Third Notice | | 12/15/2015 | 12/11/2015 | | DONE |
|
|
|
This permit finaled on the web by frank sexton
|
Third Notice | | 11/14/2015 | 12/10/2015 | | DONE |
|
|
|
|
Second Notice | | 10/22/2015 | 11/9/2015 | | DONE |
|
|
|
Mailed 11-10-15
|
First Notice | | 10/4/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15
|
PubWorks Occupancy Approval | 9/28/2015 | 9/28/2015 | 9/28/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Jim Sly
|
|
|
Frank-pleae call 30 minutes prior to meet Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 9/24/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 9/23/2015 | 9/23/2015 | 9/23/2015 | | PASS |
David Moser
|
|
|
|
Override - Parcel Holds | | | 9/23/2015 | | |
|
|
|
|
BLD-Final | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | NR |
Jim Sly
|
|
|
customer will be there, but call if you need to Phone #: ###-#### Need ACHD P/W Zone and Fire.
|
BLD-Energy code compliance | 6/11/2015 | 6/11/2015 | 6/12/2015 | P | PASS |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
BLD-Framing/Rough-in | 5/26/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Jim Sly
|
|
|
Shear // Frank Phone #: ###-#### Shear and Framing OK.
|
BLD-Wall Bracing | 4/21/2015 | 4/23/2015 | 4/23/2015 | A | PART |
Jim Sly
|
|
|
Tim Phone #: ###-#### Should be foundation wall......wall OK.
|
BLD-Footing | 4/21/2015 | 4/22/2015 | 4/22/2015 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Conference | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | DONE |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
OVERRIDE | | | 3/2/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 2/27/2015 | | |
|
|
|
|
Print Occupancy Form | | | 2/27/2015 | | DONE |
|
|
|
|
Telephone call | | | 2/27/2015 | | DONE |
Candy A. Nichols
|
|
|
called to let know permit is ready and taht we need the rev cert of val from the GC-left message
|
Routing - PLAN CHECK | 2/27/2015 | | 2/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 2/27/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/27/2015 | | DONE |
|
|
|
Need a Revised Value
|
Plan assigned to (CDM) | | | 2/27/2015 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Plan resubmittals received | | | 2/26/2015 | | DONE |
|
|
|
Three copies of U2.0 taken to Carl M
|
Routing - PLAN CHECK | 12/19/2014 | | 2/6/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/6/2015 | | 2/6/2015 | | FAIL |
Carl D Madsen
|
|
|
Called Robin Gates and discussed the rated penetrations for the corridor ceiling and shee will provide a double layer sheetrock box detail for the can lights and verify if the 2 x 4 fixture is recessed or surface mount. She will also provide a mechanical com-check. CDM 2-6-15
|
Plan resubmittals received | | | 2/2/2015 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plans marked A2.0, A4.0, S2.0 & U2.0 as well as three response letters and three heat calcs; Plans stamped and taken to Carl M for review
|
Route to Impact Fee Review | 12/19/2014 | 12/22/2014 | 12/23/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 12/16/2014 | | 12/19/2014 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown. No change in fire flow requirements, or FD vehicle access. No separate comments attached to plans.
|
Routing - PLAN CHECK | | | 12/16/2014 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/16/2014 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - Erosion and Sediment | 11/17/2014 | | 11/18/2014 | | PASS |
Evan Jenkins
|
|
|
The Church of Christ (Classroom addition)
720 SF Classroom Addition in the rear of the property: Minimal Earth Disturbance. 20' x 36' foundation and slab
|
Plan resubmittals received | | | 11/18/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A2.0;Plans taken to CDM for further review
|
Routing PW Drainage | 11/12/2014 | | 11/17/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 11/17/2014 | | 11/17/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | | | 11/12/2014 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 11/10/2014 | | 11/10/2014 | | PASS |
David Moser
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 11/10/2014 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 11/10/2014 | | | |
|
|
|
|
Pending Assignment by JCM | | | | | |
John Menard
|
|
|
|