BLD-Final | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | PASS |
Mike Jordan
|
|
|
Please call in advance. Thx. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
DOC - Permit Finaled | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | CANC |
Mike Jordan
|
|
|
Please call in advance so I can meet you. Thanks Scott ###-#### Phone #: ###-#### Inspection requested via web by Scott Zierler. Needs blower door test.
|
BLD-Energy code compliance | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 5/1/2015 | 5/4/2015 | 5/4/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 | P | FAIL |
Mike Jordan
|
|
|
Plans will be above the fireplace Phone #: ###-#### Inspection requested via web by Scott Zierler. Complete lateral bracing on A4, B1 trusses, Nailbottom chord of B3 truss per engineering, provide h2.5 at truss bearing locations, provide additional stud on eith side of LVL for fron proch or strap. Install post and footing for front porches, 2hr. firewall not continous to roof deck, laydown parapet needs to be installed to rear of unit, need to verifiy 5/8type x rock on soffits.
|
BLD-Wall Bracing | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Foundation | 2/17/2015 | 2/18/2015 | 2/18/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
BLD-Footing | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
Override - Parcel Holds | 2/17/2015 | 1/1/1900 | 2/17/2015 | | |
|
|
|
footing inspection only
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
OVERRIDE | | | 2/6/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 2/6/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 2/6/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/6/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/6/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 1/28/2015 | 1/28/2015 | 2/5/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, Plan Mod site plan sheet
|
Routing - PLAN CHECK | 2/4/2015 | | 2/5/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 2/5/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/3/2015 | | DONE |
Christina Prado
|
|
|
received two sets of full revised sheets marked A-1, A-2, A-3, A-3a, A-4, A-5, A-6, A-7, E-1 & E-2; Plans stamped and taken to Javier for review
|
Routing - PLAN CHECK | 1/28/2015 | | 1/28/2015 | | FAIL |
Javier Guzman
|
|
|
emailed applicant plan review report
|
Routing PW Flood Plain | 1/28/2015 | | 1/28/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PLANNING | 1/28/2015 | | 1/28/2015 | | FAIL |
Leon Letson
|
|
|
Unit facades must be modulated by a minimum of 4'.
|
Plan Modification Accepted | | | 1/27/2015 | | DONE |
Candy A. Nichols
|
|
|
recieved plan mod-2 each of sheet # A-1-took to JG
|
Override - Parcel Holds | | | 12/15/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 12/12/2014 | | |
|
|
|
|
Plan assigned to (JG) | 10/28/2014 | 10/28/2014 | 12/12/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 11/07 F L1* Pending Public Works and Floodplain review
|
Routing - PLAN CHECK | 11/26/2014 | | 12/12/2014 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 12/12/2014 | | DONE |
Candy A. Nichols
|
|
|
RECIEVED 1 SHEET OF a-1-TOOK TO jg
|
Case Summary (BLD) | | | 12/12/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2014 | | DONE |
|
|
|
|
Telephone call | | | 12/12/2014 | | DONE |
Christina Prado
|
|
|
called Scott to advise permit is ready adn gave fees due
|
Override - Parcel Holds | | | 12/12/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 12/12/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 12/10/2014 | | DONE |
Candy A. Nichols
|
|
|
received resubmittals-2 each sheet A1,A-3 & the elevation cert-took to JG
|
Routing PW Flood Plain | 12/10/2014 | | 12/10/2014 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PUBLIC WORKS | 12/10/2014 | | 12/10/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PUBLIC WORKS | 11/24/2014 | | 11/26/2014 | | FAIL |
Jennifer Bruner
|
|
|
See floodplain
|
Routing PW Flood Plain | 11/24/2014 | | 11/25/2014 | | FAIL |
Jim Wyllie
|
|
|
For Sheet A-1: Show location of bench mark. The foundation detail is not correct. Revise to show slab-on-grade costruction. Show finish grade at foundation on this detail.
For Sheet A-3 and A-4: Foundation details are not correct. Correct to show slab-ongrade construction.
Submit revised Elevation Certificate showing details for slab-on-grade construction. (Jim Wyllie / ###-####)
|
Plan resubmittals received | | | 11/24/2014 | | DONE |
Candy A. Nichols
|
|
|
received 2 sets of sheet A-1, A-3 & A-4-took to Javier G
|
1st review completed | | | 11/7/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 11/6/2014 | | 11/7/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 11/5/2014 | | 11/6/2014 | | PASS |
Joshua Johnson
|
|
|
|
Routing - MECHANICAL | 11/6/2014 | | 11/6/2014 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2014 | | 11/5/2014 | | FAIL |
Jennifer Bruner
|
|
|
See Floodplain
|
Routing PW Flood Plain | 10/30/2014 | | 11/5/2014 | | FAIL |
Jim Wyllie
|
|
|
See attached letter. Jim Wyllie / ###-####
|
Routing PW Sewer Rating | 10/30/2014 | | 10/30/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 10/28/2014 | | 10/30/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/28/2014 | | DONE |
|
|
|
|
Intake Approval | | | 10/28/2014 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/28/2014 | | DONE |
|
|
|
|
Application received | | 10/27/2014 | | | |
|
|
|
|
Routing - PLANNING | 2/4/2015 | | | | PASS |
Leon Letson
|
|
|
No modulation required
|