Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03179
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 2785 S GATEWOOD LN
Project NameConcord Townhouse
Customer Number 
ePlanReviewNo
Description
***Site plan Modification***Located in the Floodplain***Permit for the construction of a new 1612 sq. ft., one story townhouse with 3 bedrooms, 2 bathrooms, approximately 194 sq. ft. of covered patio/porch and a 500 sq. ft. attached garage per the approved plans,Rescheck, plan review report and any notations. R-1A zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/18/20165/19/20165/19/2016APASS
DetailsMike Jordan
Please call in advance. Thx. Phone #: ###-#### Inspection requested via web by Scott Zierler
DOC - Permit Finaled5/19/20165/19/20165/19/2016PPASS
DetailsMike Jordan
BLD-Final5/17/20165/18/20165/18/2016ACANC
DetailsMike Jordan
Please call in advance so I can meet you. Thanks Scott ###-#### Phone #: ###-#### Inspection requested via web by Scott Zierler. Needs blower door test.
BLD-Energy code compliance5/6/20155/7/20155/7/2015APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Framing/Rough-in5/1/20155/4/20155/4/2015PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Framing/Rough-in4/27/20154/28/20154/28/2015PFAIL
DetailsMike Jordan
Plans will be above the fireplace Phone #: ###-#### Inspection requested via web by Scott Zierler. Complete lateral bracing on A4, B1 trusses, Nailbottom chord of B3 truss per engineering, provide h2.5 at truss bearing locations, provide additional stud on eith side of LVL for fron proch or strap. Install post and footing for front porches, 2hr. firewall not continous to roof deck, laydown parapet needs to be installed to rear of unit, need to verifiy 5/8type x rock on soffits.
BLD-Wall Bracing3/19/20153/19/20153/19/2015PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Foundation2/17/20152/18/20152/18/2015PPASS
DetailsMike Jordan
Heron Phone #: ###-####
BLD-Footing2/17/20152/17/20152/17/2015PPASS
DetailsMike Jordan
Heron Phone #: ###-####
Override - Parcel Holds2/17/20151/1/19002/17/2015  
footing inspection only
OVERRIDE  2/6/2015  
OVERRIDE  2/6/2015  
OVERRIDE  2/6/2015  
OVERRIDE  2/6/2015  
OVERRIDE  2/6/2015  
OVERRIDE  2/6/2015  
OVERRIDE  2/6/2015  
Override - Parcel Holds  2/6/2015  
Permit Ready to Issue  2/6/2015 DONE
(F) Reprint permit  2/6/2015 DONE
CHANGE STATUS TO (ISS)  2/6/2015 DONE
Plan assigned to (JG)1/28/20151/28/20152/5/2015 PASS
DetailsJavier Guzman
1st review completed, Plan Mod site plan sheet
Routing - PLAN CHECK2/4/2015 2/5/2015 PASS
DetailsJavier Guzman
Case Summary (BLD)  2/5/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/5/2015 DONE
Plan resubmittals received  2/3/2015 DONE
DetailsChristina Prado
received two sets of full revised sheets marked A-1, A-2, A-3, A-3a, A-4, A-5, A-6, A-7, E-1 & E-2; Plans stamped and taken to Javier for review
Routing - PLAN CHECK1/28/2015 1/28/2015 FAIL
DetailsJavier Guzman
emailed applicant plan review report
Routing PW Flood Plain1/28/2015 1/28/2015 PASS
DetailsJim Wyllie
Routing - PLANNING1/28/2015 1/28/2015 FAIL
DetailsLeon Letson
Unit facades must be modulated by a minimum of 4'.
Plan Modification Accepted  1/27/2015 DONE
DetailsCandy A. Nichols
recieved plan mod-2 each of sheet # A-1-took to JG
Override - Parcel Holds  12/15/2014  
Issue PAID IN FULL permit  12/15/2014 DONE
OVERRIDE  12/12/2014  
Plan assigned to (JG)10/28/201410/28/201412/12/2014 PASS
DetailsJavier Guzman
1st review completed, 11/07 F L1* Pending Public Works and Floodplain review
Routing - PLAN CHECK11/26/2014 12/12/2014 PASS
DetailsJavier Guzman
Plan resubmittals received  12/12/2014 DONE
DetailsCandy A. Nichols
RECIEVED 1 SHEET OF a-1-TOOK TO jg
Case Summary (BLD)  12/12/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/12/2014 DONE
Inspection Record Card- Bld  12/12/2014 DONE
Telephone call  12/12/2014 DONE
DetailsChristina Prado
called Scott to advise permit is ready adn gave fees due
Override - Parcel Holds  12/12/2014  
Permit Ready to Issue  12/12/2014 DONE
DetailsChristina Prado
Plan resubmittals received  12/10/2014 DONE
DetailsCandy A. Nichols
received resubmittals-2 each sheet A1,A-3 & the elevation cert-took to JG
Routing PW Flood Plain12/10/2014 12/10/2014 PASS
DetailsJim Wyllie
Routing - PUBLIC WORKS12/10/2014 12/10/2014 PASS
DetailsJennifer Bruner
Routing - PUBLIC WORKS11/24/2014 11/26/2014 FAIL
DetailsJennifer Bruner
See floodplain
Routing PW Flood Plain11/24/2014 11/25/2014 FAIL
DetailsJim Wyllie
For Sheet A-1: Show location of bench mark. The foundation detail is not correct. Revise to show slab-on-grade costruction. Show finish grade at foundation on this detail.
For Sheet A-3 and A-4: Foundation details are not correct. Correct to show slab-ongrade construction.
Submit revised Elevation Certificate showing details for slab-on-grade construction. (Jim Wyllie / ###-####)
Plan resubmittals received  11/24/2014 DONE
DetailsCandy A. Nichols
received 2 sets of sheet A-1, A-3 & A-4-took to Javier G
1st review completed  11/7/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK11/6/2014 11/7/2014 PASS
DetailsJavier Guzman
Routing - PLANNING11/5/2014 11/6/2014 PASS
DetailsJoshua Johnson
Routing - MECHANICAL11/6/2014 11/6/2014 PASS
DetailsTroy James
Routing - PUBLIC WORKS10/30/2014 11/5/2014 FAIL
DetailsJennifer Bruner
See Floodplain
Routing PW Flood Plain10/30/2014 11/5/2014 FAIL
DetailsJim Wyllie
See attached letter. Jim Wyllie / ###-####
Routing PW Sewer Rating10/30/2014 10/30/2014 PASS
DetailsJennifer Bruner
Routing - Addressing10/28/2014 10/30/2014 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  10/28/2014 DONE
Intake Approval  10/28/2014 PASS
Recd Pcfee & Taken To Pln CK  10/28/2014 DONE
Application received 10/27/2014   
Routing - PLANNING2/4/2015   PASS
DetailsLeon Letson
No modulation required