Third Notice | | 4/20/2016 | 5/9/2016 | | DONE |
|
|
|
This permit finaled on the web by Carrie Van Houten
|
Third Notice | | 3/15/2016 | 4/15/2016 | | DONE |
|
|
|
|
Second Notice | | 3/7/2016 | 3/10/2016 | | DONE |
|
|
|
Mailed 3-11-16
|
First Notice | | 1/14/2016 | 2/26/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/4/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/4/2016 | | DONE |
|
|
|
|
BLD-Final | 12/31/2015 | 12/31/2015 | 12/31/2015 | P | PASS |
Mike Jordan
|
|
|
Kary Phone #: ###-####. Ok for perm occ. Hand rail has been repaired and is now code compliant.
|
BLD-Final | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | NR |
Jim Sly
|
|
|
Carrie Phone #: ###-#### Caulking OK.....Handrail not. E mailed you Special insp.......
|
BLD-Final | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Carrie Van Houten. Ok for temp occ. Need final letter from special inspection agency, provide a code compliant handrail on stairs at exterior exit from fire riser room, fire caulk penetrations in 1hr. ceiling assembly in fire riser room. No card to sign.
|
Temporary Occupancy | 11/25/2015 | 2/23/2016 | 11/25/2015 | | DONE |
Brittany Hill
|
|
|
|
Print Occupancy Form | | | 11/25/2015 | | DONE |
|
|
|
|
Zoning Approval | 11/24/2015 | 11/24/2015 | 11/24/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 11/22/2015 | 11/23/2015 | 11/23/2015 | P | NR |
Mike Jordan
|
|
|
Fire Life Safety Final Inspection has also been requested for Monday afternoon Phone #: ###-#### Inspection requested via web by Carrie Van Houten. Needs zoning and public work final inspections.
|
FIRE-Final Inspection | 11/22/2015 | 11/23/2015 | 11/23/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Conference | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | DONE |
Troy Cobbley
|
|
|
Superintendant and I went over life safety requirements
|
BLD-Ceiling Grid Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Mike Jordan
|
|
|
Rocko Phone #: ###-####
|
BLD-Other | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Mike Jordan
|
|
|
Sheet rock // Rocko Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | PASS |
Mike Jordan
|
|
|
Rocko Phone #: ###-####. Interior steel stud framed walls and hardlids for restrooms.
|
BLD-Framing/Rough-in | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | DONE |
Mike Jordan
|
|
|
roof area; Rocko Phone #: ###-####. reviewed special inspection reports.
|
BLD-Other | 6/17/2015 | 6/17/2015 | 6/17/2015 | P | DEFR |
Mike Jordan
|
|
|
Special inspector on site.
|
BLD-Foundation | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | CANC |
Mike Jordan
|
|
|
CMU wall; Rocko Phone #: ###-####. Moved to pm.
|
BLD-Foundation | 5/22/2015 | 5/22/2015 | 5/22/2015 | P | PASS |
Phil Shearer
|
|
|
Rocko-stem wall Phone #: ###-####
|
BLD-Foundation | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | NR |
Phil Shearer
|
|
|
Rocko-stem wall Phone #: ###-####
|
BLD-Footing | 5/12/2015 | 5/13/2015 | 5/13/2015 | P | PASS |
Mike Jordan
|
|
|
Rocko Phone #: ###-####. Special inspector also on site.
|
OVERRIDE | | | 4/15/2015 | | |
|
|
|
|
Expiration Notice | 4/15/2015 | 5/6/2015 | 4/15/2015 | | DONE |
Brittany Hill
|
|
|
|
Permit Ready to Issue | | | 4/15/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/15/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/15/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/6/2015 | | 2/6/2015 | | PASS |
Carl D Madsen
|
|
|
Racking calculatins were provided
|
Routing - PLAN CHECK | 2/6/2015 | | 2/6/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/6/2015 | | |
|
|
|
Revised Value and GC form needed. Do NOT issue without BLD14-03502
|
Place hold on job | 2/6/2015 | | 2/6/2015 | | DONE |
Brittany Hill
|
|
|
Do NOT issue without BLD-14-03502
|
Telephone call | | | 2/6/2015 | | DONE |
|
|
|
Spoke with Steve - Rec'd updated values for both permits and confirmed his client will be paying ACHD directly. Gave fees due
|
Plan assigned to (CDM) | 11/14/2014 | | 2/6/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing Off Site - STRUCTURAL | 11/14/2014 | | 2/4/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Solid Waste | 11/17/2014 | | 2/4/2015 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLAN CHECK | 2/4/2015 | | 2/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 2/2/2015 | 2/2/2015 | 2/3/2015 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to case.
|
Routing - Design Review | 1/22/2015 | | 1/22/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLUMBING | 1/22/2015 | | 1/22/2015 | | PASS |
Bill VanDegrift
|
|
|
1) rp required on hosebibs in the shop
2) vent floor sink at water service
3) interceptor vent may not tie to sanitary sewer vents
|
Routing PW Environmental | 11/17/2014 | | 12/29/2014 | | PASS |
Rick Christenson
|
|
|
Per plumbing requirement of flammable liquids interceptor design
|
Route to Impact Fee Review | 12/8/2014 | 12/11/2014 | 12/9/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 11/14/2014 | | 12/8/2014 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/8/2014 | | FAIL |
|
|
|
|
Routing - FIRE | 11/14/2014 | | 12/1/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 12-01-14
|
Routing PW Drainage | 11/17/2014 | | 12/1/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 11/17/2014 | | 11/18/2014 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing PW Sewer Rating | 11/17/2014 | | 11/17/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 11/14/2014 | | 11/17/2014 | | FAIL |
Andrea Tuning
|
|
|
Install a Class II tree in each of the interior planter islands.
|
Routing - PUBLIC WORKS | 11/14/2014 | | 11/17/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLUMBING | 11/14/2014 | | 11/17/2014 | | FAIL |
Daryl Spivey
|
|
|
1) all water to shop area to be protected with a reduced pressure principle backflow preventer.
2) Vents up stream of the flammable liquids interceptor may not tie to sanitary sewer venting systems.
3) use approved flammable liquids interceptor design
4) trap primer required. mechanical devices are prohibited.
|
Routing - PLANNING Land Div | 11/14/2014 | | 11/17/2014 | | PASS |
Dave Abo
|
|
|
Parcel A of ROS 9902.
|
Routing - Addressing | 11/14/2014 | | 11/14/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 11/14/2014 | | PASS |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 11/14/2014 | | 11/14/2014 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE) Discount Tire Store - Construction new one story retail tire store with site work
|
Application received | | | 11/6/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2014 3:25PM
|
Pending Assignment by JCM | 11/14/2014 | | | | |
John Menard
|
|
|
|