Permit Information
Permit NumberBLD14-03129
StatusFinaled
Name HOMESERV INC
Site Address 4511 N GLENWOOD ST
Project NameALLSTAR PLUMBING
Customer Number 
ePlanReviewNo
Description
(ALLSTAR PLUMBING – House Conversion) Permit is to convert a 2,620 square foot residence to a new office building. Approval contingent upon adhering to the approved plans on file and CUP14-00041. Work to include: construction of interior nonbearing walls to infill existing wall opening, construct new exterior accessible ramp, installation of new emergency lighting, minor site modifications (under 500 square feet), and finishes in compliance with chapter 8 of the 2009 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/21/20156/29/2015 DONE
DetailsBrittany Hill
First Notice 5/21/20156/10/2015 DONE
Mailed out 6-10-15
BLD-Final5/8/20155/11/20155/11/2015PPASS
DetailsJim Sly
Mike Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  5/11/2015 DONE
Permanent Occupancy  5/11/2015 DONE
FIRE-Final Inspection5/7/20155/8/20155/8/2015APASS
DetailsKatie Marron
Life safety pass. Previous correction items completed satisfactory. "Door to remain unlocked sign.." required for front office exist, building inspector please verify at final.
BLD-Final5/4/20155/5/20155/5/2015ANR
DetailsJim Sly
Phone #: ###-####
FIRE-Final Inspection4/30/20155/1/20155/4/2015AFAIL
DetailsKatie Marron
The following items need to be corrected. Door hardware on the three exit doors to be replaced with keyed bolt and non latching ada compliant hardware. An additional exit sign to be installed in basement per city approved plans. A second fire extinguisher to be provided and hung per note 11 on permit fire code review. Both extinguishers to be inspected and tagged by a certified inspection company.
BLD-Conference1/8/20151/8/20151/8/2015PDONE
DetailsJim Sly
Mike Phone #: ###-####
Issue PAID IN FULL permit  1/7/2015 DONE
OVERRIDE  12/10/2014  
Telephone call  12/10/2014 DONE
called Mark told him we need RP, GC form, and remaining balance
Print Occupancy Form  12/10/2014  
DetailsCandy A. Nichols
Permit Ready to Issue  12/10/2014 DONE
Plan assigned to (TLW)10/24/2014 12/10/2014 PASS
DetailsTim L. Woodard
Level 3 TI - Paper - Glenwood Office Conversion
Routing - PLAN CHECK12/5/2014 12/10/2014 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/10/2014 DONE
Case Summary (BLD)  12/10/2014 DONE
Routing - Design Review12/5/2014 12/5/2014 PASS
DetailsSarah Schafer
Sarah Schafer - DRH04-00293 This design review is no longer valid, however, a DR was not required because of zoning (R-1C). CUP has jurisdiction over exterior changes.
Routing - PUBLIC WORKS  12/4/2014 PASS
DetailsTim L. Woodard
Approved on plan and PW Approval form. I signed off in Tidemark for JKB. TLW
Routing - PLANNING10/27/2014 12/4/2014 PASS
DetailsSusan Riggs
Susan Riggs - CUP14-00041

Approved on plans. I signed off Tidemark for Susan. TLW
Routing - PLAN CHECK12/4/2014 12/4/2014 PASS
DetailsTim L. Woodard
Approved with defered submittal on accessible parking location. TLW
Plan resubmittals received  11/25/2014 DONE
DetailsCandy A. Nichols
received a response for the comments, 2 sets of each sheet-1, 2, 3 & 4-took to Tim W
1st review completed  11/7/2014 DONE
DetailsTim L. Woodard
Routing - FIRE11/5/2014 11/7/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 11-07-14
Routing - PLAN CHECK10/27/2014 11/5/2014 FAIL
DetailsTim L. Woodard
Refer to attached Plan Review Report. TLW
Routing - Erosion and Sediment10/27/2014 10/27/2014 PASS
DetailsEvan Jenkins
Remodel for conversion of a residential building to commercial office per approved plans.
Routing PW Sewer Rating10/27/2014 10/27/2014 PASS
DetailsJennifer Bruner
Routing PW Drainage10/27/2014 10/27/2014 PASS
DetailsBrian Murphy
Plan Reviewer's activity  10/24/2014 DONE
DetailsJason Blais
Emailed applicant and architect to contact ACHD to evaluate if any impact fees are due. Written verification will need to be provided to our Permit Counter prior to the permit being issued.
Routing - Addressing10/24/2014 10/24/2014 PASS
DetailsEmily Dixon
Pending Assignment by JCB10/24/2014 10/24/2014 DONE
DetailsJason Blais
Intake Approval  10/23/2014 PASS
DetailsTim L. Woodard
Application received 10/22/2014