Second Notice | | 5/22/2016 | 5/23/2016 | | DONE |
|
|
|
This permit finaled on the web by Kirk Ledbetter
|
First Notice | | 5/2/2016 | 5/12/2016 | | DONE |
|
|
|
Mailed 5-13-16
|
BLD-Final | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
Temporary Occupancy | 4/22/2016 | 7/21/2016 | 4/22/2016 | | DONE |
Brittany Hill
|
|
|
|
Permanent Occupancy | | | 4/22/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspections complete, final fire pump relocation inspections complete, final fire alarm inspections complete. Fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled, cannot complete life fire safety inspection with FIR permit for alarms still in issued status. Fire alarm permit needs to be inspected/finaled before life fire safety inspection can be completed and finaled.
|
BLD-Aging Inspection | 4/4/2016 | 4/4/2016 | 4/4/2016 | | PEND |
Dave Hannah
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/10/2016 | | DONE |
|
|
|
Plan mod
|
(F) Reprint permit | | | 2/10/2016 | | DONE |
|
|
|
|
Override - Condition Holds | | | 2/10/2016 | | |
|
|
|
|
OVERRIDE | | | 2/5/2016 | | |
|
|
|
|
OVERRIDE | | | 2/5/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 1/14/2016 | 1/14/2016 | 2/5/2016 | | PASS |
Carl Westfall
|
|
|
(3rd plan mod 1st review) WASHINGTON FEDERAL
|
Plan resubmittals received | | | 2/5/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/5/2016 | | 2/5/2016 | | PASS |
Carl Westfall
|
|
|
3rd plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2016 | | DONE |
|
|
|
3rd plan mod completed
|
Override - Condition Holds | | | 2/5/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 2/5/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod - ***2-10-16 in documents*** Need Revised certificate of value for issuance
DO NOT RE-ISSUE PERMIT - All fees must be paid in full prior to changing shatus to issued
|
BLD-Aging Inspection | 2/3/2016 | 2/3/2016 | 2/4/2016 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 2/2/2016 | 5/2/2016 | 2/2/2016 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd an extension for the temp c of o good thru 4/30/16
|
Override - Condition Holds | | | 2/2/2016 | | |
|
|
|
|
Routing - FIRE | 1/25/2016 | | 2/1/2016 | | PASS |
Katie Marron
|
|
|
Updated report with plan modification description attached to case. Sprinkler resubmittals are required for the intended modifications.
|
Plan resubmittals requested | | | 2/1/2016 | | DONE |
|
|
|
Revisions to plan mod required.
|
Telephone call | | | 1/29/2016 | | DONE |
|
|
|
called talked Rochel-she tansferred me to Kirk-let him know his temp expires on on 2/3/16-left message on his phone
|
Routing - MECHANICAL | 1/25/2016 | | 1/27/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/19/2016 | | 1/25/2016 | | FAIL |
Carl Westfall
|
|
|
3rd plan mod 1st review completed. Revised drawing required.
|
Routing - Design Review | 1/25/2016 | | 1/25/2016 | | PASS |
Josh Wilson
|
|
|
Ok per CZC16-00008 ANT
|
Plan Modification Accepted | | | 1/19/2016 | | DONE |
|
|
|
ePlanReview workflow received
|
Plan Modification Accepted | | | 1/14/2016 | | DONE |
|
|
|
modifications for planning documents
|
Plan Modification Accepted | | | 1/14/2016 | | DONE |
Christina Prado
|
|
|
some revisions/additional scope drawings that i need to upload for city review. The project is currently has TCO's issued, but has not been finalized due to the fire pump room and a few other minor issues. And now The bank has finally decided to upgrade the IT Room located in the basement, The upgrades include new after hours air units, as well as new electrical work, and some minor architectural improvements, such as paint, insulation, and new lighting. There is also a plan to install a pre-action sprinkler system inside the IT room as part of this project. As part of this project we will also be installing two very small chiller units outside, next to the existing chiller. I have begun the process of applying for a zoning certificate to allow the exterior work to be completed.
