Permit Information
Permit NumberBLD14-03175
StatusFinaled
Name BAKER CONSTRUCTION
Site Address 1001 W IDAHO ST
Project NameWashington Federal
Customer Number 
ePlanReviewYes
Description
(WASHINGTON FEDERAL - BASEMENT, 1ST STORY, 2ND STORY, 3RD STORY, 4TH STORY, AND PENTHOUSE) (2-5-16 PLAN MODIFICATION TO INSTALL COMPUTER EQUIPMENT WITHIN A COMPUTER ROOM LOCATED IN THE BASEMENT. TWO AIR HANDLERS LOCATED WITHIN THE COMPUTER ROOM AND TWO EXTERIOR CHILLERS WILL BE INSTALLED IN CONJUNCTION WITH THIS PLAN MODIFICATION. A SECTION OF WALL WILL BE REMOVED TO CONNECT TWO ROOMS CREATING ONE 597 SQUARE FOOT COMPUTER ROOM. IN ADDITION, A NEW FIRE PUMP AND FIRE PUMP CONTROLLER WILL BE INSTALLED IN A SEPARATE ROOM.) (9-21-15 PLAN MODIFICATION TO RECONFIGURE THE LAYOUT OF THE 3RD STORY.) (6-15-15 PLAN MODIFICATION TO CONSTRUCT A 441 SQUARE FOOT ENCLOSURE HAVING MASONRY WALLS (12 FEET TALL AND 10 INCHES THICK) AND NO ROOF TO SCREEN A NEW DIESEL BACK-UP GENERATOR. THE ENCLOSURE WILL BE LOCATED IN THE SOUTHEAST CORNER OF THE PARCEL. WORK IS TO INCLUDE CONTINUOUS CONCRETE FOOTINGS (3’-9” WIDE BY 2’-0” THICK) AND A CONCRETE SLAB ON GRADE (6” THICK). THE EXTERIOR WALL FINISH WILL BE BRICK VENEER AND STUCCO. THE WALLS ARE DESIGNED BEING FIXED AT THE BOTTOM AND FREE AT THE TOP WITHOUT A DIAPHRAGM AT THE TOP. SPECIAL INSPECTION IS REQUIRED FOR MASONRY AND POST INSTALLED CONCRETE ANCHORS.) To remodel the basement, 1st story, 2nd story, 3rd story, 4th story, and penthouse of an existing office building. Work includes the complete replacement of mechanical systems (except the existing chiller and the existing boilers) and upgrading the existing electrical service and system. Basement work is to include a new air handler unit, an enlarged exhaust air pit at grade, compacted gravel fill and a concrete slab at an existing mechanical pit, steel headers and jambs at widened openings in existing masonry walls, a steel header and steel jambs at a widened opening in an existing concrete wall, a masonry wall infill, concrete floor slabs at plumbing and electrical trenches, interior nonbearing walls, 2 restrooms accessible to the disabled, a 1-hr stairway enclosure extension and poured in place concrete steps, 1-hr mechanical shaft extensions and repairs, new interior doors, new interior windows, suspended acoustical ceilings, millwork, and finishes. Cooking operations within the Pantry that create grease laden vapors or that expose the sewer system to grease are NOT allowed. 1st story work is limited to replacing exterior doors and sidelights. 2nd story work includes interior nonbearing walls, 2 restrooms accessible to the disabled, new drinking fountains, suspended acoustical ceilings, millwork, and finishes. 3rd story work includes a 1-hr shaft extension adjacent to an existing stairway enclosure, the structural support for a new floor system between the 2nd and 3rd stories, and suspended acoustical ceilings. 4th story work includes interior nonbearing walls, 2 restrooms accessible to the disabled, suspended acoustical ceilings, millwork, and finishes. Penthouse work includes a new air handler unit, a new opening in the penthouse floor for a new return air duct, and a concrete floor patch where the old return air duct was located. Special Inspection is required for concrete, bolting, welding, epoxy anchors, and expansion anchors. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13, including quick-response fire sprinkler heads installed throughout the building where required, and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/22/20165/23/2016 DONE
This permit finaled on the web by Kirk Ledbetter
First Notice 5/2/20165/12/2016 DONE
Mailed 5-13-16
BLD-Final4/21/20164/22/20164/22/2016APASS
DetailsDave Hannah
John Phone #: ###-####
Temporary Occupancy4/22/20167/21/20164/22/2016 DONE
DetailsBrittany Hill
Permanent Occupancy  4/22/2016 DONE
FIRE-Final Inspection4/21/20164/21/20164/21/2016PPASS
DetailsJim Page
Final fire sprinkler inspections complete, final fire pump relocation inspections complete, final fire alarm inspections complete. Fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIRE-Final Inspection4/20/20164/20/20164/20/2016PCANC
DetailsJim Page
Inspection request cancelled, cannot complete life fire safety inspection with FIR permit for alarms still in issued status. Fire alarm permit needs to be inspected/finaled before life fire safety inspection can be completed and finaled.
