Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03302
StatusFinaled
Name Greg Cardenalli
Site Address 4663 S ENTERPRISE ST
Project NameUltimate Logistics, LLC
Customer Number 
ePlanReviewYes
Description
(ULTIMATE LOGISTICS LLC & AMERICAN PETROLEUM ENVIRONMENTAL SERVICES INC.) A partial change in use from office, storage and maintenance to office and truck repair within an existing building. Work to include the modification of one exiting overhead door incrasing the height from 12' to 14' moving the existing header up 2 feet. This is a fully fire sprinklered building. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/14/201511/17/2015 DONE
DetailsChristina Prado
completed 11-17-15
Second Notice 10/22/201511/9/2015 DONE
DetailsChristina Prado
Mailed 11-10-15
First Notice 10/4/201510/12/2015 DONE
Mailed 10-13-15
Print Occupancy Form  9/24/2015 DONE
Permanent Occupancy  9/24/2015 DONE
BLD-Final9/21/20159/22/20159/22/2015APASS
DetailsJim Storey
Greg Phone #: ###-#### ok per fire suppervisor exit hardware
BLD-Final9/17/20159/21/20159/21/2015ANR
DetailsJim Storey
Greg Phone #: ###-#### need front door hardware rolled over
FIRE-Final Inspection9/16/20159/17/20159/17/2015APASS
DetailsTroy Cobbley
Life safety passed. I let greg know that the thumbturn dead bolt will need to be removed prior to a building sign off as discussed.
BLD-Final9/16/20159/16/20159/16/2015PNR
DetailsJim Storey
Greg Phone #: ###-####
FIRE-Final Inspection9/16/20159/16/20159/16/2015PFAIL
DetailsTroy Cobbley
Provide annual inspection for the fire extinguishers, provide NFPA signage for the oil storage, remove the thumbturn deadbolt (keyed is ok)
BLD-Final9/9/20159/10/20159/10/2015ANR
DetailsJim Storey
Greg Phone #: ###-####
FIRE-Final Inspection9/9/20159/9/20159/9/2015PFAIL
DetailsTroy Cobbley
Need city approved plans and small documents. I noted that the fire alarm panel in in a "trouble" condition, in-operative exit/emergency lighting and missing/expired fire extinguishers. Greg provided fire sprinkler plans that addressed the raising of the two overhead doors and the hydraulic calculations showed a design for "auto repair shop".
Print Occupancy Form  9/9/2015 DONE
DetailsChristina Prado
Print Occupancy Form  9/9/2015 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  9/9/2015 DONE
DetailsChristina Prado
Telephone call  8/21/2015 DONE
see email from Amy about signed consent for tenant being the GC-waiting for an update from Amy to see if she's ok with the tenant doing his own work,
Telephone call  8/20/2015 DONE
customer came in but we're wating for a few items before we can do fees and issue. We need a letter from Amy Tyler stating it's ok for Greg Cardenalli to be his own GC, GC form & rev cert of val.
I talked to him at the counter not by phone
Permit Ready to Issue  8/20/2015 DONE
see phone call for notes of what we need
Extend Review Timeline  4/29/2015 DONE
180 days granted by JCB. See attached documents
Expiration Notice4/15/20155/6/20154/15/2015 DONE
DetailsBrittany Hill
Plan assigned to (CDM)11/10/201411/10/201412/3/2014 PASS
DetailsCarl D Madsen
Level 3 TI - ePlanReview - Ultimate Logistics LLC
First review completed.
Routing PW Environmental11/10/2014 12/3/2014 PASS
DetailsRick Christenson
signed off per Eplan
Routing - MECHANICAL12/3/2014 12/3/2014 PASS
DetailsTroy James
Routing - PLAN CHECK12/3/2014 12/3/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  12/3/2014 DONE
Routing - MECHANICAL11/21/2014 11/21/2014 FAIL
DetailsTroy James
Letter provided by tenant does not answer the questions or have the required signatures as requested by Bill. This email was sent from Bill to Matt Reese as an alternate acceptance as mandated by Jenifer Gililand to not comply with code.
1st review completed  11/19/2014 FAIL
Routing - PLAN CHECK11/10/2014 11/19/2014 FAIL
DetailsCarl D Madsen
Need clarification on the scope of work. are the modifications to the two verhead doors to be included in this permit as there is another permit in the system for the overhead doors.
Routing - FIRE11/10/201411/10/201411/18/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 11-18-14
Routing - MECHANICAL11/10/2014 11/17/2014 FAIL
DetailsTroy James
eplan
Need source capture system design for vehicle exhuast.
Routing - PLUMBING11/10/2014 11/13/2014 PASS
DetailsBill VanDegrift
No review required
Plan Reviewer's activity  11/10/2014 DONE
DetailsJason Blais
Emailed architect to contact ACHD to determine if any additional impact fees are due. Written verification from ACHD needs to be provided to our Permit Counter prior to the building permit being issued.
Routing - Addressing11/10/2014 11/10/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS11/10/2014 11/10/2014 PASS
DetailsJennifer Bruner
Pending Assignment by JCB11/10/2014 11/10/2014 PASS
DetailsJason Blais
Intake Approval  11/7/2014 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Application received  11/6/2014 DONE
Application submitted via PDS Online on Nov 6 2014 4:35PM