BLD-Final | 1/23/2015 | 1/26/2015 | 1/26/2015 | A | PASS |
Jim Sly
|
|
|
Final can be done at any time on Monday. It is easily accessible. Thanks, Rich. Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 11/7/2014 | 11/10/2014 | 11/10/2014 | A | PASS |
Phil Shearer
|
|
|
Marcus will be doing the installation and his cell number is ###-####. MTI has emailed Jason Taylor the results. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
PubWorks Subgrade Approval | 11/10/2014 | 11/10/2014 | 11/10/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/5/2014 | 11/6/2014 | 11/6/2014 | P | CANC |
Phil Shearer
|
|
|
We are getting the subgrade inspection at 2 PM with MTI if you want to be there for that. Jimmy will be doing the installation and his cell number is ###-####. Phone #: ###-#### Inspection requested via web by rich prasch
|
Routing Walk-In (PW Hillside) | 10/31/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Jason C. Taylor
|
|
|
New Roof drainage to tie into existing system. Subgrade inspection is required prior to scheduling footing/column inspection with buildding department. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 10/31/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/31/2014 | 10/31/2014 | 10/31/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 10/31/2014 | 10/31/2014 | 10/31/2014 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 10/31/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/31/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/31/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2014 | | |
|
|
|
|
Application received | | 10/31/2014 | | | |
|
|
|
|