|
Temporary Occupancy | 12/17/2015 | 3/16/2016 | 12/17/2015 | | DONE |
Brittany Hill
|
|
|
Ok per Dave H
|
BLD-Final | 11/20/2015 | 11/24/2015 | 11/25/2015 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### 4th floor ok to occ 4th floor
|
FIRE-Final Inspection | 11/20/2015 | 11/24/2015 | 11/24/2015 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete for 4th floor, fire alarm inspections complete for 4th floor. Life fire safety inspection passed/complete for 4th floor.
|
FIRE-Final Inspection | 11/4/2015 | 11/5/2015 | 11/5/2015 | A | PART |
Jim Page
|
|
|
Life fire safety passed/complete for 1st floor.
|
BLD-Final | 11/4/2015 | 11/5/2015 | 11/5/2015 | A | PART |
Mike Jordan
|
|
|
John// for the 1st floor Phone #: ###-####. Ok to occupy 1st. floor.
|
Temporary Occupancy | 11/5/2015 | 2/3/2016 | 11/5/2015 | | DONE |
Carlos Velazquez
|
|
|
|
BLD-Ceiling Grid Inspection | 10/21/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Dave Hannah
|
|
|
4th floor // John Phone #: ###-####
|
BLD-Final | 10/14/2015 | 10/15/2015 | 10/15/2015 | P | PART |
Dave Hannah
|
|
|
John-3rd floor Phone #: ###-#### ok to occ third floor
|
FIRE-Final Inspection | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PART |
Jim Page
|
|
|
Third floor final life fire safety inspection passed/complete
|
CHANGE STATUS TO (ISS) | | | 10/6/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/6/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 10/5/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 10/5/2015 | | DONE |
Christina Prado
|
|
|
*****DO NOT RE-ISSUE******
Plan Mod #2 approved 10/5/15, all requirements met, just need fees paid
|
BLD-Ceiling Grid Inspection | 9/30/2015 | 10/1/2015 | 10/2/2015 | P | PASS |
Dave Hannah
|
|
|
3rd floor // John Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/11/2015 | | 10/2/2015 | | PASS |
Carl Westfall
|
|
|
(1st done) WASHINGTON FEDERAL (Sept 17 - 5 days) plan mod
|
Routing - PLUMBING | 9/11/2015 | | 10/2/2015 | | PASS |
Daryl Spivey
|
|
|
2nd plan mod - Daryl Spivey per plans
|
BLD-Framing/Rough-in | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Mike Jordan
|
|
|
4th floor hardlids for restroom and soffits.
|
BLD-Framing/Rough-in | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | DEFR |
Phil Shearer
|
|
|
John--- inspection for 4th floor Phone #: ###-####. Out of time
|
Routing - PLAN CHECK | 9/11/2015 | | 9/21/2015 | | PASS |
Carl Westfall
|
|
|
2nd plan mod approved
|
Routing - MECHANICAL | 9/11/2015 | | 9/16/2015 | | PASS |
Troy James
|
|
|
2nd plan mod - Troy James
Emergency Generator and duct modifications at 3rd floor
|
BLD-Framing/Rough-in | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | PART |
Jim Sly
|
|
|
4th floor; John Phone #: 509-475- Everything on 4th floor except........Boardroom Elevator lobby Bathrooms.
|
Plan Modification Accepted | | | 9/11/2015 | | DONE |
|
|
|
ePlanReview submission
|
Plan Modification Accepted | | | 9/2/2015 | | DONE |
|
|
|
started workflow
|
BLD-Framing/Rough-in | 9/1/2015 | 9/1/2015 | 9/1/2015 | P | PASS |
Dave Hannah
|
|
|
3rd floor; John Phone #: ###-####
|
BLD-Final | 6/30/2015 | 7/1/2015 | 7/2/2015 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to occ second floor and north half of basement
|
FIRE-Final Inspection | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PART |
Jim Page
|
|
|
Superintendent called in for final on basement level as well as second floor, second floor passed life fire safety, basement level still has sprinkler work in mechanical room to be completeed at later date, basement level with exception to mech room finaled.
|
FIRE-Final Inspection | 6/29/2015 | 6/30/2015 | 6/30/2015 | P | CANC |
Jim Page
|
|
|
Inspection canceled per conversation with John Phone #: ###-####, superintendent of job, items on job need to be corrected/repaired before inspection can be performed.
