Case Summary (BLD) | | | 5/19/2016 | | DONE |
|
|
|
|
BLD-Final | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Dave Hannah
|
|
|
Contact Joey ###-#### Phone #: ###-#### Inspection requested via web by Gary Schacher
|
DOC - Permit Finaled | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 4/29/2016 | 4/29/2016 | 4/29/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Aging Inspection | 4/15/2016 | 4/15/2016 | 4/21/2016 | | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 11/30/2015 | 11/30/2015 | 12/3/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Shaunna Winn
|
BLD-Energy code compliance | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Shaunna Winn
|
BLD-Framing/Rough-in | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Schacher
|
Plan Modification Accepted | | | 10/13/2015 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 10/13/2015 | | 10/13/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 7/10/2015 | 7/13/2015 | 7/13/2015 | A | PASS |
Dave Hannah
|
|
|
Jarrod Phone #: ###-####
|
BLD-Footing | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Dave Hannah
|
|
|
Jared Phone #: ###-####
|
PubWorks Subgrade Approval | 7/6/2015 | 7/6/2015 | 7/6/2015 | | DONE |
Jason C. Taylor
|
|
|
*MAIN LEVEL FOUNDATIONS ONLY NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 6/17/2015 | 6/17/2015 | 6/17/2015 | P | PART |
Dave Hannah
|
|
|
Jared Phone #: ###-#### basement section ok
|
BLD-Footing | 6/8/2015 | 6/9/2015 | 6/9/2015 | P | PART |
Dave Hannah
|
|
|
1:30 Footing Inspection Contact Joey ###-#### Phone #: ###-#### Inspection requested via web by Gary Schacher daylight basement ok to pour
|
PubWorks Subgrade Approval | 6/9/2015 | 6/9/2015 | 6/9/2015 | | DONE |
Jason C. Taylor
|
|
|
* DAYLIGHT BASEMENT ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/17/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2015 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2015 | | DONE |
|
|
|
Left message with receptionist for Gary that permit will expire on the 22nd
|
Expiration Notice | 4/1/2015 | 4/22/2015 | 4/1/2015 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 1/29/2015 | | |
|
|
|
|
Plan assigned to (JG) | 11/3/2014 | 11/3/2014 | 1/29/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 11/19 W L2 Hillside ePlan** Pending fire for fire wall request
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/29/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 1/29/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/22/2015 | | 1/22/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 1/15/2015 | 1/15/2015 | 1/20/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans. Due to the size of this structure, a 1 hour rated fire barrier assembly will be constructed between the garage area and the livable area of the home to create two separate fire areas.
|
Telephone call | | | 1/16/2015 | | DONE |
|
|
|
Sent email to Sarah Brackett at Glancey, Rockwell and Assoc regarding an alternative design approach offered by the Fire Code official to mitigate fire flow concerns.
|
Routing - PLANNING | 1/7/2015 | | 1/7/2015 | | PASS |
Todd Tucker
|
|
|
|
Telephone call | | | 1/2/2015 | | DONE |
|
|
|
Email sent to Sarah Brackett at Glancey Rockwell & Associates requesting Fire Flow documentation as requested by Fire Marshal.
|
Routing - FIRE | 12/24/2014 | 12/24/2014 | 12/30/2014 | | FAIL |
Scott Arellano
|
|
|
Please see attached Fire Code comments.
|
Routing PW Grading-Hillside | 12/30/2014 | | 12/30/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 11/21/2014 | | 12/29/2014 | | FAIL |
Javier Guzman
|
|
|
Pending fire wall request
|
Routing - MECHANICAL | 12/23/2014 | | 12/23/2014 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 11/21/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 11/3/2014 | | 11/21/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 11/3/2014 | 11/3/2014 | 11/6/2014 | | FAIL |
Scott Arellano
|
|
|
Emailed resubmittal items to applicant.
|
Routing PW Grading-Hillside | 11/3/2014 | | 11/5/2014 | | FAIL |
Jason C. Taylor
|
|
|
Please see changemarks in ePlan for comments. Jason Taylor ###-####.
|
Routing - MECHANICAL | 11/3/2014 | | 11/4/2014 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 11/3/2014 | | 11/3/2014 | | FAIL |
Todd Tucker
|
|
|
One of the chimneys is too tall.
|
Routing - PUBLIC WORKS | 11/3/2014 | | 11/3/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 11/3/2014 | | 11/3/2014 | | PASS |
Evan Jenkins
|
|
|
SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE.
Permit for the construction of a new 6861 sq. ft., two story with basement (first story 3906 sq. ft., second story 1325 sq. ft., basement level 1630 sq. ft.) single family dwelling with 7 bedrooms, 5.5 bathrooms, approximately 520 sq. ft. of covered patio/porch and a 1673 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning.
|
Plans ACCEPTED BY PLAN TECH | | | 11/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Override - Parcel Holds | | | 11/3/2014 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - Addressing | 11/3/2014 | | 11/3/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 11/3/2014 | | PASS |
Jason Blais
|
|
|
|
Intake Approval | | | 10/30/2014 | | FAIL |
Christina Prado
|
|
|
Needs engineer stamp and ResCheck
|
Application received | | | 10/24/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 24 2014 2:37PM
|