28/2014 10/29/2014 PASS
DetailsEvan Jenkins
SITE PREP INSPECTION REQUIRED. Hawkinson Warehouse - 11,215 SF Warehouse for Recreational Use. NY Canal really close to project
Routing - PUBLIC WORKS10/21/2014 10/28/2014 PASS
DetailsJennifer Bruner
Routing PW Sewer Design10/27/2014 10/28/2014 PASS
DetailsKyle S. Rosenmeyer
Routing PW Solid Waste10/28/2014 10/28/2014 PASS
DetailsPeter J. McCullough
Trash enclosure approved for carts only.

Contact: ###-####
Routing PW Drainage10/27/2014 10/27/2014 PASS
DetailsBrian Murphy
Routing PW Sewer Rating10/27/2014 10/27/2014 PASS
DetailsJennifer Bruner
Routing - Addressing10/21/2014 10/22/2014 PASS
DetailsEmily Dixon
Application received 10/21/201410/21/2014 DONE
DetailsJohn Menard
(F) Reprint permit  10/21/2014 DONE
DetailsCandy A. Nichols
Plans ACCEPTED BY PLAN TECH  10/21/2014 DONE
DetailsCandy A. Nichols
Intake Approval  10/21/2014 PASS
DetailsJohn Menard
Recd Pcfee & Taken To Pln CK  10/21/2014 DONE
DetailsCandy A. Nichols
Pending Assignment by JCM10/21/2014 10/21/2014 DONE
DetailsJohn Menard
Routing - PLANNING Land Div10/21/2014 10/21/2014 PASS
DetailsDave Abo