BLD-Aging Inspection4/4/20164/4/20164/4/2016 PEND
DetailsDave Hannah
CHANGE STATUS TO (ISS)  2/10/2016 DONE
Plan mod
(F) Reprint permit  2/10/2016 DONE
Override - Condition Holds  2/10/2016  
OVERRIDE  2/5/2016  
OVERRIDE  2/5/2016  
Plan assigned to (CJW)1/14/20161/14/20162/5/2016 PASS
DetailsCarl Westfall
(3rd plan mod 1st review) WASHINGTON FEDERAL
Plan resubmittals received  2/5/2016 DONE
Routing - PLAN CHECK2/5/2016 2/5/2016 PASS
DetailsCarl Westfall
3rd plan mod approved
PLANS/APPL TAKEN TO FRONT DESK  2/5/2016 DONE
3rd plan mod completed
Override - Condition Holds  2/5/2016  
Permit Ready to Issue  2/5/2016 DONE
DetailsChristina Prado
Plan Mod - ***2-10-16 in documents*** Need Revised certificate of value for issuance

DO NOT RE-ISSUE PERMIT - All fees must be paid in full prior to changing shatus to issued
BLD-Aging Inspection2/3/20162/3/20162/4/2016 PEND
DetailsDave Hannah
Temporary Occupancy2/2/20165/2/20162/2/2016 DONE
DetailsCandy A. Nichols
Jason Blais ok'd an extension for the temp c of o good thru 4/30/16
Override - Condition Holds  2/2/2016  
Routing - FIRE1/25/2016 2/1/2016 PASS
DetailsKatie Marron
Updated report with plan modification description attached to case. Sprinkler resubmittals are required for the intended modifications.
Plan resubmittals requested  2/1/2016 DONE
Revisions to plan mod required.
Telephone call  1/29/2016 DONE
called talked Rochel-she tansferred me to Kirk-let him know his temp expires on on 2/3/16-left message on his phone
Routing - MECHANICAL1/25/2016 1/27/2016 PASS
DetailsTroy James
Routing - PLAN CHECK1/19/2016 1/25/2016 FAIL
DetailsCarl Westfall
3rd plan mod 1st review completed. Revised drawing required.
Routing - Design Review1/25/2016 1/25/2016 PASS
DetailsJosh Wilson
Ok per CZC16-00008 ANT
Plan Modification Accepted  1/19/2016 DONE
ePlanReview workflow received
Plan Modification Accepted  1/14/2016 DONE
modifications for planning documents
Plan Modification Accepted  1/14/2016 DONE
DetailsChristina Prado
some revisions/additional scope drawings that i need to upload for city review. The project is currently has TCO's issued, but has not been finalized due to the fire pump room and a few other minor issues. And now The bank has finally decided to upgrade the IT Room located in the basement, The upgrades include new after hours air units, as well as new electrical work, and some minor architectural improvements, such as paint, insulation, and new lighting. There is also a plan to install a pre-action sprinkler system inside the IT room as part of this project. As part of this project we will also be installing two very small chiller units outside, next to the existing chiller. I have begun the process of applying for a zoning certificate to allow the exterior work to be completed.
Temporary Occupancy12/17/20153/16/201612/17/2015 DONE
DetailsBrittany Hill
Ok per Dave H
BLD-Final11/20/201511/24/201511/25/2015PPART
DetailsDave Hannah
John Phone #: ###-#### 4th floor ok to occ 4th floor
FIRE-Final Inspection11/20/201511/24/201511/24/2015APART
DetailsJim Page
Fire sprinkler inspection complete for 4th floor, fire alarm inspections complete for 4th floor. Life fire safety inspection passed/complete for 4th floor.
