Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-03162
StatusFinaled
Name AN NGUYEN
Site Address 1474 S ENTERTAINMENT AVE
Project NameSpectrum Nail Spa
Customer Number 
ePlanReviewYes
Description
(Ocean Nail & Spa) Permit for the addition of nail and pedicure stations with associated utilities in existing office space for city Financial BLD07-03253. Scope of work; demolition of two walls, installaion of new soffit and manicure an pedicure station per the approved plans. Interior finish shall meet the requirements of IBC chapter 8. This building is not fire sprinklered. **ajs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/16/20164/14/2016 DONE
Third Notice 1/18/20162/11/2016 DONE
called An- he said he got the form I sent last month filled out and that he will bring it in. I told him I would hold off on sending this notice then.
Third Notice 12/15/20151/13/2016 DONE
called An to discuss matter of not receiving final values- he gave me an updated address and said he would get it filled out/// I also update his address in the directory
Third Notice 11/14/201512/10/2015 DONE
Third Notice 10/17/201511/9/2015 DONE
Third Notice 9/19/201510/12/2015 DONE
sent with letter
Third Notice 8/17/20159/14/2015 DONE
Third Notice 7/18/20158/12/2015 DONE
Third Notice 6/14/20157/9/2015 DONE
sent with letter
Third Notice 5/9/20156/9/2015 DONE
Third Notice 3/8/20155/4/2015 DONE
Second Notice 2/12/20153/3/2015 DONE
DetailsChristina Prado
mailed 3-4-15
First Notice 1/17/20152/2/2015 DONE
DetailsChristina Prado
mailed 2-3-15
BLD-Final1/6/20151/7/20151/7/2015PPASS
DetailsJim Sly
An Ngyne Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection1/6/20151/7/20151/7/2015APASS
DetailsTroy Cobbley
Life safety passed. Owner to provide Occupant Load Sign as designated on the approved plans.
Permanent Occupancy  1/7/2015 DONE
DetailsChristina Prado
Permit Ready to Issue  11/21/2014 DONE
Issue PAID IN FULL permit  11/21/2014 DONE
Print Occupancy Form  11/21/2014 DONE
Plan assigned to (AJS)10/31/201410/31/201411/20/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed 11/13
Routing - PLAN CHECK11/17/2014 11/20/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  11/20/2014 DONE
Routing - PLUMBING11/17/2014 11/17/2014 PASS
DetailsBill VanDegrift
1 Auto vents are not approved for commercial
2 mount rp’s over a drain
Routing - PLAN CHECK11/5/2014 11/13/2014 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  11/13/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE10/31/201410/31/201411/7/2014 PASS
DetailsCraig D. Hanson
NO Report. Subject to field inspection
Routing - PLUMBING10/31/2014 11/5/2014 FAIL
DetailsBill VanDegrift
1) show 3/4 water to water heaters
2) location of floor existing floor sink referred to in note 8
3) note 8 calls for individual 1 1/2" waste lines from pedicure stations, plan shows a common 2".
4) show venting in accordance with ISPC 803
5) r.p. required on both hot and cold to pedicure chairs
6) separate water to P-1 from pedicure chair water.
Routing - MECHANICAL10/31/2014 11/4/2014 PASS
DetailsTroy James
Routing - Addressing10/31/2014 11/3/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/31/2014 10/31/2014 PASS
DetailsBeverly Mountain
Intake Approval  10/31/2014 PASS
Application received  10/24/2014 DONE
Application submitted via PDS Online on Oct 24 2014 3:44PM