Description
(PROOF EYEWEAR – Historic Foster Bldg – Ste#101) This building is fire sprinklered for story increase and for code trade-offs. To construct interior improvements within the basement (1,734 square feet) and change to occupancy of a 287 square feet area on the 1st story (1,795 square feet) of the Historic Foster Building for a new office / retail occupant. The basement and 1st story will be under the control of a single tenant. Work is to include: enlarge an existing opening in an existing nonbearing wall, create an opening in an existing non-bearing wall, and create a small retail on the first floor. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/12/20151/7/2015 DONE
First Notice 12/22/20141/2/2015 DONE
DetailsChristina Prado
BLD-Final12/12/201412/12/201412/12/2014PPASS
DetailsDave Hannah
BLD-Final12/11/201412/12/201412/12/2014PPASS
DetailsDave Hannah
Jack Phone #: ###-####
Permanent Occupancy  12/12/2014 DONE
DetailsCandy A. Nichols
FIRE-Final Inspection12/3/201412/4/201412/4/2014PPASS
DetailsForrest France
Fire life safety inspection approved pending removal of keyed lock deadbolts at office doors.
Issue PAID IN FULL permit  10/29/2014 DONE
Plan assigned to (TLW)10/22/2014 10/27/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK10/23/2014 10/27/2014 PASS
DetailsTim L. Woodard
1st review completed  10/27/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/27/2014 DONE
Case Summary (BLD)  10/27/2014 DONE
Print Occupancy Form  10/27/2014 DONE
Telephone call  10/27/2014 DONE
DetailsChristina Prado
Called Elizabeth to advise permit is ready pending GC and gave fees due
Permit Ready to Issue  10/27/2014 DONE
DetailsChristina Prado
Application received 10/22/201410/23/2014 DONE
Plans ACCEPTED BY PLAN TECH  10/22/2014 DONE
Recd Pcfee & Taken To Pln CK  10/22/2014 DONE