FIRE-Final Inspection11/4/201511/5/201511/5/2015APART
DetailsJim Page
Life fire safety passed/complete for 1st floor.
BLD-Final11/4/201511/5/201511/5/2015APART
DetailsMike Jordan
John// for the 1st floor Phone #: ###-####. Ok to occupy 1st. floor.
Temporary Occupancy11/5/20152/3/201611/5/2015 DONE
DetailsCarlos Velazquez
BLD-Ceiling Grid Inspection10/21/201510/22/201510/22/2015PPASS
DetailsDave Hannah
4th floor // John Phone #: ###-####
BLD-Final10/14/201510/15/201510/15/2015PPART
DetailsDave Hannah
John-3rd floor Phone #: ###-#### ok to occ third floor
FIRE-Final Inspection10/14/201510/15/201510/15/2015APART
DetailsJim Page
Third floor final life fire safety inspection passed/complete
CHANGE STATUS TO (ISS)  10/6/2015 DONE
(F) Reprint permit  10/6/2015 DONE
OVERRIDE  10/5/2015  
Permit Ready to Issue  10/5/2015 DONE
DetailsChristina Prado
*****DO NOT RE-ISSUE******
Plan Mod #2 approved 10/5/15, all requirements met, just need fees paid
BLD-Ceiling Grid Inspection9/30/201510/1/201510/2/2015PPASS
DetailsDave Hannah
3rd floor // John Phone #: ###-####
PLANS/APPL TAKEN TO FRONT DESK  10/2/2015 DONE
Plan assigned to (CJW)9/11/2015 10/2/2015 PASS
DetailsCarl Westfall
(1st done) WASHINGTON FEDERAL (Sept 17 - 5 days) plan mod
Routing - PLUMBING9/11/2015 10/2/2015 PASS
DetailsDaryl Spivey
2nd plan mod - Daryl Spivey per plans
BLD-Framing/Rough-in9/21/20159/22/20159/22/2015APASS
DetailsMike Jordan
4th floor hardlids for restroom and soffits.
BLD-Framing/Rough-in9/21/20159/21/20159/21/2015PDEFR
DetailsPhil Shearer
John--- inspection for 4th floor Phone #: ###-####. Out of time
Routing - PLAN CHECK9/11/2015 9/21/2015 PASS
DetailsCarl Westfall
2nd plan mod approved
Routing - MECHANICAL9/11/2015 9/16/2015 PASS
DetailsTroy James
2nd plan mod - Troy James
Emergency Generator and duct modifications at 3rd floor
BLD-Framing/Rough-in9/11/20159/14/20159/14/2015APART
DetailsJim Sly
4th floor; John Phone #: 509-475-
Everything on 4th floor except........Boardroom Elevator lobby Bathrooms.
Plan Modification Accepted  9/11/2015 DONE
ePlanReview submission
Plan Modification Accepted  9/2/2015 DONE
started workflow
BLD-Framing/Rough-in9/1/20159/1/20159/1/2015PPASS
DetailsDave Hannah
3rd floor; John Phone #: ###-####
BLD-Final6/30/20157/1/20157/2/2015PPART
DetailsDave Hannah
John Phone #: ###-#### ok to occ second floor and north half of basement
FIRE-Final Inspection6/30/20157/1/20157/1/2015APART
DetailsJim Page
Superintendent called in for final on basement level as well as second floor, second floor passed life fire safety, basement level still has sprinkler work in mechanical room to be completeed at later date, basement level with exception to mech room finaled.
FIRE-Final Inspection6/29/20156/30/20156/30/2015PCANC
DetailsJim Page
Inspection canceled per conversation with John Phone #: ###-####, superintendent of job, items on job need to be corrected/repaired before inspection can be performed.
BLD-Ceiling Grid Inspection6/19/20156/19/20156/19/2015PPASS
DetailsMike Jordan
2nd floor, would like late; John Phone #: ###-####
CHANGE STATUS TO (ISS)  6/16/2015 DONE
BLD-Ceiling Grid Inspection6/12/20156/15/20156/15/2015PPART
DetailsDave Hannah
John Phone #: ###-#### basement ok to cover
OVERRIDE  6/15/2015  
PLANS/APPL TAKEN TO FRONT DESK  6/15/2015 DONE
Permit Ready to Issue  6/15/2015 DONE
Need a revised cert of value // DO NOT REISSUE PLAN MOD
Plan assigned to (CJW)5/28/2015 6/15/2015 PASS
DetailsCarl Westfall
Washington Federal - Plan mod
Routing - FIRE6/1/2015 6/15/2015 PASS
DetailsKatie Marron
No comments
Routing - Erosion and Sediment6/1/2015 6/3/2015 PASS
DetailsEvan Jenkins
Plan Modification: No change to ESC
Routing - Design Review6/1/2015 6/1/2015 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK5/28/2015 6/1/2015 PASS
DetailsCarl Westfall
Plan mod approved
BLD-Ceiling Grid Inspection5/27/20155/28/20155/28/2015APASS
DetailsMike Jordan
John Phone #: ###-####. grid in training rm only.
