First Notice | | 3/29/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
BLD-Final | 3/16/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 3/16/2018 | 3/19/2018 | 3/19/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Greg Phone #: ###-####
|
Permanent Occupancy | | | 3/19/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 3/15/2018 | 3/16/2018 | 3/16/2018 | P | NR |
Jim Sly
|
|
|
Edgy Phone #: ###-####
|
FIRE-Final Inspection | 3/15/2018 | 3/16/2018 | 3/16/2018 | A | CANC |
Troy Cobbley
|
|
|
Induct detectors for the smoke dampers are not ready.
Edgy Phone #: ###-####
|
BLD-Final | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | NR |
Jim Sly
|
|
|
Greg Phone #: 208-###-####
|
FIRE-Final Inspection | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide exit sign at the top of the interior room stairs as per plans, provide smoke detector actuation of the smoke dampers as per the IMC and provide testing of the duct smoke detector being utilized for hvac shutdown.
call when on way // Greg Phone #: ###-####
|
BLD-Other | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Jim Sly
|
|
|
Greg-t-bar inspection Phone #: ###-####
|
FIRE-Conference | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Framing/Rough-in | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-#### 1st floor OK.
|
Extend Review Timeline | | | 6/22/2017 | | DONE |
|
|
|
1st approved extension per Adele. See documents
|
BLD-Conference | 6/13/2017 | 6/13/2017 | 6/14/2017 | P | PASS |
Jim Sly
|
|
|
Walk thru with Greg ....Owner. Slow progress but still working.......have almost completed 2nd floor including Electr. painting and carpeting.....1st floor trim and Misc. this work has been completed in the last 4 to 5 months. WIP
|
BLD-Aging Inspection | 9/2/2016 | 9/2/2016 | 9/9/2016 | | PEND |
Jim Sly
|
|
|
WIP
|
BLD-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/9/2016 | | DONE |
Jim Sly
|
|
|
WIP
|
BLD-Framing/Rough-in | 4/19/2016 | 4/19/2016 | 4/20/2016 | P | PART |
Jim Sly
|
|
|
Greg Phone #: ###-#### 2nd floor....OK
|
(F) Reprint permit | | | 1/29/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/29/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/29/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/29/2016 | | DONE |
|
|
|
|
1st review completed | | | 1/22/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/22/2016 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
DO NOT RE-ISSUE - Plan mod fees must be paid in full prior to changing status to ISS
|
Plan assigned to (TLW) | 1/14/2016 | | 1/22/2016 | | PASS |
Tim L. Woodard
|
|
|
Plan Mod. DMA Lighting
|
Routing - Design Review | 1/19/2016 | | 1/20/2016 | | PASS |
Josh Wilson
|
|
|
ok per CZC15-00305
|
Routing - PLAN CHECK | 1/19/2016 | | 1/19/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan Modification Accepted | | | 1/14/2016 | | DONE |
|
|
|
to add siding-assigned tgo Tom W
|
BLD-Conference | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | DONE |
Jim Sly
|
|
|
Greg-meet time 9:30 Phone #: ###-####
|
BLD-Conference | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | DONE |
Jim Sly
|
|
|
Greg// please call before Phone #: ###-####
|
Permit Ready to Issue | | | 12/12/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 12/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 12/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 12/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (TLW) | 10/28/2014 | | 12/10/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 12/10/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/10/2014 | | 12/10/2014 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2014 | | DONE |
|
|
|
|
Routing - MECHANICAL | 12/2/2014 | | 12/3/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/2/2014 | | 12/3/2014 | | FAIL |
Tim L. Woodard
|
|
|
Provide Engineering for Cable Guards. TLW
|
1st review completed | | | 11/14/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/28/2014 | | 11/14/2014 | | FAIL |
Tim L. Woodard
|
|
|
Refer to changemarks on the drawings in E-Plan Review. TLW
|
Routing - FIRE | 10/28/2014 | 10/28/2014 | 11/6/2014 | | PASS |
Scott Arellano
|
|
|
Attached fire code comments to plans.
|
Routing - MECHANICAL | 10/28/2014 | | 10/30/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 10/28/2014 | | 10/29/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/28/2014 | | 10/28/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 10/28/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 10/27/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please upload the completed checklist.
Please provide the required stamping area on the cover sheet.
A pre screen can not be completed untill the completed check list is recieved.
|
Application received | | | 10/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2014 6:13AM
|