BLD-Final | 6/18/2015 | 6/22/2015 | 6/22/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 6/22/2015 | 6/22/2015 | 6/22/2015 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 6/18/2015 | 6/18/2015 | 6/18/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Need fire blocking behind wine bar.
|
BLD-Other | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Phil Shearer
|
|
|
Sofet // Clint Phone #: ###-####
|
BLD-Wall Bracing | 3/18/2015 | 3/19/2015 | 3/19/2015 | A | PASS |
Phil Shearer
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 2/10/2015 | 2/10/2015 | 2/10/2015 | P | PASS |
Phil Shearer
|
|
|
pour time 2:30 Phone #: ###-#### Inspection requested via web by tony L
|
BLD-Footing | 2/9/2015 | 2/10/2015 | 2/10/2015 | A | PASS |
Phil Shearer
|
|
|
Wes Phone #: ###-####
|
PubWorks Subgrade Approval | 2/9/2015 | 2/9/2015 | 2/9/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 1/23/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/25/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 11/25/2014 | | DONE |
Christina Prado
|
|
|
Called Tahoe to advise permit is ready adn gave fees due
|
Permit Ready to Issue | | | 11/25/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 11/10/2014 | 11/24/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/19/2014 | | 11/24/2014 | | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 11/19/2014 | | 11/24/2014 | | DONE |
Tisha Gallop
|
|
|
11/26 W L2 Hillside** (check if this is reduced hillside fees)
|
1st review completed | | | 11/24/2014 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2014 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 11/24/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/24/2014 | | DONE |
|
|
|
|
Plan assigned to (JG) | | 11/12/2014 | 11/19/2014 | | DEFR |
Javier Guzman
|
|
|
11/26 W L2 Hillside** (check if this is reduced hillside fees)
|
Routing - FIRE | 11/18/2014 | | 11/19/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department Vehicle Access.
|
Routing - MECHANICAL | 11/14/2014 | | 11/18/2014 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 11/18/2014 | | 11/18/2014 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
WUI Zone A, Class A Roof, Permit for the construction of a new 2372 sq. ft., two story (first story 1106 sq. ft., second story 1266 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 72 sq. ft. of covered patio/porch and a 629 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning.
|
Routing - PLANNING | 11/13/2014 | | 11/14/2014 | | PASS |
Joshua Johnson
|
|
|
|
Routing - Addressing | 11/12/2014 | | 11/13/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 11/13/2014 | | 11/13/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 11/13/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 11/12/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/12/2014 | | PASS |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/12/2014 | | DONE |
Christina Prado
|
|
|
|