Plan Modification Accepted  5/27/2015 DONE
started workflow
BLD-Framing/Rough-in5/18/20155/18/20155/18/2015PPASS
DetailsDave Hannah
2nd floor // John Phone #: ###-####
BLD-Framing/Rough-in5/14/20155/15/20155/15/2015PNR
DetailsJim Storey
John-2nd floor Phone #: ###-####
BLD-Framing/Rough-in5/4/20155/5/20155/6/2015PDONE
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in5/6/20155/6/20155/6/2015APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in4/21/20154/22/20154/23/2015PPART
DetailsDave Hannah
John Phone #: ###-#### walls in basement area around meeting rooms
BLD-Conference4/7/20154/8/20154/8/2015PPEND
DetailsDave Hannah
John-would like a 2:00 meet time Phone #: ###-####
Issue PAID IN FULL permit  1/22/2015 DONE
Print Occupancy Form  1/22/2015 DONE
OVERRIDE  1/21/2015  
Permit Ready to Issue  1/21/2015 DONE
Plan assigned to (CJW)11/28/201411/28/20141/14/2015 PASS
DetailsCarl Westfall
WASHINGTON FEDERAL - Level 3 TI - ePlanReview - (15 days - Dec. 18)
PLANS/APPL TAKEN TO FRONT DESK  1/14/2015 DONE
Routing - FIRE1/8/2015 1/13/2015 PASS
DetailsScott Arellano
Routing - PLAN CHECK1/7/2015 1/8/2015 PASS
DetailsCarl Westfall
Drawings approved with red lines after the resubmittal review
Routing - PLAN CHECK1/7/2015 1/7/2015 PASS
DetailsScott Arellano
*Needs to be signed off by Fire in e-plan review* Attached comments to plans. Emailed revised Fire Code comments to archtitect.
Plan resubmittals received  1/7/2015 DONE
Plan resubmittals requested  12/29/2014 DONE
The Architect was on vacation during the week of Christmas so he could not be contacted. Waited to send the drawings back to him until I could discuss the plan review with him on the phone. After the discussion on Monday, Dec 29, the case in ePlan was sent back to him.
1st review completed  12/24/2014 FAIL
Failed Fire and Building
Routing - PLAN CHECK11/28/2014 12/24/2014 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - FIRE11/28/201411/28/201412/9/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 12-09-14
Routing - MECHANICAL11/28/2014 12/3/2014 PASS
DetailsTroy James
Routing - Design Review11/28/2014 12/2/2014 PASS
DetailsJosh Wilson
Josh Wilson - CZC14-00310
Routing - Erosion and Sediment11/28/2014 12/1/2014 PASS
DetailsEvan Jenkins
(WASHINGTON FEDERAL) The demolition & interior remodel of the Basement, 2nd floor, & 4th floor. Also minor work on the 1st & 3rd floor. The project also includes a complete replacement of the existing mechanical system & electrical service to modernize the systems. Another ESC Permit issued that is attached to BLD13-02413
Routing - PLUMBING11/28/2014 12/1/2014 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - Addressing11/28/2014 12/1/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS11/28/2014 12/1/2014 PASS
DetailsBeverly Mountain
Intake Approval  11/28/2014 PASS
DetailsJason Blais
Prescreen passed by Adele Schaffeld-Griffin and plan review fees paid.
Pending Assignment by JCB11/28/2014 11/28/2014 DONE
DetailsJason Blais
Intake Approval  11/10/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Please upload the zoning certificate required for the exterior door replacement on the 1st floor. If you have any questions about application please contact Sarah Schafer at ###-####. Thank you
Application received  10/27/2014 DONE
Application submitted via PDS Online on Oct 27 2014 1:39PM