BLD-Final | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | PASS |
Mike Jordan
|
|
|
Please call in advance. Thx. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
DOC - Permit Finaled | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | NR |
Mike Jordan
|
|
|
Please call in advance so I can meet you there. ###-#### Thanks Scott Phone #: ###-#### Inspection requested via web by Scott Zierler. Needs blower door test.
|
BLD-Energy code compliance | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 5/1/2015 | 5/4/2015 | 5/4/2015 | P | PASS |
Mike Jordan
|
|
|
Please call when heading over. Thx. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 | P | FAIL |
Mike Jordan
|
|
|
Plans will be above the fireplace. Phone #: ###-#### Inspection requested via web by Scott Zierler. Complete lateral bracing on A4, B1 trusses, Nailbottom chord of B3 truss per engineering, provide h2.5 at truss bearing locations, provide additional stud on eith side of LVL for fron proch or strap. Install post and footing for front porches, 2hr. firewall not continous to roof deck, laydown parapet needs to be installed to rear of unit, need to verifiy 5/8type x rock on soffits, no soffit vents allowed.
|
BLD-Wall Bracing | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Other | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Foundation | 2/17/2015 | 2/18/2015 | 2/18/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
BLD-Footing | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
Override - Parcel Holds | 2/17/2015 | 1/1/1900 | 2/17/2015 | | |
|
|
|
foundation only
|
Override - Parcel Holds | 2/17/2015 | 1/1/1900 | 2/17/2015 | | |
|
|
|
footing inspection only
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 2/6/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 2/6/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/6/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/6/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 1/28/2015 | 1/28/2015 | 2/5/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, Plan Mod site plan sheet
|
Routing - PLAN CHECK | 2/4/2015 | | 2/5/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 2/5/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 2/4/2015 | | 2/4/2015 | | PASS |
Leon Letson
|
|
|
No modulation required.
|
Plan resubmittals received | | | 2/3/2015 | | DONE |
Christina Prado
|
|
|
received two sets of full revised sheets marked A-1, A-2, A-3, A-3a, A-4, A-5, A-6, A-7, E-1 & E-2; Plans stamped and taken to Javier for review
|
Routing - PLAN CHECK | 1/28/2015 | | 1/28/2015 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
Routing PW Flood Plain | 1/28/2015 | | 1/28/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PLANNING | 1/28/2015 | | 1/28/2015 | | FAIL |
Leon Letson
|
|
|
Unit facades must be modulated by a minimum of 4'.
|
Telephone call | | | 1/27/2015 | | DONE |
Candy A. Nichols
|
|
|
received plan mod-2 sheets of A-1 took to JG
|
Override - Parcel Holds | | | 12/15/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 12/12/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 12/12/2014 | | DONE |
Christina Prado
|
|
|
called Scott to advise permit is ready and gave fees due
|
Override - Parcel Holds | | | 12/12/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 12/12/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JG) | 10/28/2014 | 10/28/2014 | 12/11/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 11/07 F L1* Pending Public Works and Floodplain review
|
Routing - PLAN CHECK | 11/26/2014 | | 12/11/2014 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 12/11/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2014 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/10/2014 | | DONE |
Candy A. Nichols
|
|
|
received resubmittals-2 each sheet A1,A-3 & the elevation cert-took to JG
|
Routing - PUBLIC WORKS | 12/10/2014 | | 12/10/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Flood Plain | 12/10/2014 | | 12/10/2014 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PUBLIC WORKS | 11/24/2014 | | 11/26/2014 | | FAIL |
Jennifer Bruner
|
|
|
See floodplain
|
Routing PW Flood Plain | 11/24/2014 | | 11/25/2014 | | FAIL |
Jim Wyllie
|
|
|
For Sheet A-1: Show location of bench mark. The foundation detail is not correct. Revise to show slab-on-grade construction. Show finish grade at foundation on the detail.
For Sheets 3 and 4: Foundation details are not correct. Correct to show slab-on-grade construction.
Submit revised Elevation Certificate showing details for slab-on-grade construction.
(Jim Wyllie / ###-####)
|
Plan resubmittals received | | | 11/24/2014 | | DONE |
Candy A. Nichols
|
|
|
received 2 sets o9f sheet # A-1 , A-3 & A-4-took to Javier G
|
1st review completed | | | 11/7/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 11/6/2014 | | 11/7/2014 | | PASS |
Javier Guzman
|
|
|
Pending Public Works and Floodplain review
|
Routing - PLANNING | 11/5/2014 | | 11/6/2014 | | PASS |
Joshua Johnson
|
|
|
|
Routing - MECHANICAL | 11/6/2014 | | 11/6/2014 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2014 | | 11/5/2014 | | FAIL |
Jennifer Bruner
|
|
|
See Floodplain
|
Routing PW Flood Plain | 10/30/2014 | | 11/5/2014 | | FAIL |
Jim Wyllie
|
|
|
See attached letter. Jim Wyllie / ###-####
|
Routing PW Sewer Rating | 10/30/2014 | | 10/30/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 10/28/2014 | | 10/30/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/28/2014 | | DONE |
|
|
|
|
Intake Approval | | | 10/28/2014 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/28/2014 | | DONE |
|
|
|
|
Application received | | 10/27/2014 | | | |
|
|
|
|