Print Statement | | | 8/26/2015 | | DONE |
Christina Prado
|
|
|
|
Second Notice | | 8/20/2015 | 8/25/2015 | | DONE |
Christina Prado
|
|
|
Completed 8/25/15
|
First Notice | | 7/30/2015 | 8/10/2015 | | DONE |
Christina Prado
|
|
|
Mailed 8/11/15
|
Permanent Occupancy | | | 7/20/2015 | | DONE |
|
|
|
|
BLD-Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PASS |
Mike Jordan
|
|
|
doesn''t open until 9; Curtis Phone #: ###-####. All issues have been resolved. Ok for prm occ.
|
FIRE-Final Inspection | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | NR |
Jim Sly
|
|
|
Nate-fire final to be done AM as well Phone #: ###-#### Need fire final
|
FIRE-Final Inspection | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | CANC |
Troy Cobbley
|
|
|
Per Nate and I's conversation this inspection is to be rescheduled for when the hvac contractor can be on site for the testing of the duct smoke detectors.
|
Telephone call | | | 7/2/2015 | | DONE |
|
|
|
called Nate to let know temp c of o expires on 7/6/15. Nate thought everything was complete. He has an inspection scheduled for 7/6. If by chance they fail he'll ask for an extension.
|
Zoning Approval | 6/30/2015 | 6/30/2015 | 6/30/2015 | | DONE |
David Moser
|
|
|
|
Case Summary (BLD) | | | 6/25/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/25/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/25/2015 | | DONE |
|
|
|
Plan Mod
|
Expiration Notice | 6/15/2015 | 7/7/2015 | 6/15/2015 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 6/8/2015 | | |
|
|
|
|
OVERRIDE | | | 6/8/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 6/2/2015 | 6/2/2015 | 6/8/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Rumbi Island Grill Plan Modification
|
Routing - PLAN CHECK | 6/8/2015 | | 6/8/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 6/8/2015 | | 6/8/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC14-00309
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/8/2015 | | DONE |
|
|
|
DO NOT REISSUE--PLAN MOD
|
Plan Modification Accepted | | | 6/2/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Adele ok'd the plan mod in e plan review-was in temp c of o status
|
BLD-Final | 4/7/2015 | 4/7/2015 | 4/7/2015 | A | PART |
Mike Jordan
|
|
|
Ok for temp occ. Needs to remove manual operated flush bolts from inactive leaf and provide single action locking/unlocking or automatic flush bolts. Inactive leaf has had all door hardware removed and perm. locked until new doors arrive.
|
Temporary Occupancy | 4/7/2015 | 7/6/2015 | 4/7/2015 | | DONE |
Kristal Soland
|
|
|
|
Zoning Approval Temp | 4/7/2015 | 4/7/2015 | 4/7/2015 | | PASS |
David Moser
|
|
|
30-day temp occ for mod of plans to include handrail.
|
BLD-Final | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | NR |
Mike Jordan
|
|
|
Curtis Phone #: ###-####. Fire/life/safety inspection failed.
|
FIRE-Final Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware at the main exit as per approved plans, provide correct annunciator for the duct smoke detector and repair the exit sign at the rear exit. Provide city approved plans.
|
BLD-Conference | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | DONE |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/25/2015 | 3/26/2015 | 3/26/2015 | A | PASS |
Mike Jordan
|
|
|
Curtis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/23/2015 | 3/24/2015 | 3/24/2015 | P | NR |
Mike Jordan
|
|
|
Curtis Phone #: ###-####. Needs electrical rough in inspection.
|
BLD-Framing/Rough-in | 3/5/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Phil Shearer
|
|
|
Curtis Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2015 | 2/27/2015 | 2/27/2015 | P | PART |
Phil Shearer
|
|
|
Bruce Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/27/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/27/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 1/21/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 12/10/2014 | 12/10/2014 | 1/21/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 3 TI - ePlanReview - Rumbi Island Grill
|
Routing Off Site - C.D.H | 1/13/2015 | | 1/21/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/21/2015 | | DONE |
|
|
|
|
Routing - PLUMBING | 1/13/2015 | | 1/20/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - MECHANICAL | 1/13/2015 | | 1/14/2015 | | PASS |
Troy James
|
|
|
Unable to verify any mechanical changes.
|
Routing - PLAN CHECK | 1/13/2015 | | 1/14/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - C.D.H | 12/10/2014 | | 1/2/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/10/2014 | | 12/26/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 12/26/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 12/11/2014 | | 12/22/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 12/11/2014 | | 12/22/2014 | | PASS |
Rick Christenson
|
|
|
Approved per plumbing approval of proper grease interceptor.
TA-2/2/15-Spoke to Myers Plumbing, no room for 1550-gal GI, approved point source under triple sink.
|
Routing - FIRE | 12/10/2014 | 12/10/2014 | 12/17/2014 | | PASS |
Craig D. Hanson
|
|
|
Attached comments to plans. Plans are approved with red lined comments.
|
Routing - Design Review | 12/10/2014 | | 12/17/2014 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC14-00309
|
Routing - Erosion and Sediment | 12/10/2014 | | 12/12/2014 | | PASS |
Evan Jenkins
|
|
|
Exterior patio
(RUMBI ISLAND GRILL) Remodel in a 2,590 s.f. tenant space to a new assembly restaurant use in existing building per approved plans.
|
Routing - MECHANICAL | 12/10/2014 | | 12/12/2014 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 12/10/2014 | | 12/11/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 12/11/2014 | | 12/11/2014 | | PASS |
Beverly Mountain
|
|
|
|
Plan Reviewer's activity | | | 12/10/2014 | | DONE |
Jason Blais
|
|
|
Emailed architect to contact ACHD for evaluation of any impact fees due. Our Permit Counter will need written verification from ACHD prior to the permit being issued. Also indicated for him to contact CDHD.
|
Plan Reviewer's activity | | | 12/10/2014 | | DONE |
Jason Blais
|
|
|
No ACHD impact fees due. Per email below:
ACHD has no additional impact fees and no inspection required for 8675 Franklin Road because this site is located within a “shopping center”.
Thanks,
Christy
Christy Little
Program Administrator
Development Services
###-####
|
Routing - PLUMBING | 12/10/2014 | | 12/10/2014 | | PASS |
Bill VanDegrift
|
|
|
Install DCVA on water service and vent grease interceptor. Install per ISPC. usae city of boise approved interceptor design.
|
Routing - Addressing | 12/10/2014 | | 12/10/2014 | | PASS |
Emily Dixon
|
|
|
|
Pending Assignment by JCB | 12/10/2014 | | 12/10/2014 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 12/8/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Madsen and plan review fees paid.
|
Intake Approval | | | 11/7/2014 | | FAIL |
|
|
|
Please provide the following items.
1,Owner of record signature on the registerd design professional form 304.
2. Approval letter from planning and zoning for exterior modifications to the building. (storefront modifications).
3. Stie specific fire flow letter.
4. Indicate on the plans the extent and location of concrete saw cutting. (ESC permit and waiver letter may be required).
5. Exterior elevations for storefront modofications.
6. Roof plans. (new mechanical units are being added to the roof) provide required engineering and calculations for the additional roof load.
|
Application received | | | 11/6/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2014 10:56AM
|