|
BLD-Ceiling Grid Inspection | 6/19/2015 | 6/19/2015 | 6/19/2015 | P | PASS |
Mike Jordan
|
|
|
2nd floor, would like late; John Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/16/2015 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 6/12/2015 | 6/15/2015 | 6/15/2015 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### basement ok to cover
|
OVERRIDE | | | 6/15/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/15/2015 | | DONE |
|
|
|
Need a revised cert of value // DO NOT REISSUE PLAN MOD
|
Plan assigned to (CJW) | 5/28/2015 | | 6/15/2015 | | PASS |
Carl Westfall
|
|
|
Washington Federal - Plan mod
|
Routing - FIRE | 6/1/2015 | | 6/15/2015 | | PASS |
Katie Marron
|
|
|
No comments
|
Routing - Erosion and Sediment | 6/1/2015 | | 6/3/2015 | | PASS |
Evan Jenkins
|
|
|
Plan Modification: No change to ESC
|
Routing - Design Review | 6/1/2015 | | 6/1/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 5/28/2015 | | 6/1/2015 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
BLD-Ceiling Grid Inspection | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. grid in training rm only.
|
Plan Modification Accepted | | | 5/27/2015 | | DONE |
|
|
|
started workflow
|
BLD-Framing/Rough-in | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Dave Hannah
|
|
|
2nd floor // John Phone #: ###-####
|
BLD-Framing/Rough-in | 5/14/2015 | 5/15/2015 | 5/15/2015 | P | NR |
Jim Storey
|
|
|
John-2nd floor Phone #: ###-####
|
BLD-Framing/Rough-in | 5/4/2015 | 5/5/2015 | 5/6/2015 | P | DONE |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 5/6/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 4/21/2015 | 4/22/2015 | 4/23/2015 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### walls in basement area around meeting rooms
|
BLD-Conference | 4/7/2015 | 4/8/2015 | 4/8/2015 | P | PEND |
Dave Hannah
|
|
|
John-would like a 2:00 meet time Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/22/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/22/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 1/21/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 1/21/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/28/2014 | 11/28/2014 | 1/14/2015 | | PASS |
Carl Westfall
|
|
|
WASHINGTON FEDERAL - Level 3 TI - ePlanReview - (15 days - Dec. 18)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2015 | | DONE |
|
|
|
|
Routing - FIRE | 1/8/2015 | | 1/13/2015 | | PASS |
Scott Arellano
|
|
|
|
Routing - PLAN CHECK | 1/7/2015 | | 1/8/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with red lines after the resubmittal review
|
Routing - PLAN CHECK | 1/7/2015 | | 1/7/2015 | | PASS |
Scott Arellano
|
|
|
*Needs to be signed off by Fire in e-plan review* Attached comments to plans. Emailed revised Fire Code comments to archtitect.
|
Plan resubmittals received | | | 1/7/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/29/2014 | | DONE |
|
|
|
The Architect was on vacation during the week of Christmas so he could not be contacted. Waited to send the drawings back to him until I could discuss the plan review with him on the phone. After the discussion on Monday, Dec 29, the case in ePlan was sent back to him.
|
1st review completed | | | 12/24/2014 | | FAIL |
|
|
|
Failed Fire and Building
|
Routing - PLAN CHECK | 11/28/2014 | | 12/24/2014 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 11/28/2014 | 11/28/2014 | 12/9/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 12-09-14
|
Routing - MECHANICAL | 11/28/2014 | | 12/3/2014 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 11/28/2014 | | 12/2/2014 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC14-00310
|
Routing - Erosion and Sediment | 11/28/2014 | | 12/1/2014 | | PASS |
Evan Jenkins
|
|
|
(WASHINGTON FEDERAL) The demolition & interior remodel of the Basement, 2nd floor, & 4th floor. Also minor work on the 1st & 3rd floor. The project also includes a complete replacement of the existing mechanical system & electrical service to modernize the systems. Another ESC Permit issued that is attached to BLD13-02413
|
Routing - PLUMBING | 11/28/2014 | | 12/1/2014 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 11/28/2014 | | 12/1/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 11/28/2014 | | 12/1/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 11/28/2014 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Adele Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 11/28/2014 | | 11/28/2014 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 11/10/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please upload the zoning certificate required for the exterior door replacement on the 1st floor. If you have any questions about application please contact Sarah Schafer at ###-####. Thank you
|
Application received | | | 10/27/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 27 2014 1:39PM
|