Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-03331
StatusFinaled
Name NICOLE LEFAVOUR
Site Address 970 N CLITHERO DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(Plan Modification; relocate Kitchen from upper portion to lower portion of structure. *BJM*) This permit is for the construction of a new 296s.f. 1-story single family dwelling. The main level will consist of 149s.f. room that includes sleeping, living and kitchen area. There is a lower level living area of 147s.f. of habitable area that includes an 18s.f. bathroom. The main level is accessed by a code complying dwelling egress door and the lower level is accessed by an interior stair and an exterior stairway. R-1C setbacks ok per Sue Cummings per the redlined site plan. All per the approved plans as marked, Engineering, Energy “prescriptive” method along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/201810/17/201810/17/2018APASS
DetailsDave Hannah
Nicole Phone #: ###-####
DOC - Permit Finaled10/17/201810/17/201810/17/2018PPASS
DetailsDave Hannah
BLD-Final7/1/20167/1/20167/1/2016PPEND
DetailsDave Hannah
Nicole// please call before Phone #: ###-#### returns on handrail and post adress
BLD-Final5/23/20166/3/20166/3/2016PNR
DetailsPhil Shearer
Nicole Phone #: ###-####
BLD-Aging Inspection2/24/20162/24/20162/25/2016 PEND
DetailsTony Young
BLD-Aging Inspection2/23/20162/23/20162/24/2016 PEND
DetailsTony Young
BLD-Energy code compliance10/9/201510/12/201510/12/2015APASS
DetailsTony Young
Nicole Phone #: ###-####,, work in progress
BLD-Energy code compliance10/9/201510/9/201510/9/2015PPART
DetailsTony Young
Nicole Phone #: ###-####,, work in progress
BLD-Energy code compliance10/8/201510/9/201510/9/2015APEND
DetailsTony Young
Nicole Phone #: ###-####
BLD-Energy code compliance10/8/201510/8/201510/8/2015PNR
DetailsTony Young
Nicole Phone #: ###-####,, roof area ok,, need mechanical pass
BLD-Framing/Rough-in9/28/20159/29/20159/29/2015PPART
DetailsTony Young
would like call ahead; Nicole Phone #: ###-####,, will need a mechanical permit if you put in a bath fan or dryer vent or a kitchen vent,, ok to insulate the walls
Issue PAID IN FULL permit  9/4/2015 DONE
OVERRIDE  8/25/2015  
Routing Walk-In (BLD)8/12/20158/12/20158/25/2015PPASS
DetailsBrian McGowan
Plan assigned to (BJM)8/12/20158/12/20158/25/2015 DONE
DetailsBrian McGowan
Applicant was asked to provide existing permitted plans for us to copy and refer to.
Routing - PLAN CHECK8/12/2015 8/25/2015 PASS
DetailsBrian McGowan
plans reviewed by Brian
Case Summary (BLD)  8/25/2015 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  8/25/2015 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/25/2015 DONE
plan mod ready please do not re issue
Telephone call  8/25/2015 DONE
called Nicole to let know plan mod was ready and how much is owed
Plan Modification Accepted  8/12/2015 DONE
received (2) sets of Site Plans and Structural plans
BLD-Framing/Rough-in3/23/20153/23/20153/23/2015PNR
DetailsPhil Shearer
Nicole-call or text prior to meet Phone #: ###-####
Routing Walk-In (BLD)12/30/201412/30/201412/30/2014PPASS
DetailsPerry Paine
QUESTIONS ABOUT INTERIOR LAYOUT
BLD-Foundation12/11/201412/12/201412/12/2014PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Footing12/10/201412/11/201412/11/2014PPASS
DetailsDave Hannah
Dane Phone #: ###-####
BLD-Footing12/9/201412/10/201412/10/2014PNR
DetailsTony Young
Dane Phone #: ###-####
Routing Walk-In (BLD)12/1/201412/1/201412/1/2014PPASS
DetailsPerry Paine
spoke about possible plan modifications
Route to Impact Fee Review11/18/201411/21/201412/1/2014 PASS
DetailsCindy M. Gould
OVERRIDE  11/28/2014  
Routing Walk-In (BLD)11/28/201411/28/201411/28/2014ADONE
DetailsPerry Paine
reviewed changes to plan added s.f. no added value.
PLANS/APPL TAKEN TO FRONT DESK  11/28/2014 DONE
Inspection Record Card- Bld  11/28/2014 DONE
Permit Ready to Issue  11/28/2014 DONE
Issue PAID IN FULL permit  11/28/2014 DONE
Routing Walk-In (BLD)11/24/201411/24/201411/25/2014APASS
DetailsPerry Paine
submitted new plan sheet. 11/25/2014 12:15p.m.
OVERRIDE  11/19/2014  
Routing Walk-In (BLD)11/19/201411/19/201411/19/2014APASS
DetailsPerry Paine
PLANNING ON CHANGING PLAN RESUBMITTALS COMING
Plan assigned to (PEP)11/14/201411/14/201411/19/2014 PASS
DetailsPerry Paine
Routing - PLAN CHECK11/14/2014 11/19/2014 PASS
DetailsPerry Paine
1st review completed  11/19/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/19/2014 DONE
Inspection Record Card- Bld  11/19/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  11/19/2014 DONE
DetailsCandy A. Nichols
Telephone call  11/19/2014 DONE
DetailsCandy A. Nichols
didn't call, Nicole came in
Plan assigned to (JG)11/10/201411/10/201411/14/2014 DEFR
DetailsJavier Guzman
11/20 TH L1
Routing - PLANNING11/12/2013 11/13/2014 PASS
DetailsSue Cummings
See redlines on site plan re: required parking in the front setback.
Routing - Addressing11/10/2014 11/12/2014 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  11/10/2014 DONE
DetailsCandy A. Nichols
Intake Approval  11/10/2014 PASS
DetailsCandy A. Nichols
Recd Pcfee & Taken To Pln CK  11/10/2014 DONE
DetailsCandy A. Nichols
Telephone call  11/10/2014 DONE
DetailsCandy A. Nichols
called Nicole, we need the full size sheet of the site plan and we also are waiting for the ACCA and res check-left message on her machine
Routing - PUBLIC WORKS11/12/2014 11/12/2013 PASS
DetailsConnie Baumgartner
Application received 11/10/2014