Permit Information
Permit NumberBLD14-03213
StatusFinaled
Name GUHO CORP
Site Address 404 S 8TH ST
Project Name8th Street Mercantile
Customer Number 
ePlanReviewYes
Description
(8TH STREET MERCANTILE - SHELL WORK) (5-28-15 PLAN MODIFICATION TO RECONFIGURE TWO SHELL TENANT SPACES, REMOVE TWO 3-HR FIRE CURTAINS, INSTALL A NEW 3-HR FIRE CURTAIN, CONSTRUCT A 3-HR INFILL WALL WITH A 3-HR SIDE-HINGED SELF-CLOSING FIRE DOOR, INSTALL AN INTERIOR RAMP, AND CONSTRUCT AN INTERIOR STEP.) (4-3-15 PLAN MODIFICATION TO ALTER THE PREVIOUSLY APPROVED SUPPORT CONDITION FOR THE NEW STEEL ENTRY CANOPY AT 8TH STREET. TWO SLOPED STEEL RODS WILL BE PROVIDED FOR STABILITY OF THE CANTILEVERED CANOPY.) Fire sprinkler system used to substitute for 1-hr fire-resistance-rated construction. To demolish the existing interior common stairways that serve the 1st story and the basement located at the common 8th Street entrance and to construct new interior stairways in their place. To create 4 tenant shell spaces in the basement, install new double leaf exterior entry doors at the common 8th Street entrance, and to construct a new exterior and interior steel canopy awning above the common 8th Street entrance. Work is to include interior nonbearing walls, interior windows, interior doors, guards, handrails at the new stairways, and finishes. This permit does not establish a Certificate of Occupancy for any tenant. Future tenants must apply for and receive their own individual Certificates of Occupancy. The existing 3-hr fire wall located between the 4 story segment of this building and the 5 story segment of this building is required to be maintained and restored where deficient. The atrium smoke management system is required to be maintained operational per the previously approved design. Special Inspection is required for welding. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/19/20162/2/2016 DONE
This permit finaled on the web by Corinne Guho
Third Notice 12/15/20151/14/2016 DONE
Second Notice 11/19/201512/10/2015 DONE
Mailed 12-11-15
First Notice10/19/201510/19/201511/9/2015 DONE
DetailsDave Hannah
Mailed 11-10-15
BLD-Final10/19/201510/19/201510/19/2015PPASS
DetailsDave Hannah
Boyd-as late as possible-fie and ele insp pm today as well Phone #: ###-####
DOC - Permit Finaled10/19/201510/19/201510/19/2015PPASS
DetailsDave Hannah
FIRE-Final Inspection10/19/201510/19/201510/19/2015PPASS
DetailsJim Page
Life fire safety passed/complete
CHANGE STATUS TO (ISS)  5/29/2015 DONE
Plan assigned to (CJW)5/28/20155/28/20155/28/2015 PASS
DetailsCarl Westfall
Plan Mod - ePlanReview - 8th Street Mercantile
Plan Modification Accepted  5/28/2015 DONE
Routing - PLAN CHECK5/28/2015 5/28/2015 PASS
DetailsCarl Westfall
2nd plan mod approved
PLANS/APPL TAKEN TO FRONT DESK  5/28/2015 DONE
Permit Ready to Issue  5/28/2015 DONE
do not re issue
BLD-Framing/Rough-in5/12/20155/12/20155/13/2015PPASS
DetailsDave Hannah
Stair framing - Boyd Phone #: ###-####
FIRE-Final Inspection5/12/20155/13/20155/13/2015ANR
DetailsKatie Marron
Not ready for life safety inspection. An issued fire alarm permit FIR15-00144 needs to be finaled prior.
Zoning Approval5/12/20155/12/20155/12/2015 DONE
DetailsMatthew A Halitsky
CHANGE STATUS TO (ISS)  5/11/2015 DONE
(F) Reprint permit  5/11/2015 DONE
Plan assigned to (CJW)4/2/20154/2/20154/8/2015 PASS
DetailsCarl Westfall
Plan Mod - ePlanReview - 8th St. Marketplace
Routing - PLAN CHECK4/2/2015 4/8/2015 PASS
DetailsCarl Westfall
Workflow for plan mod submitted April 2.

Routing completed April 8
PLANS/APPL TAKEN TO FRONT DESK  4/8/2015 DONE
Permit Ready to Issue  4/8/2015 DONE
DetailsChristina Prado
DO NOT RE-ISSUE - PLAN MOD #2

Revised certificate of value on line with plans, advise payer of refund process for reduction///cp
Routing - Design Review4/3/2015 4/7/2015 PASS
DetailsSarah Schafer
Sarah
Plan Modification Accepted  3/26/2015 DONE
Started mod workflow but workflow was not completed until April 2.
BLD-Framing/Rough-in3/2/20153/3/20153/3/2015APASS
DetailsDave Hannah
1st thing please - Boyd Phone #: ###-#### stairs and some wall ok to cover
Issue PAID IN FULL permit  3/2/2015 DONE
Inspection Record Card- Bld  3/2/2015 DONE
Plan assigned to (CJW)2/25/2015 2/26/2015 PASS
DetailsCarl Westfall
Routing - PLAN CHECK2/25/2015 2/26/2015 PASS
DetailsCarl Westfall
Plan mod (actually a resubmittal review because the permit had not been issued yet) completed.
Plan Modification Accepted  2/25/2015 DONE
Plan resubmittals received  2/25/2015 DONE
Revised drawings uploaded before permit had been issued.
Plan assigned to (CJW)10/31/201410/31/201412/17/2014 PASS
DetailsCarl Westfall
8TH STREET MERCHANTILE - Level 3 TI - ePlanReview (15 days - Nov 19)
Routing - FIRE12/10/2014 12/17/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Permit Ready to Issue  12/17/2014 DONE
DetailsCandy A. Nichols
need GC and rev cert of val
All requirements met
PLANS/APPL TAKEN TO FRONT DESK  12/17/2014 DONE
DetailsCarl Westfall
Routing - Design Review12/10/2014 12/10/2014 PASS
DetailsMatthew A Halitsky
Routing - PLAN CHECK12/9/2014 12/10/2014 PASS
DetailsCarl Westfall
Drawings approved after the 2nd review
Plan resubmittals received  12/9/2014 DONE
Route to Impact Fee Review11/24/201411/27/201412/1/2014 PASS
DetailsCindy M. Gould
Plan resubmittals requested  11/25/2014 DONE
Plan Reviewer's activity  11/25/2014 DONE
The ePlanReview work flow broke. Delay in getting the project back to the Architect.
1st review completed  11/24/2014 FAIL
Failed Building, Fire, Design Review
Routing - Design Review10/31/2014 11/24/2014 FAIL
DetailsMatthew A Halitsky
Matt Halitsky - DRH14-00310

License agreement needed from ACHD.
Routing - FIRE10/31/201410/31/201411/19/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 11-19-14
Routing - PUBLIC WORKS11/19/2014 11/19/2014 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK10/31/2014 11/18/2014 FAIL
DetailsCarl Westfall
Plan revisions required
Routing - Addressing10/31/2014 11/3/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS10/31/2014 10/31/2014 PASS
DetailsBeverly Mountain
Pending Assignment by JCB10/31/2014 10/31/2014 DONE
DetailsJason Blais
Application received  10/30/2014 DONE
Application submitted via PDS Online on Oct 30 2014 5:37AM
Intake Approval  10/30/2014 PASS
DetailsJason Blais
Prescreen approved by John Menard. Plan Review Fees paid.